## Alternative schedules By utilizing the building block, we can search for different types of schedules depending on the need. We illustrate few of them here below: * 1F1B-V schedule without doing any B-W split. * Schedule with 2/3rd 1F1B memory by utilising B-W split. Note that two microbatches are included in a single building block to avoid collision. * Variation of interleaved 1F1B with lower memory