Datasets:

Modalities:
Text
Formats:
json
Languages:
English
Size:
< 1K
DOI:
Libraries:
Datasets
pandas
License:
codelion commited on
Commit
38b411b
1 Parent(s): 7d8877d

Update ws-qa-eval.jsonl

Browse files
Files changed (1) hide show
  1. ws-qa-eval.jsonl +2 -2
ws-qa-eval.jsonl CHANGED
@@ -4,8 +4,8 @@
4
  {"question": "What should the formation of Risk Assessment Teams include?", "options": "A) Only management staff\n B) Only employees directly involved in the work activities\n C) Representatives from both management and non-management levels\n D) Only third-party consultants experienced in risk assessments", "answer": "C"}
5
  {"question": "What is the purpose of the Inventory of Work Activities form?", "options": "A) To list out all workplace accidents and incidents\n B) To identify the work activities and sub-activities to be assessed\n C) To document the risk control measures implemented\n D) To evaluate the severity and likelihood of each hazard", "answer": "B"}
6
  {"question": "When should existing controls be considered during risk evaluation?", "options": "A) Only when assessing the severity of the hazard\n B) Only when assessing the likelihood of the hazard occurring\n C) When assessing both severity and likelihood\n D) Existing controls should not be considered during risk evaluation", "answer": "C"}
7
- {"question": "What should be done if the risk level is determined to be High Risk?", "options": "A) Implement interim administrative controls before starting work\n B) The risk must be reduced to at least \"Medium Risk\" before work starts\n C) Personal protective equipment can be used as the primary control\n D) No action is required as long as the hazard is clearly communicated", "answer": "B"}
8
- {"question": "After implementing additional risk controls, what should be done to the risk assessment record?", "options": "A) Create a new risk assessment record\n B) Update the \"Existing Controls\" column and remove \"Additional Controls\"\n C) No updates are required to the existing record\n D) Discard the existing record and start a new one", "answer": "B"}
9
  {"question": "When should the Risk Assessment Team consider residual risks?", "options": "A) Only after all possible risk controls have been implemented\n B) During the hazard identification stage\n C) When determining the severity and likelihood ratings\n D) After implementing risk controls but before updating records", "answer": "D"}
10
  {"question": "What should the Risk Assessment Team do if they have difficulty reaching a consensus on severity or likelihood ratings?", "options": "A) Use the highest proposed rating to be conservative\n B) Use the lowest proposed rating to minimize disruption\n C) Gather more information and/or consult an industry expert\n D) Assign a default medium rating and proceed", "answer": "C"}
11
  {"question": "What is the minimum recommended video resolution for the cameras in a Video Surveillance System (VSS)?", "options": "A) 480p\n B) 720p\n C) 1080p\n D) 4K", "answer": "C"}
 
4
  {"question": "What should the formation of Risk Assessment Teams include?", "options": "A) Only management staff\n B) Only employees directly involved in the work activities\n C) Representatives from both management and non-management levels\n D) Only third-party consultants experienced in risk assessments", "answer": "C"}
5
  {"question": "What is the purpose of the Inventory of Work Activities form?", "options": "A) To list out all workplace accidents and incidents\n B) To identify the work activities and sub-activities to be assessed\n C) To document the risk control measures implemented\n D) To evaluate the severity and likelihood of each hazard", "answer": "B"}
6
  {"question": "When should existing controls be considered during risk evaluation?", "options": "A) Only when assessing the severity of the hazard\n B) Only when assessing the likelihood of the hazard occurring\n C) When assessing both severity and likelihood\n D) Existing controls should not be considered during risk evaluation", "answer": "C"}
7
+ {"question": "What should be done if the risk level is determined to be High Risk?", "options": "A) Implement interim administrative controls before starting work\n B) The risk must be reduced to at least Medium Risk before work starts\n C) Personal protective equipment can be used as the primary control\n D) No action is required as long as the hazard is clearly communicated", "answer": "B"}
8
+ {"question": "After implementing additional risk controls, what should be done to the risk assessment record?", "options": "A) Create a new risk assessment record\n B) Update the Existing Controls column and remove Additional Controls\n C) No updates are required to the existing record\n D) Discard the existing record and start a new one", "answer": "B"}
9
  {"question": "When should the Risk Assessment Team consider residual risks?", "options": "A) Only after all possible risk controls have been implemented\n B) During the hazard identification stage\n C) When determining the severity and likelihood ratings\n D) After implementing risk controls but before updating records", "answer": "D"}
10
  {"question": "What should the Risk Assessment Team do if they have difficulty reaching a consensus on severity or likelihood ratings?", "options": "A) Use the highest proposed rating to be conservative\n B) Use the lowest proposed rating to minimize disruption\n C) Gather more information and/or consult an industry expert\n D) Assign a default medium rating and proceed", "answer": "C"}
11
  {"question": "What is the minimum recommended video resolution for the cameras in a Video Surveillance System (VSS)?", "options": "A) 480p\n B) 720p\n C) 1080p\n D) 4K", "answer": "C"}