audio
audioduration (s)
0.52
29
start_time
stringlengths
12
12
end_time
stringlengths
12
12
text
stringlengths
6
328
00:00:00.000
00:00:06.000
Eurocom, I'll be starting with the check on the AP for the HX in the Columbus module.
00:00:06.000
00:00:10.000
Could you confirm the last few commands verified by the SCC?
00:00:10.000
00:00:15.000
Following that, I'll need to monitor the MIPS performance on the PDH system.
00:00:20.000
00:00:24.000
Next, I'll inspect the ATU for any audio issues.
00:00:24.000
00:00:28.000
Do we have any logs on recent ATU malfunctions?
00:00:28.000
00:00:32.000
For the MTL test today, I'll need to address the CO2 levels.
00:00:32.000
00:00:35.000
How are the readings from the ACS looking?
00:00:35.000
00:00:38.000
I'll then perform maintenance on the BIU.
00:00:38.000
00:00:42.000
Has the ORU been prepped for the replacement?
00:00:42.000
00:00:47.000
Could you provide the latest data from the AFS in the Columbus module?
00:00:47.000
00:00:51.000
I'm particularly interested in the readings near the OA location.
00:00:51.000
00:00:56.000
Lastly, I'll need to check the WCOS for any anomalies.
00:00:56.000
00:01:00.000
Can you confirm the sensor status from the last system check?
00:01:00.000
00:01:04.000
Please keep me updated with any critical changes as I proceed.
00:00:00.000
00:00:07.000
Eurocom, status check on the PWS. All functions are nominal. Please confirm.
00:00:07.000
00:00:13.000
I have inspected the VBSP. No issues detected. Can you verify from your end?
00:00:13.000
00:00:18.000
Reporting from the COF. HW systems are all operational.
00:00:18.000
00:00:23.000
Confirming LEO parameters. Everything is within expected ranges.
00:00:23.000
00:00:29.000
Check the NLSOV. It is functioning correctly. Please confirm.
00:00:29.000
00:00:33.000
C&C systems are fully operational. No anomalies to report.
00:00:33.000
00:00:38.000
I have adjusted the MPEV. Pressure levels are nominal.
00:00:38.000
00:00:42.000
Reviewing the IDF logs. No discrepancies found.
00:00:42.000
00:00:47.000
Requesting verification on the OEM parts for the latest hardware updates.
00:00:47.000
00:00:53.000
Transferring data to the FMC. Please confirm receipt and data integrity.
00:00:54.000
00:00:59.000
RS-422 connections are stable. No communication issues detected.
00:00:59.000
00:01:04.000
Inspecting the SOZ panel. Everything appears nominal.
00:01:07.000
00:01:13.000
NA for the current task list. Let me know if there is anything specific you need.
00:00:00.000
00:00:08.000
Eurocom, status update on the SAW. Everything appears nominal. Please confirm.
00:00:08.000
00:00:15.000
I've checked the VAPS readings. Can you verify if the current values align with expected parameters?
00:00:15.000
00:00:22.000
Performing a diagnostic on the ABC. No issues detected. Do you need a detailed report?
00:00:22.000
00:00:27.000
Reviewing the SFDE quadrant. All systems operational.
00:00:27.000
00:00:34.000
Initiating a routine check on the VPM. Can you confirm the latest software update version?
00:00:34.000
00:00:39.000
Confirming starboard orientation. All systems nominal.
00:00:39.000
00:00:44.000
I've completed the SFC inspection. No anomalies to report.
00:00:44.000
00:00:50.000
HK procedures are underway. Any specific tasks you need prioritized?
00:00:51.000
00:00:56.000
Running diagnostics on the POC. Please confirm if there are any recent updates.
00:00:56.000
00:01:02.000
Checking the IDAGS for any discrepancies. Everything looks standard.
00:01:02.000
00:01:09.000
ECLSS status is nominal. No issues detected in the current cycle.
00:01:09.000
00:01:14.000
Transmitting the MRD logs. Please confirm receipt and integrity.
00:01:14.000
00:01:19.000
Inspecting the IAS. No issues found. Please verify from your end.
00:01:19.000
00:01:25.000
LTHX parameters are within limits. Do you require any additional data?
00:00:00.000
00:00:05.000
Eurocom, I'm ready to perform the R&R on the central thermal bus.
00:00:05.000
00:00:08.000
Can you confirm the procedure steps for me?
00:00:08.000
00:00:12.000
I also need the current status of the GLA in the Columbus module.
00:00:12.000
00:00:15.000
Is there any recent data on that?
00:00:15.000
00:00:20.000
Once the R&R is complete, I'll proceed to check the PPCS readings.
00:00:20.000
00:00:25.000
Are there any anomalies in the current CO2 levels on the ATM?
00:00:25.000
00:00:30.000
Just a heads up, I've been running through the procedures again in the SSTF
00:00:30.000
00:00:33.000
and I feel confident with the tasks ahead.
00:00:33.000
00:00:38.000
Can you provide any updates on the XPOP configuration for today's tasks?
00:00:38.000
00:00:42.000
I'll be working on the PDH unit shortly after the CTB task.
00:00:42.000
00:00:47.000
Any recent issues reported with the MMU that I should be aware of?
00:00:47.000
00:00:50.000
Also, I noticed some fluctuations in the TCV settings.
00:00:50.000
00:00:55.000
Could you check the MTL parameters to ensure everything is within the normal range?
00:00:55.000
00:00:58.000
I'll keep you updated as I progress.
00:00:00.000
00:00:04.000
Eurocom, CDA check complete. All systems are nominal. Please confirm.
00:00:05.000
00:00:09.000
Inspecting the OSS. No smoke detected. Can you verify from your end?
00:00:10.000
00:00:13.000
ACS has been initiated. Monitoring progress.
00:00:14.000
00:00:19.000
Checked. IRSOV. It is functioning correctly. Please confirm.
00:00:20.000
00:00:24.000
MSM intersection done. All mechanical structures are operational.
00:00:25.000
00:00:28.000
PA panel status is nominal. No issues to report.
00:00:28.000
00:00:31.000
LAN connections are stable. No anomalies detected.
00:00:32.000
00:00:35.000
SF panel inspection complete. Everything is nominal.
00:00:36.000
00:00:40.000
Running diagnostics on the EPM. All systems are operational.
00:00:41.000
00:00:43.000
PSM check complete. Power distribution is stable.
00:00:44.000
00:00:47.000
QD connections are secure. No issues found.
00:00:48.000
00:00:50.000
TRE session complete. Ready for the next training task.
00:00:51.000
00:00:55.000
MilSTD. Compliance check done. Everything is within standards.
00:00:56.000
00:00:59.000
MSM systems are functioning normally. Please confirm.
00:01:00.000
00:01:02.000
SD status is green. No smoke detected.
00:01:03.000
00:01:06.000
USOS systems are operational. No animal is to report.
00:01:07.000
00:01:11.000
Voltage readings are stable at 28 volt. Please confirm.
00:01:13.000
00:01:16.000
CWSA DM check complete. No issues detected.
00:01:17.000
00:01:22.000
OPS procedures are being followed. All tasks are on schedule.
00:00:00.000
00:00:09.000
Eurocom ELA check complete. Emergency lighting assembly is operational. SWRU status is nominal.
00:00:09.000
00:00:16.000
Software replaceable unit functioning correctly. Air quality readings are at 10 CFU/m3.
00:00:16.000
00:00:24.000
Please confirm if this is within acceptable limits. F panel inspection done. All systems are nominal.
00:00:24.000
00:00:31.000
PL status is green. Payload operations are running smoothly. SCC check complete.
00:00:31.000
00:00:38.000
Starboard cone panel central cone side is nominal. SSRMS is operational.
00:00:38.000
00:00:44.000
Remote manipulator system functioning correctly. CFA inspection done.
00:00:44.000
00:00:53.000
Cabin fan assembly is running normally. MDPS status is nominal. Meteoroid and debris protection system is intact.
00:00:53.000
00:00:59.000
Coordinating with JSC on upcoming tasks. All systems are nominal.
00:00:59.000
00:01:06.000
Communication frequency set to 145.8 MHz. Please verify.
00:01:07.000
00:01:18.000
No OOL conditions detected. All parameters are within limits. ELS checks complete. Emergency lighting strip is operational.
00:01:18.000
00:01:24.000
USS status is green. User services software is functioning correctly.
00:00:00.000
00:00:09.320
Eurocom FST check complete. Fluid sample collected successfully. LT systems are stable. Temperature
00:00:09.320
00:00:19.600
readings are within limits. OF inspection done. Everything is nominal. WPA is operational.
00:00:19.600
00:00:30.120
No issues detected. IMCU diagnostics complete. All systems are nominal. Reviewing OPM for
00:00:30.120
00:00:38.560
current operations. No anomalies found. SDN panel status is green. External payloads are
00:00:38.560
00:00:45.560
functioning correctly. APS is operational. Automated switching is working as expected.
00:00:46.560
00:00:56.720
SOPZ interface check complete. Everything is nominal. PFE inspection done. Ready for emergency use.
00:00:56.720
00:01:08.040
MDBD update complete. All data entries are verified. MDP check in the JEM is nominal. No
00:01:08.040
00:01:17.880
issues detected. LL H readings are stable. No adjustments needed. SCM panel inspection complete.
00:01:17.880
00:01:26.720
All systems operational. RAM check done. Memory usage is within limits. Act logs have been updated.
00:01:26.720
00:01:39.280
All activities are on schedule. C&C MDM status is nominal. No anomalies detected. SCF inspection
00:01:39.280
00:01:53.000
complete. Everything is operational. IVA procedures were being followed. No issues to report. SOP
00:01:53.080
00:02:01.400
interface check complete. All systems are nominal. DP readings are within expected range. Please
00:02:01.400
00:02:13.640
confirm. ACP is running smoothly. No issues detected. SADE panel status is nominal. All systems
00:02:13.640
00:02:26.920
operational. APID check complete. All identifiers are correct. NSTS systems are operational.
00:02:27.960
00:02:36.120
No issues to report. CDH systems are functioning correctly. Data handling is nominal.
README.md exists but content is empty. Use the Edit dataset card button to edit it.
Downloads last month
2
Edit dataset card