project_id
stringlengths
7
7
document_text
stringlengths
0
892k
document_type
stringclasses
2 values
P003523
Document of The World Bank FOR OFFICIAL USE ONLY Report No\. 17935 IMPLEMENTATION COMPLETION REPORT CHINA SHANDONG PROVINCIAL HIGHWAY PROJECT (LOAN 3073-CHA/CREDIT 2025-CHA) June 1, 1998 Transport Sector Unit East Asia and Pacific Regional Office This document has a restricted distribution and may be used by recipients only in the performance of their official duties\. Its contents may not otherwise be disclosed without World Bank authorization\. CURRENCY EQUIVALENTS Currency Unit = Yuan (Y) = 100 Fen 1989 $1= Y 3\.76 1990 $1= Y 4\.78 1991 $1= Y 5\.32 1992 $1= Y 5\.76 1994 $1= Y 8\.60 1995 $1= Y 8\.35 1996 $1= Y 8\.30 1997 $1=Y8\.30 FISCAL YEAR January 1 - December 31 WEIGHTS AND MEASURES 1 meter (m) = 3\.28 feet (ft 1 kilometer (km) = 0\.62 mile (mi) 1 square kilometer (km2) = 0\.4 square miles (mi ) 1 hectare (ha) = 0\.01 km = 2\.47 acres (ac) = 15 mu 2 1 mu = 666\.7 m = 0\.0667 ha Vice President Jean-Michel Severino, EAPVP Country Director Yukon Huang, EACCF Sector Manager Jeffrey Gutman, EASTR Task Manager Hatim Hajj, Principal Transport Specialist, EASTR FOR OFFICIAL USE ONLY ABBREVIATIONS AND ACRONYMS ADT - Average Daily Traffic DF - Diversion Factor E&M - Electronic, Electrical and Mechanical ERR - Economic Rate of Return FRR - Financial Rate of Return HPDI - Highway Planning and Design Institute HSRI Highway Scientific Research Institute ICB - International Competitive Bidding ICR - Implementation Completion Report JQE - Jinan-Qingdao Expressway JQEMB - Jinan-Qingdao Expressway Management Bureau LCB - Local Competitive Bidding MOC - Ministry of Communications NPV - Net Present Value PCR - Project Completion Report pkm - Passenger-kilometer PMS - Pavement Management System RDB - Road Data Bank SAR - Staff Appraisal Report SPTD - Shandong Provincial Transport Department tkm - Ton-kilometer TOR - Terms of Reference vkm - Vehicle-kilometer VOC - Vehicle Operating Cost This document has a restricted distribution and may be used by recipients only in the performance of their official duties\. Its contents may not otherwise be disclosed without World Bank authorization\. CONTENTS PREFACE \. iii EVALUATION SUMMARY \.v PART I: PROJECT IMPLEMENTATION ASSESSMENT \.1 A\. Project Objectives and Description \. 1 B\. Achievement of Project Objectives \. 2 C\. Implementation Record and Major Factors Affecting the Project \. 11 D\. Project Sustainability \. 12 E\. Bank Group Performance \. 13 F\. Borrower Performance \. 14 G\. Assessment of Outcome \. 15 H\. Future Operations \. 16 I\. Key Lessons Learned \. 16 PART II: STATISTICAL TABLES \. 18 Table 1: Summary of Assessments \. ;\.18 Table 2: Related Bank Group Loans/Credits \. 19 Table 3: Project Timetable \. 20 Table 4: Loan/Credit Disbursement: Cumulative Estimate and Actual \. 20 Table 5: Key Indicators for Project Implementation \. 21 Table 6: Key Indicators For Project Operations \. 21 Table 7: Studies included in Project \. 21 Table 8a: Project Costs \. 22 Table 8b: Project Costs \. 23 Table 8c: Project Financing \. 24 Table 9: Economic Costs and Benefits \. 24 Table 10: Status of Legal Covenants \. 25 Table 11: Compliance with Operational Manual Statements \. 26 Table 12: Bank Group Resources: Staff Inputs \. 26 Table 13: Bank Group Resources: Missions \. 26 ANNEX 1: ECONOMIC AND FINANCIAL EVALUATION \. 27 TABLE 6: FINANCIAL EVALUATION \. 44 ANNEX 2: BORROWER'S CONTRIBUTION TO THE ICR \. 46 ANNEX 3: APRIL 1997 SUPERVISION MISSION'S AIDE MEMOIRE \. 57 I - 111 - IMPLEMENTATION COMPLETION REPORT CHINA SHANDONG PROVINCIAL HIGHWAY PROJECT (LOAN 3073-CHA/CREDIT 2025-CHA) PREFACE This is the Implementation Completion Report (ICR) for the Shandong Provincial Highway Project in China for which Loan 3073-CHA in the amount of $60 million equivalent and Credit 2025-CHA in the amount of SDR 38\.8 million ($50\.0 million equivalent) were approved on September 8, 1989 and made effective on December 11, 1989\. The loan and credit were frilly disbursed and the last disbursement took place on July 24, 1997\. The ICR, under the guidance of Messrs\. Otto Raggambi (Consultant, Highway Engineer) and Hatim Hajj (Task Manger), Transport Department (EASTR) of the East Asia and Pacific Region was prepared by Manzoor Rehman (Consultant)\. Mr\. Han-Kang Yen (Research Analyst) carried out economic and financial analysis for the completed project\. The borrower's implementation evaluation summary for the project is annexed to the ICR\. Preparation of this ICR began in April 1997, and an ICR mission had discussions with representatives of the Ministry of Communications (MOC) and the Shandong Provincial Transport Department (SPTD) regarding the preparation of the ICR\. The ICR is based on discussions held in the field, materials available in the project file and additional data provided by SPTD\. SPTD has also submitted to the Bank Group a copy of its evaluation report for the Jinan-Qingdao Expressway (JQE) and other project components\. CHINA SHANDONG PROVINCIAL HIGHWAY PROJECT (LOAN 3073-CHA/CREDIT 2025-CHA) EVALUATION SUMMARY Introduction and Project Objectives 1\. In response to increasing demand for road transport services arising from the accelerated development of the economy during the early 1 980s the Chinese Government decided to accord high priority to increasing road transport capacity in heavily trafficked corridors connecting major cities and industrial centers in the various regions of the country\. The Shandong Provincial Highway Project was formulated to provide adequate road transport capacity in the Jinan-Qingdao corridor through the construction of a new high-class highway\. In addition, the scope of project also included the following components for technology transfer to provincial institutions involved in the road transport subsector: (a) improving road planning techniques; (b) evaluating paved road network condition and preparing pavement strengthening and maintenance management programs; (c) developing institutional capacity for supervising road construction works; (d) carrying out staff training; (e) strengthening highway research; and (f) improving road safety\. 2\. The objectives and the scope of the project reflected the road infrastructure improvement priority of Shandong Province, the Central Government's developmental strategy and the Bank Group's assistance strategy for the road transport subsector\. Implementation Experience and Results 3\. The main objective of the project of meeting road transport demand in the heavily trafficked corridor between Jinan and Qingdao was achieved by completing the construction of the 319 km Jinan-Qingdao Expressway (JQE) by the end of 1993\. The 1997 average daily traffic on the Expressway was higher than that projected at appraisal\. However, because of the substantial increase in the overall investment in the JQE compared to appraisal assumptions, the ICR's estimate of about 19 percent for the ERR falls below the appraisal estimate of 23 percent\. In addition to cost increases over and above appraisal estimates, mostly due to the impact of high inflation during the implementation period, additional items of works were undertaken and further expenditures incurred, which were not taken into account at the time of project appraisal\. However, most of the additional investments were made in the interest of enhancing the operational efficiency of the JQE\. These included the cost of the installation of traffic - vi - monitoring, telecommunications and tolling systems, the construction of service and maintenance facilities and fencing of the JQE's right-of-way along its entire length\. 4\. Civil works were completed as scheduled and the JQE was opened to traffic at the end of 1993\. However, the completion of the project as a whole was delayed by about two years, due primarily to the delayed completion of the installation of traffic monitoring, telecommunications and tolling systems\. The circumstances leading to the delay were such that the Bank Group had no objection to extending the loan and credit closing dates by two years to June 30, 1997\. 5\. The key features of the implementation of the other project components are as follows: (a) Equipment acquisition for the maintenance of the JQE was delayed by almost two years and the type and number of units acquired were modified resulting in an about 50 percent increase in cost\. There was no substantial change in the acquisition of equipment for road condition survey and road research\. Equipment for traffic monitoring, telecommunications and tolling systems were not procured separately as originally planned\. Instead, the Bank Group agreed to the financing of a contract covering both the supply of equipment and the installation works for establishing these systems\. A small amount was used for acquiring safety equipment following the recommendations of a study of the JQE's safety problc (b) The staff training program was implemented more or less as planned and with only minor deviation in cost\. However, almost twice as many people were involved in the training programs but over shorter periods of training\. (c) A pilot study for pavement evaluation and formulation of road improvement and management programs was satisfactorily completed under a Finnish bilateral aid\. The expansion of the program for the primary 17,000 km national and provincial network of the Province commenced in the early 1990s and made good progress to date\. (d) Because of the excessively high rate of traffic accidents on the JQE a highway safety study was conducted in early 1997\. This study was a substitute for a pilot road safety study originally formulated for addressing the road safety concerns on the national/provincial road network of the province\. The study's recommendations are being followed up by the agencies responsible for the management and traffic safety aspects of the JQE\. Summary of Findings, Future Operations, and Key Lessons Learned 6\. Notwithstanding some of the deficiencies noted during the implementation of the JQE, the two-year delay in project completion and the significantly higher-than- envisaged overall cost, the project was completed satisfactorily\. The ICR estimate of the - vii - ERR, although lower than that at appraisal, confirms that the project's development objectives were also achieved\. Furthermore, the condition of the JQE's civil works and the benefits emanating from the investment are sustainable, and are not expected to be exposed to future risks\. 7\. The Jinan-Qingdao Expressway Management Bureau (JQEMB), which was set up as the agency responsible for the administration of the JQE at the end of 1993, is adequately staffed and has the material and financial resources to ensure the satisfactory operation and maintenance of the Expressway\. The relatively high rate of accidents remains a major concern despite the measures being taken by JQEMB, jointly with the Traffic Safety Unit of the Public Security Administration, to mitigate accident hazards as a follow-up to the findings and recommendations of the traffic safety study completed in May 1997\. 8\. The following lessons learned are relevant to the still ongoing and future Bank Group-financed highway projects: 9\. Project Preparation and Costing\. The scope of the highway component of the project lacked clear definition and consistency\. Thus, the project highway was not built according to a well-conceived and well-defined concept; it rather "evolved" into an expressway facility in the course of implementation\. As it happened, this deficiency has not been detrimental to the viability of the JQE\. The higher cost of the JQE was compensated by higher-than-expected stream of benefits on account of the higher-than- expected diversion of the corridor traffic to the JQE\. Nevertheless, the deficiency of the formulation of the project has been transparent enough to put it on record, even if there were mitigating circumstances for it at the time of project formulation: (a) the Borrower had no clear policy for the development of the strategic highway network for the country; (b) constraints on the availability of counterpart funding for the project must have been seen as a major risk; and (c) limited experience with the design and operation of the electronic, electrical and mechanical works (traffic monitoring, telecommunications and tolling) for tolled highways that could explain the initial omission of some highway- related expenditure items from the project\. Notwithstanding these considerations, it could be argued that the Bank Group could have been more alert to the potential disadvantages in proceeding with the financing of the Jinan-Qingdao Highway with a vague definition of its scope and ultimate objectives\. 10\. Highway Safety\. The traffic safety record of recently completed Bank Group- financed highways has been a major cause for concern\. The high rates of accidents on recently built expressways also bring into question the conventional notion that expressways are safer than the arterial roads of the network\. Although there is no conclusive statistical evidence either way, the indications are that the Chinese drivers' lack of experience in handling vehicles at high speeds, combined with the relatively poor condition of the vehicle fleet, have been the major causes of the excessive rate of accidents on high-standard highways\. Since the road safety is a complex issue, which extends well beyond engineering aspects, the ICR issued for the Jiangxi Provincial - viii - Highway Project already highlighted the importance of formulating a comprehensive road safety strategy for China and recommended to the Bank Group to intensify its dialogue with the Central Government on the issues involved\. Well-documented evidence of the safety record of the JQE adds further urgency to the earlier recommendation regarding highway safety issues\. 11\. Preparation and Execution of Electronic, Electrical and Mechanical (E&M) Works for Expressways\. The two-year delay of the completion of the project is partly attributable to the fact that initially the project covered only the acquisition of equipment associated with traffic monitoring, telecommunications and tolling but not its installation\. Although, the decision to include the full extent of the works in the project under Bank Group financing was made soon after the commencement of civil works, the preparation and processing of the E&M works proceeded very slowly\. Since similar delays occurred under other Bank Group-financed highway projects under implementation in the early 1990s, the Bank Group, in consultation with MOC, initiated steps that now ensure that the design and technical specifications for E&M works are completed more or less at the same time as the design and the technical specifications for the civil works contracts\. CHINA SHANDONG PROVINCIAL HIGHWAY PROJECT (LOAN 3073-CHA/CREDIT 2025-CHA) PART I: PROJECT IMPLEMENTATION ASSESSMENT A\. PROJECT OBJECTIVES AND DESCRIPTION 1\. China joined the World Bank Group in 1980 and lending operations began soon after\. However, Bank Group involvement with highway infrastructure only began in April 1983, with the identification of the first Highway Project (Loan 2539/Credit 1954- CHA)\. The project provided funding for the improvement of provincial roads and the construction of critical missing links in nine provinces, particularly those that constrained interprovincial road transport\. Although the involvement was limited, this initial step helped familiarize the Bank Group with the highway subsector issues in China and to identify subsectoral priorities in subsequent projects\. It became apparent that the shortage of capacity in heavily congested corridors of the national and provincial road networks constitutes one of the major impediments to the development of the country's economy at an accelerated rate\. Under the Seventh Five-Year Plan (7FYP, 1986-90) and subsequent five-year plans, measures were taken to address the needs for road transport capacity improvements in the key corridors of the national and provincial road networks\. The Bank Group was supportive of such objectives of the Government as reflected in the Bank Group's lending strategy for the development of the highway subsector in China\. From FY85 until the present, in addition to this project, the Bank Group approved the financing of 17 highway projects as listed in Table 2, Part II, of this report\. A PCR was issued for the first Highway Project, and ICRs have been issued for the Shaanxi, Jiangxi and Sichuan provincial highway projects, the Beijing-Tianjin-Tanggu Expressway Project and the Jiangsu Provincial Transport Project\. 2\. The existing arterial roads between Jinan and Qingdao were of low capacity and became heavily congested by the end of the 1980s\. The project's primary objective therefore was to provide a high-capacity, high-standard highway in this important corridor between Jinan the capital of Shandong Province and Qingdao, one of the main ports in China\. The project also aimed to achieve the following policy and institutional development objectives: (a) improving road planning techniques; (b) evaluating pavement conditions on selected sections on the road network and preparing a pilot pavement strengthening and maintenance management programs; (c) developing institutional capacity for supervising road construction works; (d) carrying out staff training; (e) strengthening highway research; and (f) improving road safety\. - 2 - 3\. Under the overall supervision of the Ministry of Communications (MOC) and the Shandong Provincial Government the Shandong Provincial Transport Department (SPTD) was designated as the executing agency for administering the preparation, design and implementation of the project\. The project comprised: (a) the construction of a 319 km four-lane divided highway between Jinan and Qingdao; (b) consulting services to assist SPTD in construction supervision and help train SPTD staff in day-to-day supervision and quality control functions; (c) acquisition of road condition survey equipment, evaluation of existing road pavements and preparation of a pavement strengthening and maintenance management pilot program for 560-km of the road network; (d) acquisition of equipment for road maintenance, traffic monitoring, telecommunications and tolling systems, and road research; (e) conducting training courses for SPTD staff; and (f) improving road safety\. 4\. The Bank Group approved the Bank loan and the IDA credit for the project in May 1989\. The scope of the project was in line with investment priorities for road transport infrastructure improvement in Shandong Province, and was also consistent with the Central Government's policy and the Bank Group's assistance strategy for the development of the road transport subsector in China\. B\. ACHIEVEMENT OF PROJECT OBJECTIVES 5\. Project objectives were substantially achieved as indicated by the implementation summaries of the various project components in the following\. Jinan-Qingdao Expressway (JQE) 6\. Preparation, Design and Scope\. The preliminary engineering and the economic feasibility study for the highway was completed in the latter part of 1986, and the study's recommendations were endorsed in principle shortly thereafter by the Central Government\. A Bank Group contact mission visited Shandong Province in February 1987, following which the survey and design institutes of MOC, located in Xian and Beijing, and the Shandong Provincial Highway Design Institute proceeded with the preparation of the engineering design for the highway\. Later on a local/foreign joint venture of consultants helped finalize the design and the preparation of bidding documents\. These services were partially financed under the US Trade Development Program\. 7\. Originally, the highway was designed to Class I highway standards, although already during the project appraisal SPTD expressed its preference to change the geometric standards of the highway from Class I to expressway standards\. Since the highway's alignment traverses flat terrain throughout its length, the only major difference in geometric parameters between the two alternatives was the formation width, which was 23 m for Class I highways and 26 m for expressways (Table 1\.4 of SAR)\. In October 1987, the Shandong Provincial Transport Department requested the Bank Group's assessment regarding the economic viability of building the Jinan-Qingdao highway to expressway standards\. In December 1987, the Bank Group advised SPTD as well as the -3 - Central Government that, according to its analysis, the expressway design option with 26 m formation width yielded a higher "net present value", and that, the Bank Group, in general, was supportive of the concepts of longer-term objectives, and had no objection to building the new highway with a 26 m wide formation\. Considering that the difference in the economic viability of the alternatives were not significant, the Bank Group also indicated that it was prepared to finance either alternative\. However, SPTD failed to obtain Central Government endorsement for the change, seemingly for budgetary reasons\. A likely other reason for the Central Government's position could have been that it had no strategy at that time for the development of an interprovincial expressway network for the country and its standards, and that had not crystallized until the early 1990s\. China now has a clear strategy and well defined design standards for its expressway network\. 8\. As a compromise, shortly before negotiations an understanding was reached between SPTD and the Bank Group, with the consent of the Central Government, that the most heavily trafficked section between Jinan and Zibo (120\.3 km), would be built with 26 m formation width, while on the other segments of the highway the formation would remain 23 m wide\. While this was a relatively slight change in scope, the partial acceptance of expressway geometric standards was significant because it opened the door for the broadening of the scope of the works, and during implementation additional investments were made to ensure that by the time all works were completed, the requirements for operating the new highway as a tolled expressway are fully met\. 9\. Civil Works\. The JQE is located more or less centrally between the northern and southern arterial roads and carries motorized vehicles only\. The two parallel arterial roads in the corridor will continue to serve motorized and nonmotorized local traffic\. In addition to serving a densely populated rural corridor, JQE links four major cities-Jinan, Zibo, Weifang and Qingdao-with a population of 3\.4, 2\.7, 7\.8 and 6\.2 million, respectively\. There are 21 interchanges to connect JQE to the corridor's arterial and secondary road network\. Civil works were executed under eight contracts, of which seven contracts were awarded following ICB procedures and one contract award was made following national bidding\. 10\. Compared to similar major highway projects constructed under Bank Group financing, such as the Beijing-Tianjin-Tanggu Expressway, and those in Shaanxi, Jiangxi and Sichuan provinces (Table 1 of Part II), there were relatively few major deviations from the original engineering design\. The major additional works and variations that have occurred included: (a) the change of the type of material for backfilling of embankments at structures to reduce the risk of excessive settlements; (b) adding retaining walls to bridge approaches to reduce the extent of acquisition of valuable agricultural land; (c) building one additional interchange in the vicinity of Shouguang township at km 158+640 to provide for traffic to be generated by new residential and commercial developments; and (d) providing guard rails on embankments exceeding 3 m in height, rather than 4 m in height as originally envisaged\. The major works executed to meet expressway operational requirements, which were originally not covered by the scope of the project, included (a) the construction of roadside facilities along the Expressway, -4 - comprising 21 toll stations, 7 service areas and 11 buildings for general and toll administration and maintenance depots; and (b) erecting protective fencing along the Expressway\. 11\. Implementation and Supervision\. The Expressway was substantially completed and opened to traffic in December 1993\. The execution of the works was not proceeding without problems\. Although the local contractors were prequalified, they lacked experience in carrying out major highway works of comparable magnitude and complexity, managerial skills and material and financial resources\. As highlighted in the quarterly progress reports and observed during Bank Group supervision missions, the civil works were not carried out consistently according to the technical specifications\. The Bank Group's April 1993 supervision mission, for example, noted defective workmanship and materials during the execution of several phases of the ongoing works as well as the lack of adequate supervision\. Consequent on such observations, an understanding was reached with SPTD about the measures to be taken for improving the quality of construction and the effectiveness of supervision operations\. The Bank Group also insisted that a foreign supervisor be mobilized, in addition to two site supervision engineers already on site, to assist with the quality control in general and with the critical phase of asphalt paving works in particular\. The executing agency complied with the Bank Group's requests and also assured the Bank Group that the contractors, as instructed by the supervision units, had corrected and will be correcting deficient works to ensure that the technical specifications are met\. 12\. A foreign consulting firm, engaged to assist SPTD in construction supervision, provided 124 person-months of services\. A combined team of SPTD and foreign and local engineers were responsible for on-site supervision and quality control, and ensuring that works on the JQE were carried out in full compliance with the technical specifications\. The supervision organization set up for this purpose comprised a Central Supervision Unit, headed by the Chief Supervision Engineer, and five Resident Supervision Units located along the alignment of the Expressway\. The foreign engineering personnel helped establish the framework and procedures for the supervisory work and trained the SPTD staff, local engineers and technicians\. Such training was not only a significant means of technology transfer but also an essential measure for trying to ensure effective control of the quality of JQE construction with adequately trained personnel\. The performance of the supervision units was generally satisfactory, except for periodic lapses, as highlighted in para\. 11\. Despite these difficulties, the intervention of SPTD and the supervision units eventually ensured that the quality of construction met the technical requirements\. Overall, the effectiveness of supervision seems to be proven by the relatively infrequent and only minor correcting works emerged following the completion of JQE\. 13\. Traffic Monitoring, Telecommunications and Tolling Systems [Electronics, Electrical and Mechanical (E&M) Worksl\. The original scope of the project covered only partially the equipment requirements of the E&M works and did not include at all the systems' software development and installation works\. However, the Bank Group -5 - already in the early phase of the implementation agreed to utilize a portion of the unallocated loan/credit proceeds for financing a supply and installation contract to undertake the entire E&M works\. Because SPTD primarily focused on the timely completion of JQE's civil works and it lacked experience with the type of E&M works required for expressway operations, the formulation and design of this component was delayed\. The bidding documents were issued only in March 1995, and further delays were encountered during ICB procurement, bid evaluation and clearance of the contract award processes at provincial and national levels as well as in the Bank Group\. Consequently, the for E&M works supply and installation contract was awarded only in May 1996\. Moreover, there were delays in establishing the letter of credit for this contract\. The contractor's mobilization of sufficient manpower and other resources proceeded slowly, and the installations of the systems suffered further delays\. Thus, the commissioning of systems was completed only at the end of June 1997 and trial operations commenced in July 1997\. Fortunately, the delays had no substantive adverse effect on the operation of the JQE\. Traffic has been using the Expressway since December 1993, and tolls were collected since then using temporary toll collection facilities\. The supervision of the E&M works was carried out satisfactorily by a group of local experts specially selected for the task from various institutions\. The personnel and the scope of sevices of the group was approved by the Bank Group\. 14\. Improving Road Safety\. Road accident statistics for the Province, which was reviewed during project preparation revealed that road safety concerns warranted urgent attention\. It was therefore agreed at negotiations that a Road Safety Program will be carried out under the project\. The scope of the Program was designed to be in line with the recommendations of the China Road Safety Project, which was financed under the first Highway Project (Loan 2539-CHA/Credit 1594-CHA), and the experience gained from the Sichuan Road Safety Pilot Program, executed by the Highway Scientific Research Institute (HSRI) of MOC with the assistance of foreign experts during 1987\. The objective of the Shandong Road Safety Program was to collect and analyze traffic accident data on two major provincial roads (200 km in total length), which would have helped identify high frequency accident locations (black spots)\. Such data would have led to the implementation of safety measures for reducing the number of traffic accidents (Annex 3 of the SAR)\. This pilot exercise for identifying road safety measures was to be eventually extended to cover the more heavily trafficked segments of the national and provincial road network of the Province\. However, SPTD had encountered administrative difficulties in the execution of this project component since in the late 1980s the Central Government decided to transfer the responsibility for traffic safety, including accident data collection and decisions on improvement measures for accident reductions, from the Provincial Transport departments to the Public Securities departments nationwide\. Initially, SPTD requested the Bank Group's concurrence to the deletion of this project component\. However, soon after the JQE was opened to traffic, there was a rapid buildup of an alarmingly high number of accidents\. Thus the Bank Group agreed to SPTD's request that a comprehensive assessment should be made of the prime reasons for the high accident rates on the JQE instead of the original pilot road safety program\. During - 6 - 1994-97, the average annual number of accidents was about 1,000, resulting in 300 injuries and 100 fatalities\. 15\. With the support of SPTD, reputable international road safety experts carried out, according to terms of reference approved by the Bank, a 45-day investigation during February and March 1997\. The experts' June 1997 report details the findings of the study and also outlines a 13-point action plan for accident reduction measures\. The report identified poor driver behavior and excessive speed as the major causes of accidents\. This is also reflected in the high proportion (49 percent) of single-vehicle accidents of which many resulted in fatalities\. In addition to the drivers' lack of experience in traveling on high-speed highways, overloaded vehicles and vehicle defects, narrow shoulders on the 23 m wide sections of the JQE, poor geometry of exit and entry points at interchanges, and lack of safety provisions for maintenance crews were also substantive contributing factors to the poor safety record of the JQE\. The implementation of the recommended safety plan for the JQE will require the coordinated effort of JQEMB and the Traffic Police Unit of the Public Security Department\. As a first step, JQEMB proceeded with the acquisition of traffic safety-related goods and equipment, including computer hardware and software, warning signals for vehicles, beacon lights, and reflective clothing for expressway maintenance crews\. Some of these equipment were financed under the project\. 16\. Land Acquisition and Resettlement\. The cost of land acquisition and resettlement related costs increased from Y 37\.06 million to Y 262\.00 million\. The expenses covered the removal and relocation of communication and electricity cables, intersecting and service roads, drainage and irrigation systems, dwellings and other buildings, and compensation payments for land and resettlement\. Additional works were required and higher cost incurred in infrastructure relocation and rehabilitation than originally expected\. Higher cost was also incurred at an archeological site to ensure the adequacy of protection\. The substantial difference between the estimated cost and eventual expenditure can also be explained by the difficulties in making realistic cost estimates during project preparation of a massive program involving the acquisition of about 6,600 acres of land and relocation of about 30,000 individuals without prior experience in carrying out a program of similar magnitude and complexity\. Moreover, because of the substantial interval between the time when the original estimates were made and the time of compensation payments, inflation and property value appreciation had a major impact on the final cost\. As confirmed by the Bank Group's November/December 1994 Resettlement Review Mission, the land acquisition, resettlement and compensation procedures agreed at negotiations were substantially followed\. 17\. Environmental Protection\. Since the JQE traverses flat terrain, the construction of the JQE was expected to have only very limited adverse impact on the environment\. The engineering design and technical specifications provided specific treatments for the protection of embankment slopes and roadside drainage, which were applied during implementation\. During the construction of the JQE, no adverse environmental problem -7 - emerged\. Some erosion or slope failure could occur on the higher embankment section of the JQE, with a risk of temporary disruption and potential pollution to irrigation channels\. However, JQEMB would be well equipped to handle such emergencies promptly and efficiently\. Also, it is plausible to assume that there has been a reduction of noise and air pollution in towns and villages along the arterial roads because of the diversion of traffic to the JQE from the parallel arterial roads\. 18\. Investment Costs\. In the SAR the civil works construction cost of the highway was estimated at Y 1,603\.24 million, including physical and price contingencies\. A comparable final cost of JQE's civil works was Y 1,975\.94 million, representing a cost increase of Y 372\.70 million, about 23 percent, in current prices\. Of this amount, about 40 percent was related to greater-than-expected physical quantities and extra works carried out under variation orders, and the remaining amount was paid to the contractors as compensation for price escalation\. Other major Expressway-related expenditures included (a) supply and installation of equipment for E&M works\. (Y 125\.34 million); (b) consultant services for construction supervision (Y 40\.50 million); (c) construction of facilities along the Expressway, such as service areas, administration buildings and maintenance depots (Y 203\.50 million); (d) acquisition of equipment for the maintenance of the Expressway (Y 51\.13 million); (e) land acquisition and resettlement (Y 262\.0 million\.); (f) design and survey (Y 30\.92 million); (g) administrative overhead (Y 52\.02 million); and (h) foreign exchange adjustment cost (Y 99\.26 million)\. Including the above, and some other minor cost items, the final investment cost of the JQE in current prices became Y 2,850\.39 million, as detailed in Table 2A of Annex 1\. This cost is not directly comparable to the about Y 1,700\.00 million investment cost for the highway presented in the SAR because the substantial expansion of the scope of the highway works to meet expressway operational requirements were not contemplated at the time of project appraisal\. 19\. Economic Evaluation\. The ICR economic analysis is presented in Annex 1\. The ERR on the JQE investment is estimated at 19\.1 percent versus the SAR estimate of 23\.0 percent\. The reestimation of the ERR was based on the JQE's final investment cost, converted to economic cost at 1997 prices\. The ICR analysis of ERR also included revised indices for shadow pricing, actual corridor traffic data on the JQE reflecting the split of traffic between the two parallel arterial roads and JQE during 1994-97, revised traffic forecast during 1998-2015, and updated vehicle operation costs (VOCs)\. The relatively small difference between the SAR and ICR estimates for ERR is the combined effect of the higher cost being well compensated by the higher benefits accruing from the greater-than-expected buildup of JQE traffic during the last four years, and the expectation that a similar trend will continue during 1998-2015\. The key conclusion of the economic evaluation are: (a) The economic cost of Y 4,229\.90 million arrived at in the ICR calculation is about 67\.9 percent higher than the Y 2,520\.00 million presented in the SAR, based on December 1997 constant prices\. -8 - (b) The 1997 average daily traffic (ADT) in the corridor of the Expressway differed only marginally from that forecast in the SAR\. However, the split of traffic between the two arterial roads located on the northern and southern side of the JQE and on the JQE was somewhat different from that expected at appraisal\. The rate of diversion of traffic on Section I of the Expressway (Qingdao-Weifang) was about 55 percent higher than forecast\. On Section 2 (Weifang-Zibo) it was about 8 percent higher, while on Section 3 (Zibo-Jinan) the difference was insignificant\. (c) The 1997 daily traffic on Sections 1 and 3 well exceeded SAR forecast but fell below somewhat of the forecast level on Section 2\. However, the net result was that the 1997 ADT traffic on the JQE, in terms of the weighted average daily traffic per kilometer on the three sections of the JQE, was 390,000 vehicle- kilometer (vkm)/day higher than the SAR forecast, a difference of about 12 percent\. Such increase represents a substantially higher level of VOC savings for 1997 than assumed during project appraisal\. (d) Higher VOCs and associated benefits are expected to be sustainable in the future, even with somewhat lower annual traffic growth rates than presented in the SAR (para\. 8 of Annex 1)\. 20\. Financial Evaluation\. The toll revenue is the only source of income from the JQE\. The toll charges were changed once (in July 1995) since the opening of JQE to traffic in December 1993 and are still in force\. The revenues increased by an average of 38\.3 percent a year during the first three years of operation (1994-96)\. The financial cost of Y 3,063\.65 million included the investment cost of Y 2,850\.38 million for the JQE, as well as Y 212\.97 million, representing loan/credit servicing cost, taxes and the cost of minor project components (Table 2A of Annex 1)\. The estimated financial rate of return (FRR) against the financial costs is 8\.8 percent\. The revenue stream generated is expected to cover future operating and maintenance costs of the JQE and also meet still outstanding financial obligations on borrowings\. The detailed financial analysis is presented in Table 6 of Annex 1\. 21\. Tolling\. The expressway is operated as a closed toll system with 21 toll stations\. The toll rates are determined according to the types of vehicle and distance traveled\. As stipulated in Section 2\.06 of the Project Agreement, the toll rates charged should not exceed 30 percent of the VOC savings for the various groups of vehicles\. On average, the toll rates for large-size vehicles are comparable to, and on medium-size vehicles, tractor- trailers, are only slightly higher than 30 percent of the VOC savings\. However, the toll rates for small-size vehicles well exceed 30 percent of the VOC savings\. The sections of the JQE on which the travel distance is significantly shorter than on the parallel arterial roads, the 30 percent of VOC savings are close or even higher than the toll rates\. This could indicate that toll rates higher than 30 percent of VOC savings are not necessarily a deterrent to road users, if it results from substantial distance and time savings\. The economic and financial VOCs and 30 percent of the VOC savings, as of 1997, are - 9- presented in Table 7 of Annex 1\. The outcome of the analysis is approximate and indicative only\. A comprehensive origin and destination survey-based study of the JQE traffic would be required for reaching more reliable conclusions regarding the relationship between toll charges and VOC savings\. Obviously, this could not be done within the scope of this ICR\. Equipment Procurement 22\. The following groups of equipment were to be purchased under the project at an estimated cost of $13\.20 million, including physical and price contingencies: (a) maintenance equipment, including five types, 25 units for $4\.00 million; (b) instruments and equipment for the road condition survey program, three types and four units for $0\.25 million; (c) research equipment for central road laboratory, three types, 19 units for $0\.80 million; and (d) equipment for traffic monitoring, telecommunications and tolling for $8\.15 million\. 23\. The maintenance equipment acquired under item (a) exceeded the original estimate in terms of types, number of units and cost\. SPTD had requested and the Bank Group agreed to the procurement of additional equipment and altogether 18 types, 28 units were acquired for $6\.16 million\. The about 50 percent increase in investment for highway maintenance equipment was well justified, considering the close to 320 km length of the JQE and SPTD's complete lack of modern maintenance equipment for high- class highways\. The additional cost was covered from the unallocated contingency category of the loan proceeds\. 24\. The acquisition cost of instruments and equipment for road condition survey and Road Data Bank (RDB), item (b) above, as well as instruments and equipment for the road laboratory, item (c) above, were within the budget allocated for these purposes\. The actual expenditures were $0\.18 million and $0\.49 million, respectively\. However, the list of items purchased differed somewhat from those listed in Tables 3\.1 and 3\.4 in the SAR based on a further review of requirements during project implementation\. 25\. As elaborated in para\. 13, traffic monitoring, telecommunications and tolling systems for the JQE were provided through a supply and install contract, and equipment related to this component of the project was not procured separately\. 26\. The road safety measure-related equipment acquisition was an addition to the project, at a cost of $17,000, including computer hardware and software, warning signals for vehicles, beacon lights and reflective clothing for expressway maintenance crews\. Staff Training 27\. Training of SPTD Staff\. The training program implemented comprised training courses and study tours conducted in several European countries, the United States, Canada and Thailand\. The training courses, under 15 separately organized programs, covered the following topics: highway planning and design, highway and bridge - 10- construction, project, pavement, equipment, highway maintenance and financial management, expressway operations including tolling and overall highway administration, and RDB and Pavement Management System (PMS) programs and applications\. Most of the training courses were prepared and administered under an MOC-coordinated program, involving the staff of several other provincial transport departments, which were executing agencies of simultaneously ongoing Bank Group- financed highway projects with staff training components\. The training program commenced in July 1991 and was completed during the first half of 1997\. 28\. A total of 89 persons participated in the program, involving about 112 person- months, at an overall cost of $920,000, i\.e\. about $8,200/person-month\. The program as envisaged would have included the training of 37 persons involving 150 person-months at an estimated cost of $900,000, corresponding to $6,000/person-month\. The training program as executed involved more than twice as many trainees but with shorter periods of training\. This resulted in higher overall costs of travel and accommodation, which, in addition to inflation, could explain the higher-than-expected per person-month cost of training\. The person-months cost of training is similar to those incurred under other recently completed Bank Group-financed highway projects in China\. Pavement Evaluation, Road Data Bank and Pavement Management System 29\. Originally, the road pavement evaluation component of the project was to be carried out by SPTD with the assistance of consultants financed from the proceeds of the Bank Group loan/credit in accordance with the terms of reference presented in Annex 2 of the SAR\. However, shortly before the conclusion of the loan/credit negotiations, an agreement was reached between the Chinese and Finnish governments that this project component will be undertaken by SPTD with the assistance of a Finnish technical team under bilateral aid\. Thus, SPTD and a team from the Finnish National Road Administration proceeded with a pilot study during March 1989 and June 1990 to evaluate existing pavement conditions of road segments totaling 560 km in the Jining District of the Province\. The report of the study was completed in April 1991\. The pilot study identified equipment, materials and manpower resources required for road condition survey, prepared programs for pavement strengthening and maintenance management for the pilot district\. The comprehensive computerized system established was suitable for determining investment priorities for the paved roads, and also laid the groundwork for the development of a program for paved road strengthening and maintenance management for Shandong Province\. 30\. The system developed under the pilot study was functional and quite suitable for applying it to the main paved network of the Province\. However, it was decided to bring the system developed under the pilot program in line with the nationwide programs, which evolved in the interim based on the Chinese RDB and PMS\. In the early 1990s good progress was made on the development and pilot application of both programs by the Highway Planning and Design Institute (HPDI) and the Highway Scientific Research Institute (HSRI), respectively, under the guidance and coordination of MOC\. The merging of the Jining District pilot program and the nationwide programs took place during 1991-93\. Thereafter, the RDB has been built up gradually for the core 17, 000 km national and provincial network, and the PMS has been introduced in all 17 prefectures/municipalities of the Province\. C\. IMPLEMENTATION RECORD AND MAJOR FACTORS AFFECTING THE PROJECT 31\. Although the overall completion of the project was delayed by about two years, its main objective, i\.e\., to relieve traffic congestion in the Jinan-Qingdao corridor, was achieved with the opening of the JQE to traffic at the end of 1993 as planned\. The two- year project completion delay was predominantly due to the delay in the preparation, procurement and implementation of the E&M works\. However, it was possible to commence toll collection through taking temporary measures; thus, cost recovery suffered no delays\. 32\. Delays in the implementation of E&M works occurred for a number of reasons\. It seems that at the time of project preparation there was no firm timetable for operating the Jinan-Qingdao Highway as a tolled facility\. Such uncertainty is reflected in the scope of works presented in the SAR, which did not cover the installation component of E&M works, the construction of roadside facilities and fencing of the highway's right-of-way, provisions that are normally required for the efficient operation of a tolled expressway\. One of the reasons for the somewhat vague definition of the scope of the Expressway works could have been the absence of the Central Government's firm policies on tolled expressways in the early 1990s\. During implementation, at SPTD's request, the Bank Group agreed to the financing of the foreign exchange components of a supply and installation contract for the E&M works from the uncommitted balance of the loan/credit proceeds\. However, with the limited experience in China in the planning, design and procurement of this type of works, the delays that occurred are understandable\. Some further delay occurred also during the execution of the contract\. 33\. The additional investments for providing roadside facilities, covering the construction of buildings for general and toll administration and maintenance depots, and fencing of the JQE's right-of-way to ensure that motorized vehicle entry to and exit from the JQE can take place only at interchanges, and to keep away pedestrians, tractors, animal-drawn vehicles from the Expressway, were made by the Province under local financing, following consultation with the Bank Group\. 34\. Despite the limited experience of the civil works contractors in similar large-scale highway works, the periodic lapses in performance and lack of consistency and effectiveness of quality control by the supervision units the JQE was completed satisfactorily\. This is substantiated by the fact that no substantive technical deficiency surfaced during the almost four-year operation of the JQE\. However, the very high level of accidents remains a major concern, although with the execution of the safety program recommended by the recent safety study there is a good chance that the safety record of the JQE would improve over time\. - 12- 35\. The timing of the completion of the relatively minor components of the project shifted also because of the lower priority accorded these components after realizing that an overall delay of about two years could no longer be avoided on account of the delay to the E&M works\. Thus, equipment acquisition and some of the training prograrn were finalized only during the first half of 1997\. Regarding the acquisition of maintenance equipment for the JQE, delays were encountered during the preparation of bidding documents by designated procurement agencies and internal clearance processes, which required the submission of documentation for all imported equipment to a designated State agency\. 36\. The objectives of the pilot program for pavement evaluation and the development of a methodology for the preparation of road investment and maintenance programs were achieved, and its extension to the 17,000 km core arterial road network of the Province proceeded well\. Such progress was supported by the development of the RDB and PMS programs nationwide under the Central Government's initiative and coordination and their introduction to all prefectures and municipalities of the Province\. The SAR did not stipulate any particular timetable for such expansions of the programs but the advances made to date by the Province in this respect are commendable\. D\. PROJECT SUSTAINABILITY 37\. The physical condition of the JQE has shown no signs of adverse deterioration since it has been in service\. The increase in corridor traffic is expected to continue in line with the trend of the economic development in the influence area of the JQE, and the Expressway's share of traffic is expected to remain significant\. Thus, there is no discernible risk to the steady growth in toll revenues, which should be adequate for funding the administrative and maintenance expenses of the JQE, the servicing of debt and the repayment of the loan and credit as scheduled\. 38\. The maintenance equipment fleet acquired under the project should provide adequate long-term service, since operators have been trained, sufficient stock of essential spares have been purchased and maintenance facilities have been provided\. 39\. The information from the staff training program is expected to be disseminated within the provincial institutions involved, reach the majority of SPTD personnel and have a long-term influence on provincial road administration and management methods and highway-specific technology\. 40\. The methodology of the pavement evaluation pilot study and application of the Chinese RDB and PMS programs have been deployed in all prefectures and municipalities of the Province\. It is expected that, with the regularly collected input data, the system will provide the necessary output information to help make improved investment decisions for road improvement and maintenance as part of the budgetary process\. - 13 - E\. BANK GROUP PERFORMANCE 41\. The scope of the project, in general, was in line with the sectoral investment priorities and the development objectives of the Province and the Central Government and with the Bank Group's assistance strategy for China in the late 1980s\. However, the formulation of the project lacked clarity regarding the requirements for the construction of a new highway in the Jinan-Qingdao corridor\. The Province was in favor of adopting an expressway design standards for the new highway from the beginning; however, during the project's preparation the Central Government was unwilling to endorse the Province's request, seemingly for budgetary reasons, and Class I highway design standards were adopted for the new highway over most of its length (para\. 7 and 8)\. During implementation, the scope of the Jinan-Qingdao Highway was expanded into a full-fledged tolled expressway, except that the formation width remained 3 m narrower over a 200 km section of the highway\. It could be argued whether the Bank Group should have had the foresight and firmness to formulate the highway component of the project fully meeting expressway requirements from the beginning\. 42\. A comparative economic evaluation for the highway design standard alternatives was not carried out as part of the ICR evaluation\. However, the traffic safety study (para\. 15) identified the narrower shoulders and central medians as safety risk features with very limited recourse for corrective measures\. Since the width of the pavements are the same for both a Class I highway and an expressway design alternative, the 3 m reduction in the formation width required the narrowing of shoulders and central median\. The other negative aspect of the lack of clarity concerning the exact nature of the specifications for the new highway was that substantive additional investments had to be made during implementation, as detailed in para\. 10, to achieve the requirements for operating the new highway as a tolled expressway\. 43\. Despite these negative aspects of the piecemeal adjustments made to the scope of the JQE during its construction, it would be farfetched to level the blame on the Bank Group for the way the highway was formulated\. It should be recognized that the development of the strategic interprovincial expressway system at the end of the 1980s and the beginning of the 1990s was in a transitional phase\. The Bank Group would not have been prudent to insist on a higher-level investment in this project against the firm views of the Central Government\. Furthermore, the economic evaluation methodologies were not sufficiently refined to draw firm conclusions from minor geometrical differences on the overriding merits between the alternatives\. As it happened, other than the safety aspect referred to in para\. 15, no adverse impact has been noticed regarding the operation of the JQE as an effect of the manner the JQE was implemented\. 44\. The Bank Group mounted 10 supervision missions during 1990-97, which is on average just slightly more than one mission per year\. On other Bank Group-financed highway projects that were implemented more or less simultaneously with the Shandong Provincial Highway Project, the frequency of supervision missions was closer to two per year\. A plausible explanation for this is that considering staff resource constraints and the -14- fact that most of the other ongoing highway projects encountered greater implementation difficulties than this project, there was no major risk involved by lowering the frequency of missions\. Furthermore, SPTD gained experience during the execution of the Shandong provincial road component of the first Highway Project, and the advantage of such experience was well manifested in SPTD's ability to handle the execution of the project without major risk and difficulty\. Thus, the Bank Group's involvement in the implementation of the project was adequate and commensurate with the level of local experience and complexity of the project\. 45\. The Bank Group has shown flexibility in dealing with the changes in the project's scope, such as the financing of one additional interchange, the supply and installation contract for E&M works and not just the equipment acquisition as originally planned, and a safety study for the JQE instead of a pilot safety study for the provincial road network\. Also, in response to the Borrower's request to extend the closing date by one year, the Bank Group concluded that a two-year extension was more realistic for completing the still outstanding works\. During this period SPTD also proceeded with the extension of the scope of the JQE by providing administrative and maintenance facilities along the JQE and fencing the right-of-way of the JQE\. The Bank Group had no objection to carrying out these works as part of the project, although these works had to be financed entirely by the Province since the loan and credit funds had already been fully committed\. F\. BORROWER PERFORMANCE 46\. SPTD under the first Highway Project was exposed to implementation management practices normally associated with Bank Group-financed projects\. The benefit of that experience was apparent during the preparation and administration of the project\. Moreover, SPTD has had a reputation as one of the most experienced road administrations in China with a well-constructed and well-maintained road network\. The Borrower and SPTD have complied substantially with the conditionalities of the loan, credit and project agreements\. The Bank Group's procedural requirements were substantially followed, although there were gaps and delays in SPTD meeting progress reporting requirements\. The cooperation between the Borrower, the Executing Agency and the Bank Group was cordial and professional throughout the preparation, appraisal and implementation of the project\. 47\. SPTD can take credit for the substantial completion of the JQE's civil works as scheduled\. As indicated in the preceding, the experience of civil works contractors in the implementation of highway works to international specifications was limited\. However, despite the problems encountered by the contractors from time to time on account of a shortage of material supplies, lack of financial resources and contract administration skills, SPTD was able to help overcome such difficulties with its managerial and technical experience and the support of the supervision units\. 48\. Since the experience with the supply and installation of traffic monitoring, telecommunications and tolling systems in China was very limited in the early 1 990s, it is - 15 - understandable that SPTD had problems in defining the scope of the required E&M works for the JQE\. Delays occurred not only in the preparation but also in the procurement and execution of the works\. The process for obtaining internal clearances for the bidding documents was also much slower than expected due to the cumbersome internal clearance process of equipment procurement involving some departments of the Central Government\. G\. ASSESSMENT OF OUTCOME 49\. The project was implemented satisfactorily and its objectives have been substantially achieved\. The main component of the project, the construction of the JQE, was completed and opened to traffic at the end of December 1993, as scheduled\. The development objectives of the project have also been achieved and the economic reevaluation presented in this report confirmed that the investment in the JQE was economically viable, with a slightly lower estimate for the ERR than that of the SAR\. Furthermore, the economic benefits are considered to be sustainable without any predictable elements of risk\. Because of the favorable prospect for continued strong economic activity in the influence area of the JQE, the road user benefits as well as toll revenues are expected to increase proportionally with the rate of traffic growth\. 50\. Overall, the contractors' performance was adequate despite periodic lapses in the quality of works and recurrent problems with material and financial resources\. The executing agency's prior experience in the administration of Bank Group-financed road works, combined with technical and administrative competence, was a major attribute to the satisfactory outcome of the project\. The supervision units also performed satisfactorily, despite periodic lapses in their perseverance and effectiveness in controlling quality\. 51\. The level of impact of technology transfer through training is not easy to measure due to a lack of well-defined baseline parameters\. Nonetheless, the training courses and study tours were a useful means of technology transfer and provided a satisfactory level of exposure to new concepts and incentives for adoption in the Chinese environment\. Similarly, technology transfer through modern equipment for the operation and maintenance of the JQE should achieve its objectives and ensure that the JQE will be efficiently operated and adequately maintained\. 52\. The pilot pavement evaluation study was implemented satisfactorily\. The local personnel participating in the pilot program gained valuable experience in the various aspects of the system's development\. The progress on sectoral development in the context of the expansion of RDB and PMS programs for the core arterial road network of the Province has been also good\. This was achieved through the adoption of the Chinese RDB and PMS programs, which were developed for nationwide applications and required some adjustment to the system evolved from the Jining District pilot study\. At present, the RDB and PMS programs are operational in all 17 prefectures/municipalities of the Province and cover the primary paved network of 17,000 km\. - 16- 53\. Overall, the project was implemented within the terms of the development credit and loan agreements, and in substantial compliance with the Bank Group's procedural requirements\. The credit and loan proceeds were not extended to any component of the project without obtaining prior clearance from the Bank Group\. H\. FUTURE OPERATIONS 54\. Since the end of 1993 the operation and maintenance of the JQE, has been the responsibility of JQEMB\. As demonstrated over the last four years, JQEMB is a well- organized and technically competent institution to have such responsibility\. The operational and financial parameters of the JQE, such as traffic volume, tolling revenues, traffic accident records, annual maintenance fees and administrative overhead expenditures will be monitored routinely, and the performance of the JQE will be periodically reassessed in terms of ERR and FRR\. JQEMB is in the process of consolidating administrative and operational rules and regulations in staff manual formats\. 55\. SPTD will continue to make improvement to the RDB and PMS programs\. A new version of the computer model for PMS should be operational by the end of 1998\. Having the RDB and PMS programs in place, the appropriate application of these programs should help optimize the benefits from road improvement and maintenance investments\. 56\. There could be a major change in the ownership and management of the JQE if Shandong Province succeeds in selling a portion (60 percent) of the JQE to a Hong Kong- based financial institution\. The remaining portion of the assets of the Expressway would be administered by a stock holding company to be established, and the shares of the company would be listed on one of the Chinese stock exchanges\. The JQE was valued at Y 5\.2 billion in early 1997\. The Bank Group has informed the Province and the Central Govermment about its no-objection to such transformation of ownership for the JQE in principle, subject to receiving specific documentation on the terms of the transactions and regulations involved, as required by the Bank Group\. I\. KEY LESSONS LEARNED 57\. Project Preparation and Costing\. The scope of the highway component of the project lacked clear definition and consistency\. Thus, the project highway was not built according to a well-conceived and well-defined concept; it rather "evolved" into an expressway facility in the course of implementation\. As it happened, this deficiency has not been detrimental to the viability of the JQE\. The higher cost of the JQE was compensated for by higher-than-expected stream of benefits on account of the higher- than-expected diversion of corridor traffic to the JQE\. Nevertheless, the deficiency of the formulation of the project has been transparent enough to put it on record, even if there were mitigating circumstances for it at the time of project formulation: (a) the Borrower had no clear policy for the development of a strategic highway network for the country; and (b) constraints on the availability of counterpart fumding for the project must have been seen as a major risk; and (c) limited experience with the design and operation of - 17- electronic, electrical and mechanical works (traffic monitoring, telecommunications and tolling) which could explain the initial omission of some highway-related expenditure items from the project\. Notwithstanding these considerations, it could be argued that the Bank Group could have been more alert to the potential disadvantages in proceeding with the financing of the Jinan-Qingdao highway with a vague definition of its scope and ultimate objectives\. 58\. Highway Safety\. The traffic safety record of recently completed Bank Group- financed highways has been a major cause for concern\. The high rates of accidents on recently built expressways also bring into question the conventional notion that expressways are safer than arterial roads of the network\. Although there is no conclusive statistical evidence either way, the indications are that the Chinese drivers' lack of experience in handling vehicles at high speeds, combined with the relatively poor condition of the vehicle fleet, have been the major causes of the excessive rate of accidents on high standard highways\. Since road safety is a complex issue, which extends well beyond engineering aspects, the ICR issued for the Jiangxi Provincial Highway Project already highlighted the importance of formulating a comprehensive road safety strategy for China and recommended to the Bank Group to intensify its dialogue with the Central Government on the issues involved\. Well-documented evidence of the safety record of the JQE adds further urgency to the earlier recommendations regarding highway safety issues\. 59\. Preparation and Execution of E&M Works for Expressways\. The two-year delay of the completion of the project is partly attributable to the fact that initially the project covered only the acquisition of equipment associated with traffic monitoring, telecommunications and tolling, but not its installation\. Although, the decision to include the full extent of the works in the project under Bank Group financing was made soon after the commencement of civil works, the preparation and processing of the E&M works proceeded very slowly\. Since similar delays occurred under other Bank Group- financed highway projects under implementation in the early 1990s, the Bank Group, in consultation with MOC, initiated steps that now ensure the design and technical specifications for E&M works are completed more or less at the same time as the design and the technical specifications for the civil works contracts\. - 18- PART II: STATISTICAL TABLES TABLE 1: SUMMARY OF ASSESSMENTS A\. Achievement of Objectives Substantial Partial Negligible Not Applicable Macroeconomic policies x Sector policies X Financial objectives (cost recovery) X Institutional development X Physical objectives X Poverty reduction X Gender issues X Other social objectives X Environmental objectives X Public sector management X Private sector development X B\. Project Sustainability Likely Unlikely Uncertain x C\. Bank Group Performance Highly Satisfactory Satisfactory Deficient Identification x Preparation assistance X Appraisal X Supervision X D\. Borrower Performance Highly Satisfactory Satisfactory Deficient Preparation X Implementation X Covenant compliance X Operation (if applicable) X E\. Assessment of Outcome Highly Satisfactory Unsatisfactory Highly Satisfactory Unsatisfactory x - 19 - TABLE 2: RELATED BANK GROUP LOANS/CREDITS Year of Loan/credit title Purpose approval Status Highway Project Provincial road network FY85 completed Ln\.2539-CHA/Cr\. I 954-CHA expansion/ improvement Beijing-Tianjin-Tanggu Expressway Project see footnote La FY87 completed Ln\.281 I-CHA/ Cr\. 1792-CHA Sichuan Provincial Highway Project see footnote La FY88 completed Ln\.295 I -CHA/ Cr\. 1917-CHA Shaanxi Provincial Highway Project see footnote La FY88 completed Ln\.2592-CHA Jiangxi Provincial Highway Project see footnote La FY89 completed Cr\. 1984-CHA Jiangsu Provincial Transport Project see footnote La FY91 completed Ln\.3316-CHA/Cr\.2226-CHA Zhejiang Provincial Highway Project see footnote La FY92 ongoing Ln\.3471-CHA Henan Provincial Highway Project see footnote /a FY93 ongoing Ln\.3531-CHA Guangdong Provincial Highway Project see footnote La FY93 ongoing Ln\.3530-CHA Fujian Provincial Highway Project see footnote La FY94 ongoing Ln\.3681 -CHA Hebei/Henan National Highway Project see footnote La FY94 ongoing Ln\.3748-CHA Xinjiang Highway Project I see footnote La FY95 ongoing Ln\.3787-CHA Shanghai-Zhejiang Highway Project see footnote La FY96 ongoing Ln\.3929-CHA Second Shaanxi provincial Highway Project see footnote /a FY96 ongoing Ln\.3986-CHA Second Henan Provincial Highway Project see footnote La FY96 ongoing Ln\.4027-CHA Second Xinjiang Highway Project see footnote La FY97 ongoing Ln\.4099-CHA Second National Highway Project see footnote La FY97 ongoing Ln\.4124-CHA /a These highway projects, typically, have had the following components: (i) construction of a major highway; (i) improvement of provincial roads; (iii) procurement of road maintenance equipment; and (iv) institutional development components, such as RDB and PMS programs, staff training and selected subsector-oriented studies\. - 20 - TABLE 3: PROJECT TIMETABLE Steps in project cycle Date planned Date actual Identification (Executive Project Summary) 08/87 08/87 Preparation 10/87 04/88 Appraisal 01/88 07/88 Negotiations 04/88 04/89 Board presentation 06/88 05/89 Signing 09/89 09/89 Effectiveness 12/89 12/89 Project completion 12/94 06/97 Loan closing 06/95 06/97 TABLE 4: LOAN/CREDIT DISBURSEMENT: CUMULATIVE ESTIMATE AND ACTUAL (US$ million) FY90 FY91 FY92 FY93 FY94 FY95 FY96 FY97 FY98 Appraisal estimate 11\.00 22\.00 48\.40 77\.00 101\.20 110\.00 Actual 7\.00 18\.05 46\.29 74\.03 87\.76 89\.95 94\.00 105\.73 110\.00 Actual as % of adjusted estimate 64\.0 82\.0 95\.0 96\.0 86\.0 82\.0 85\.5 96\.1 100\.00 Date of final disbursement July 24, 1997 -21 - TABLE 5: KEY INDICATORS FOR PROJECT IMPLEMENTATION Estimated LZ Actual Key implementation indicators in SAR Start Complete Start Complete 1\. Highway Construction 04/89 06/94 06/90 12/93 2\. Equipment for Pavement Evaluation 06/89 04/90 01/92 02/93 3\. Equipment for Road Maintenance 09/91 10/92 07/95 06/97 4\. Equipment for Traffic Monitoring 05/93 05/93 06/96 06/97 5\. Road Data Bank 12/90 12/94 02/96 06/97 6\. Consulting Services 08/89 12/94 07/90 12/93 7\. Staff Training Lb 06/89 12/92 07/90 07/97 8\. Road Safety NA NA 02/97 06/97 La Pages 73-74 of the Staff Appraisal Report\. Lb Most of the staff training program was completed by the end of 1996\. TABLE 6: KEY INDICATORS FOR PROJECT OPERATIONS Length (Iam) Traffic (1997 ADT) Estimated Actual Estimated Actual Highway Construction Qingdao-Weifeng 100\.00 100\.00 7,541 10,763 Weifeng-Zibo 98\.00 98\.00 11,946 10,609 Zibo-Jinan 121\.00 120\.30 10,680 12,317 Total 319\.00 318\.30 TABLE 7: STUDIES INCLUDED IN PROJECT Study Purpose as defined at Appraisal/Redefined Status Impact of Study Pavement Management SPTD proposed to evaluate the condition Completed Implemented in all 17 prefec- and Strengthening Study of the paved roads in order to prepare a tures and covers full length of strengthening program and to review the the 17,000 km paved road organizational and operational aspects of network\. paved roads maintenance to bring them up to date\. - 22 - TABLE 8A: PROJECT COSTS (Y million) Appraisal estimate Actual/atest estimate Item Local Foreign Total Local Foreign Total Jinan-Qingdao highway 563\.28 585\.89 1,149\.17 1383\.16 592\.78 1,975\.94 Consultant services for supervision 20\.00 4\.80 24\.80 26\.80 13\.70 40\.50 Equipment for road strengthening program 0\.00 0\.75 0\.75 0\.00 1\.48 1\.49 Road planning (Road Data Bank) 0\.00 1\.85 1\.85 0\.00 4\.32 4\.32 Road maintenance equipment 0\.00 11\.10 11\.10 0\.00 51\.13 51\.13 Research equipment for central road 0\.00 2\.22 2\.22 0\.00 4\.07 4\.07 laboratory Traffic monitoring and communication 0\.00 22\.80 22\.80 44\.00 81\.34 125\.34 equipment Staff training 0\.00 3\.33 3\.33 0\.00 7\.64 7\.64 Technical assistance and road safety 0\.00 0\.37 0\.37 0?00 0\.83 0\.83 equipment Subtotal 583\.28 633\.11 1,216\.39 1,453\.96 757\.29 2,211\.25 Additional Cost Items Design and Survey 30\.92 0\.00 30\.92 Facilities along JQE 203\.50 0\.00 203\.50 Research; test-section of JQE 4\.88 0\.00 4\.88 Overhead 52\.02 0\.00 52\.02 Foreign exchange loss 99\.26 0\.00 99\.26 Loan/credit serivicing and tax 199\.82 0\.00 199\.82 Subtotal 590\.40 0\.00 590\.40 Base Cost 583\.28 633\.11 1,216\.39 2,044\.36 757\.29 2,801\.65 Physical contingencies 58\.33 63\.31 121\.64 Price contingencies 232\.54 99\.89 332\.43 Subtotal 874\.15 796\.31 1,670\.46 Land acquisition cost 37\.06 - 37\.06 262\.00 0\.00 262\.00 Total Project Cost 911\.21 796\.31 1,707\.52 2,306\.36 757\.29 3,063\.65 - 23 - TABLE 8B: PROJECT COSTS (US$ million) Appraisal estimate Actual/latest estimate Item Local Foreign Total Local Foreign Total Jinan-Qingdao highway 152\.24 158\.35 310\.59 346\.56 148\.53 495\.09 Consultant services for supervision 5\.40 1\.30 6\.70 3\.23 1\.65 4\.88 Equipment for road strengthening program - 0\.20 0\.20 0\.00 0\.18 0\.18 Road planning (Road Data Bank) - 0\.50 0\.50 0\.00 0\.52 0\.52 Road maintenance equipment - 3\.00 3\.00 0\.00 6\.16 6\.16 Research equipment for central road - 0\.60 0\.60 0\.00 0\.49 0\.49 laboratory Traffic monitoring and communication - 6\.15 6\.15 5\.30 9\.80 15\.10 equipment Staff training - 0\.90 0\.90 0\.00 0\.92 0\.92 Technical assistance and road safety 0\.00 0\.10 0\.10 0\.00 0\.10 0\.10 equipment Subtotal 355\.09 168\.35 523\.44 Additional Cost Items Design and Survey 7\.73 0\.00 7\.73 Facilities along JQE 29\.07 0\.00 29\.07 Research; test section of JQE 0\.70 0\.00 0\.70 Overhead 10\.40 0\.00 10\.40 Foreign exchange loss 19\.85 0\.00 19\.85 Loan/credit servicing and tax 39\.96 0\.00 39\.96 Subtotal 107\.72 0\.00 107\.72 Base Cost 157\.64 171\.10 328\.74 462\.81 168\.35 631\.16 Physical contingencies 15\.76 17\.11 32\.87 Price contingencies 24\.87 27\.00 51\.87 Subtotal 198\.27 215\.21 413\.48 Land acquisition cost 10\.02 - 10\.02 70\.81 0\.00 70\.81 Total Project Cost 208\.29 215\.21 423\.50 532\.62 168\.35 701\.97 - 24 - TABLE 8c: PROJECT FINANCING (US$ million) Appraisal estimate Actual/late estimate Source Local Foreign Total Local Foreign Total IBRD/IDA 0\.00 110\.00 110\.00 0\.00 110\.00 110\.00 Central Government 40\.50 0\.00 40\.50 191\.69 0\.00 191\.69 Provincial Government 167\.79 105\.21 273\.00 345\.93 58\.35 400\.28 Total 208\.29 215\.21 423\.50 533\.62 168\.35 701\.97 TABLE 9: ECONOMIC COSTS AND BENEFITS Costs La Benefits Lb NPV k ERR (%) Jinan-Qingdao Highway The ICR 4,229\.90 411\.70 2,689\.80 19\.1 The SAR 2,520\.00 397\.80 4,771\.20 23\.00 La December 1997 prices\. See table 2A of Annex 1\. & First-year benefits (December 1997 prices)\. See Table 5 of Annex 1\. LI Discount rate = 12 percent\. - 25 - TABLE 10: STATUS OF LEGAL COVENANTS Cove- Original Revised Agree- nant Present fulfillment fulfillment ment Section type Status date date Description of covenant Comments Credit 2\.02(b) I C Open Special Account and operate it according to Schedule 4 of the Development Credit Agreement 3\.01(a) 5 C Commitment to project objectives and meeting obligations by Beneficiary under the Project Agreement 3\.01(b) 3 C Satisfactory onlending arrangement to Beneficiary 3\.02 5 C Compliance with Schedule 3 of the Development Credit Agreement 3\.03 5 C Meeting requirement of General Conditions, Section 9\.03-9\.08 4\.01 I C Maintaining adequate financial recording and auditing reporting requirements Project 2\.01 5 C Commitment to project objectives and meeting obligations by Beneficiary under the Project Agreement 2\.02 5 C Compliance with Schedule 3 of the Development Credit Agreement 2\.03 5 C Meeting requirement of General Conditions, Section 9\.03-9\.08 2\.04(a) 9 C Exchange of views with the Bank Group 2\.04(b) 9 C Information on interference with project implementation 2\.05 12 C Carry out Resettlement Plan 2\.06 9 CP Toll charges not to exceed 30% of vehicle operating cost savings Covenant Class: Status: I = Accounts/audits 8 = Indigenous people C = covenant complied with 2 = Financial performance/revenue 9 = Monitoring, review, and reporting CD = complied with after delay generation from beneficiaries 10 = Project implementation not CP = complied with partially 3 = Flow and utilization of project covered by categories 1-9 funds 11 = Sectoral or cross-sectoral 4 = Counterpart funding budgetary or other resources 5 = Management aspects of the allocation project or executing agency 12 = Sectoral or cross-sectoral policy/ 6 = Environmental covenants regulatory/institutional action 7 = Involuntary resettlement 13 = Other - 26 - TABLE 11: COMPLIANCE WITH OPERATIONAL MANUAL STATEMENTS There was no significant lack of compliance with an applicable Bank Group Operational Manual Statement (OD or OP/BP) TABLE 12: BANK GROUP RESOURCES: STAFF INPUTS Planned Actual Stage of project cycle Weeks $ Weeks $ Preparation to Preappraisal NA NA 62\.2 169\.5 Appraisal NA NA 44\.8 109\.9 Negotiations to Board NA NA 5\.8 16\.4 Supervision NA NA 64\.5 187\.4 Completion NA NA 7\.0 15\.8 Total 184\.3 499\.0 \.a As of November 25, 1997\. TABLE 13: BANK GROUP RESOURCES: MISSIONS Performance rating Specialized staff Imple- Devel- Stage of project cycle Month/ Number of Days skills represented mentation opment Type of year persons in field La status L objectives problems La Identification 2/22/87 6 6 E, 00, Sp, OA Identification 7/12/87 4 5 E, 00, Sp, OA Preparation 10/12/87 3 6 E, 00, Sp Appraisal 6/19/88 3 15 E, 00, Con Board through 7/20/89 1 16 E Effectiveness 10/23/89 3 20 E, E, Sp Supervision 1 7/16/90 1 3 E 2 1 Supervision 2 3/3/91 3 5 E, 00, Con 2 1 Supervision 3 10/17/91 3 6 E, Con, 00 2 1 Supervision 4 7/25/92 2 6 E, 00 2 1 Supervision 5 4/11/93 2 6 E, OA 2 1 Supervision 6 4/7/94 2 2 E, Sp S S Supervision 7 7/15/95 1 5 E S S Supervision 8 7/14/96 3 2 E, RA, OA S S Supervision 9d 11/2/96 3 6 E, RA, OA S S Supervision 10d 4/11/97 3 6 E, RA, OA S S la 00: Operations Officer; E: Engineer; OA: Operations Analyst; Con: Consultant; FA: Financial Analyst; Sp: Transport Specialist; OS: Operations Specialist; EN: Environmentalist; CO: Counsel; DO: Disbursement Officer; RA: Research Analyst; TS: Training Specialist\. 1 I\. Highly satisfactory; 2: Satisfactory; S: Satisfactory Lg Typically the problems included: lack of operational and financial resources of the contractor; quality deficiencies and lack of consistently effective control of supervision and implementation delay issues Ld These missions served also as completion missions\. -27 - ANNEX I ANNEX 1: ECONOMIC AND FINANCIAL EVALUATION Preface 1\. The economic analysis presented in this ICR for the Jinan-Qingdao Expressway (JQE) is based on updated data on traffic, vehicle operating costs (VOCs), economic cost and road user benefits and revised assumptions regarding future traffic growth rates\. The methodology used in the economic analysis is similar to that used in the SAR and is summarized as follows: (a) capital investment and maintenance costs have been revised to reflect December 1997 prices and are included in the cost stream; (b) the benefit stream, also reflecting December 1997 prices, consists of savings in VOCs reduced traffic congestion on the existing roads, and cost savings on account of accident reduction; (c) a project life of 20 years has been assumed and the capital investment period for the Expressway was from 1989 to 1997; and (d) full benefits started to accrue on the Expressway in January 1994\. 2\. As in the SAR, the Expressway was divided into three sections for economic evaluation\. Section 1: from Qingdao to Weifang (100\.0 km); Section 2: from Weifang to Zibo (98\.0 km); and Section 3: from Zibo to Jinan (120\.3 km); 3\. In addition to the JQE, there are two main existing arterial roads, a north road and a south road, along the Jinan-Qingdao corridor\. Cost and benefit analyses were carried out separately for each section, as well as the JQE a whole\. Corridor Traffic 4\. The 1997 corridor traffic and its distribution between the two arterial roads and the JQE is presented in the following table, indicating the SAR forecast and the latest traffic census data: -28 - ANNEX I NUMBER OF MOTORIZED VEHICLES PER DAY (ADT) FOR 1997 The The The New Total Diversion North Road South Road Expressway Corridor Factor (DF) (1) (2) (3) (4)=(1+2+3) (5)=(3/4) SAR Section 1 4,600 6,835 7,541 18,976 39\.7% Section2 5,685 1,182 11,946 18,813 63\.5% Section 3 5,440 6,218 10,680 22,338 47\.9% ICR Section 1 3,911 2,838 10,763 17,512 61\.5% Section 2 3,210 1,654 10,609 15,473 68\.6% Section 3 5,718 7,850 12,317 25,885 47\.6% (ICR/SAR) Ratios Section 1 85\.0% 41\.5% 142\.7% 92\.3% Section 2 56\.5% 139\.9% 88\.8% 82\.2% Section 3 105\.1% 126\.2% 115\.3% 115\.9% Sources: Jinan-Qingdao Expressway Management Bureau and the Bank Group staff\. 5\. As shown above, the total corridor traffic for 1997 (i\.e\., the sum of traffic on the sections of the two existing arterial roads parallel to the JQE and the JQE) was either close to or higher than the SAR estimates, with the exception of Section 2\. Also, the actual diversion of traffic to the JQE was at a higher rate than forecast (Section 1) or at about the same rate (Sections 2 and 3)\. The higher Diversion Factor (DF) ratio indicates that the JQE attracted a higher proportion of the corridor traffic\. As a result, the volume of traffic in 1997 was considerably higher than the appraisal forecast on Sections 1 and 3 of the JQE but lower on Section 2\. The actual DF ratio, based on four-year operation of the Expressway, shows that the ratio was quite steady for each section as shown in the following table\. The net increase of the 1997 average traffic above SAR estimate, in terms of the weighted average of traffic on the three sections of the JQE in vehicle- kilometers per day, is about 390,000 or 12 percent\. TRAFFIC DIVERSION FACTORS TO THE EXPRESSWAY (in %) Section 1 Section 2 Section 3 1994 59\.7 65\.4 49\.7 1995 54\.3 70\.1 46\.3 1996 62\.1 69\.6 48\.2 1997 61\.5 68\.6 47\.6 Traffic Projection 6\. The projected traffic for the three sections of the expressway for the years 1997- 2015, by type of vehicle, is detailed in Table 1 of this Annex\. During 1994-97, actual -29 - ANNEX I traffic census data were used while for subsequent years the following growth rates have been assumed: (a) normal traffic, except for small cars, would increase by 7\.0 percent a year between 1997 and 2000, 6\.0 percent a year between 2000 and 2005, and 5\.0 percent a year thereafter; (b) since small cars constitute the major portion of the traffic and the traffic demand is very strong, the growth rate for small cars is estimated to be 2\.0 percent higher than for other types of vehicles, and (c) generated traffic is assumed to be 2 percent to allow for additional traffic which results from the expansion of the national trunk highway system in China in general and Shandong province in particular\. 7\. In the SAR, by comparison, the normal traffic growth rate for the new expressway was estamated at 11\.4 percent a year between 1994 and 2000; and 7\.6 percent a year thereafter\. The generated traffic growth rate was assumed to be 13\.5 percent of the normal traffic\. It was further assumed that some of the railway traffic, both passenger and freight, would divert to the JQE\. Diversion of railway traffic has been discounted in the revised projection for the ICR because: (a) Most of the railway traffic between Qingdao and Jinan is through traffic\. On the other hand, it was estimated that, in 1996 and 1997, less than 10 percent of the road traffic had origins and destinations directly between Qingdao and Jinan and vice versa\. Thus, traffic diversion from rail to road is of little significance\. (b) Highway tariffs [about 40 fen per ton-kilometer (tkm) or passenger-kilometer (pkm)] are much higher than those for rail transport (6-8 fen per tkm or pkm)\. 8\. Based on the historical data and projection of the economic development of the Province and in the influence area of the JQE, the long-term normal traffic growth rate (1994-2010) for the JQE has been estimated in the range of 5\.6 to 9\.0 percent, compared to the SAR estimate of uniform growth rate of 9\.0 percent for all three sections of the Expressway\. On this basis and the assumptions presented in the above paras\. 6-7, the ICR overall traffic forecast for the expressway is more conservative than that of the SAR\. The SAR and ICR traffic projections by sections are shown in the following table: -30 - ANNEX I TRAFFIC FORECAST COMPARISON (ADT) Section I Section2 Section3 Qingdao-Weifang Weifang-Zibo Zibo-Jinan SAR 1994 5,458 8,647 7,731 1995 6,079 9,631 8,610 1996 6,771 10,727 9,589 1997 7,541 11,946 10,680 2000 10,418 16,505 14,753 2005 13,848 21,900 19,612 2010 21,660 33,950 30,690 Average growth per year 1994-2010 9\.0% 9\.0% 9\.0% ICR 1994 6,241 8,364 10,130 1995 7,094 9,970 10,846 1996 10,461 10,357 12,008 1997 10,763 10,609 12,317 2000 13,165 13,004 15,145 2005 18,462 18,173 19,218 2010 24,759 24,285 24,320 Average growth per year 1994-2010 9\.0% 6\.9% 5\.6% Note: All figures are rounded\. Economic Costs 9\. The financial cost for the JQE was converted to economic cost (Table 2A) by applying the shadow prices shown in Table 3\. The overall effect of the revised financial cost and shadow prices is that the total economic cost of JQE is 67\.9 percent higher than the SAR estimates, both at constant December 1997 prices\. The foreign and domestic price indexes used for the economic cost determination are presented in Table 2B\. ECONOMIC COST COMPARISON (Y million) SAR ICR ICRISAR (in%) 1989 prices 1997 prices Current prices 1997 prices 1997 prices Total Costs 1,743\.4 2,520\.0 2,850\.4 4,229\.9 167\.9 Economic Benefits 10\. The economic analysis includes the benefits derived from: (a) VOC savings, (b) passenger time savings, (c) relieved congestion on the two parallel arterial roads; (d) -31- ANNEX I accident cost saving, and (e) construction cost savings (Table 5)\. The updated VOC per km for the various types of vehicles used in the ICR and the SAR are presented in Tables 4A and 4B respectively\. 11\. The actual traffic census data for 1994-97 shows that, on average, about 60 percent of corridor traffic diverted to the JQE\. The drop in traffic level on the two existing arterial roads reduces traffic congestion on these roads\. The benefits resulting from the lower level of congestion were quantified on the basis of the' parameters shown in Table 4C\. 12\. The value of passenger time savings was estimated as Y 1\.0 per passenger-hour\. This level of cost saving is an overall average of the economic value of travel time for passengers in cars, vans and buses for Chinese highway projects, based on a recent study\.' 13\. Accident cost savings were calculated according to the following formula:2 B =C * (Ro -Rw )* V Where: B = annual benefit from accident savings; C = cost per accident; R = accident rate (per 100 million vkm) without (Ro) and with (Rw) the project; and V = annual vkm of travel (in 100 million vkm)\. The constants used in the above formula for "R' (for different classes of roads and the value of direct property damage) and "C" (for the various classes of roads in China) are as follows: R (100 million vkm) C (Y/accident) Expressway - 40 + 0\.005 ADT 15,000 Class I road 37 + 0\.003 ADT 10,000 Class 11 road 133 + 0\.007 ADT 6,500 Class IlI road 140 + 0\.03 ADT 4,500 14\. The condition of the two parallel arterial roads will need to be upgraded when the traffic reaches about 12,000 ADT\. With the diversion of traffic to the JQE, there will be a delayed need for such upgrading\. The upgrading/periodic maintenance cost of the parallel arterial roads is estimated to be Y 5\.0 million per kilometer in 1997 prices\. Rust PPK\. Australia Feasibility Study Methodology report (March 1996) page 5, Annex G\.5 2 From the above study report, page E-1 9, Appendix E\. - 32 - ANNEX I Economic Evaluation 15\. The economic rate of return (ERR) on the JQE investment is estimated to be 19\.1 percent versus the SAR estimate of 23\.0 percent\. Although the recalculated ERR is lower than that presented in the SAR, the high investment cost has been offset by the higher- than-estimated benefits generated by a greater volume of traffic than estimated at appraisal\. Total costs and benefits streams, ERR and Net Present Value (NPV) for JQE are presented in Table 5\. SAR ICR Best estimate of ERR 23\.0% 19\.1% NPV (12%, Y million) 4,771\.2/a 2,689\.8 /a NPV was Y 2,182\.7 million at 1989 prices and updated to 1997 prices by multiplying with a factor of 2\.1859\. 16\. Besides the normal traffic growth scenario, two traffic growth alternatives have also been considered: e\.g\., a lower traffic growth projection (30 percent lower than the normal traffic growth) and a higher traffic growth projection (30 percent higher than the normal traffic growth)\. The traffic growth and annual average growth rates under these two scenarios are as follows: THE EXPRESSWAY TRAFFIC FORECAST SCENARIOS (ADT) Section I Section 2 Section 3 Qingdao-Weifang Weifang-Zibo Zibo-Jinan The Low Projection: 1994 6,241 8,364 10,130 2000 12,097 11,950 13,918 2005 14,716 14,485 15,967 2010 17,098 16,770 17,936 Average growth per year 1994-2010 6\.5% 4\.4% 3\.6% The High Projection 1994 6,241 8,364 10,130 2000 14,291 14,123 16,442 2005 23,013 22,664 23,052 2010 35,476 34,818 32,854 Average growth per year 1994-2010 11\.5% 9\.3% 7\.6% Note: All figures are rounded\. 17\. The overall ERR and NPV for the different traffic growth scenarios are summarized in the following table\. It shows that even with the lower traffic projection, 33 - ANNEX 1 which is most unlikely to happen, the JQE investment still would yield an ERR of 16\.8 percent\. The low traffic growth scenario The high traffic growth scenario Best estimate of ERR 16\.8% 21\.5% NPV (12%, Y million) 1,544\.9 4,359\.5 Sensitivity Analysis 18\. The ERRs summarized below show the effects of possible changes in the assumptions made in the evaluation and could alter the yields on the investment\. Since the cost of operation and maintenance of the JQE is a relatively small portion of the investment cost, any variation in these costs would have no discernible impact on the ERR\. The impact of changes in the traffic levels is covered in paras\. 16 and 17\. The ERR of 16\.8 percent is still an acceptable yield in case the traffic level is 30 percent below the most probable level assumed\. The effects of 50 percent reduction in benefits attributable to lower operating cost savings, 50 percent reduction in benefits due to less- than-estimated saving in travel time cost savings, 50 percent reduction in benefits on account of cost savings due to reduced congestion, and a 20 percent reduction in total benefits are also shown Table 5\. In all cases listed, the ERR still remains at least 14 percent, exceeding 12 percent, a percentage normally regarded to be the minimum for highway investment in China\. SENSITIVITY ANALYSIS ERR (in %) NPV(12%, Y million) VOC savings reduced by 50% 14\.1 676\.0 Passenger time savings reduced by 50% 18\.3 2,394\.3 Congestion savings reduced by 50% 18\.4 2,352\.0 Total benefits reduced by 20% 16\.0 1,401\.3 Financial Evaluation 19\. The toll revenue is the only major financial income from the operation of the JQE\. The toll charges have been changed once (in July 1995) since the Expressway was opened to traffic in December 1993\. The actual total revenue increased by an average of 38\.3 percent a year during the first three years of operation (1994-96)\. The estimated financial rate of return (FRR) against the full costs of the JQE is 8\.8 percent\. This estimate indicates that the revenue from the JQE is expected to cover fully the operation and maintenance costs of the JQE and also meet all financial obligations such as loan/ credit servicing and repayments\. The details of the financial analysis are shown Table 6, and the results are summarized in the following table: -34 - ANNEX 1 FINANCIAL ANALYSIS RESULTS Input Data: Total cost Y 3,063\.65 million Total debt Y 523\.44 million Total equity Y 2,540\.21 million Period of loan 20 years Grace period 5 years Loan interest rate (onlending rate) 5\.3% Results Rate of return on equity 10\.1% Financial rates of return: Best estimate 8\.8% Toll revenue (-10%) 7\.2% Operating costs (+10%) 8\.4% Toll revenue (-10%) and operating costs (+ 10%) 6\.8% Level of Toll Charges 20\. The expressway operates as a closed toll system with 21 toll stations\. The tolls are determined by the type of vehicle and distance traveled\. There are five groups of vehicles: (a) passenger cars and small trucks; (b) medium buses and trucks; (c) large buses and trucks; (d) tractor and trailer; and (e) extra-large vehicles\. The longer the distance traveled, the lower is the toll per kilometer (Y/vkm), as listed below: Distance Small Vehicles Medium Vehicles Large Vehicles Tractor Trailer Extra-large vehicles Under 100 km 0\.32 0\.40 0\.48 0\.72 1\.12 100-200 km 0\.29 0\.39 0\.45 0\.69 1\.09 Over 200 km 0\.24 0\.32 0\.40 0\.64 1\.04 21\. According to Clause 2\.06 of the Project Agreement, the toll rates charged should not exceed 30 percent of the total VOC savings\. In the absence of a comprehensive traffic origin and destination survey and VOC savings calculation for various trips involved, an approximating analysis has been used to highlight the present relationship between the prevailing toll rates and the financial VOC savings on the three sections of the Expressway for which economic evaluations have been carried out, and the economic and financial VOCs have been available, as of 1997\. On the basis of the prevailing toll rates and VOC savings shown in Table 7, the following tentative conclusions may be drawn: (a) The JQE toll charges for large-size vehicles are reasonable and are slightly high (compared to VOC savings) for medium-size vehicles, tractor and trailers\. The charge is quite high on small-size vehicles (small passenger cars, vans, minibuses and small trucks)\. The high toll charge on small vehicles may reflect the high traffic demand by this type of vehicle, and the greater propensity to pay by the - 35 - ANNEX 1 operators/owners of these vehicles\. In 1997 small passenger cars constituted about 35-50 percent of the total Expressway traffic\. (b) On the section where the travel distance on the Expressway is significantly shorter than on the parallel arterial roads, the driver may prefer to use the Expressway\. In such a case, as on Section 1, the toll level has less effect on the decision to use the Expressway\. This could indicate that toll rates higher than 30 percent of VOC savings are not necessarily a deterrent to road users, if it results from substantial distance and time savings\. Toll rates are high on Sections 2 and 3 because the savings in travel distance, compared to the distance of travel on the parallel arterial roads, are relatively small\. TABLE 1A: JINAN-QINGDAo HIGHWAY CORRIDOR TRAFuFnc SummARY (Qingdao-Weifang Section, AADT) Nok So\.,1 X3\. Mo SO"l Sot% No\.13\. load\. Nra Nartl\. Sw\.* SC\. North 50\.1)1 North33ai sooth' Ido Mtod good Yo\.,LoI lbS Koa %*3o"l !4*4 Kt !a3s od a~ s ~a4 Ifliriloot Mfi- l ls ood !o*d 06t*\.oo o 33* 7\.0 3S\.1 3 4 F F F II 311 E\.Prmu Fair fair Good 31-10 I"- 80-330 1* to t 23\.0 3\.114 311% 3,0% 0P\.od3 (?o40d3 IFo"d3 --\.--4\.11 Car- "\.f\.-3rdor 1o\.-\. ----lArK Bad-- *\.3,oTrolk\.-- -llo\.6o\.a Trod- --Lar Trmk- --Tro\.tor\.Trollr- -- Tol*----- 30\.1)4 3i~lhokt UMM11\.A l 1\.31100 w1)130o1 witbao wth*ow W4Ilool WiIhooi old S*\. 034 'ar 01\.1 0 Nm, Old Old 'ae Old Old SC\. Omd Old Nr Old Old NM\. Old Old N, Old Old N\.* Old rood road rood rood rood road rood rood rod rood road road r08 road r ood ro rood 1*04 roa rood Ij rood rood rood rood ,Od rood road 3994 103 70 11030 3\.r34 1\.333 339 477 31)3 273 133 3 4 III 771 343 112 634 303 3Jul 193 710 39 M4 44 1333 3\.7*7 3,7*4\. 2\.473 3993 2\.71?~~~~~I 3\.393 1,374\. 737 279' *3 73 13 396 944 M3 733 7M1 4311 72 1,013 703 306 344I 337 33 6\.616 3,121 3\.403 *996 ~~~~~~~3\.621 I,1m k\.432 3*3 4011 423 226 is 2013 31)10 243 33 932 61)3 333 1,322 S"1 334 341 236 92 11\.333 4\.61)3 3,730 3997 3~~~~~~~\.71\.3 ,1)210 1,417 931) 4310 330 236 19) 3*3 3\.333 M7 473 9)1 636 I74 1,3731 920 3331 362 762 Wo) 11\."6 4,73 3\.933 73311) ~~~~~~4\.61* 2\.1134 3,14 3,30%4 493 394 377 73 33 3\.373 3*3 *073 3,3\.1 73 433 3,49 I\.3m 3337 423 314 333 *0\.463 3\.793 4,669 313) 6\.014* 4\.33\. 3,734 1,411 636 74 33 39) 341 1\.331 399) 3,72 3,363 9114 077 2,0333 1\.472 331 37 433 133 34,613 6\.124 6,491 3131 9,0\.6 5\.1)433 3\. 1, 4311 3,u 37 1\.3333 471 33 43 2,763 34\.9 3\.133 *,"3 3\.336 736 3\.'3 3\.179 6711 719 s36 393 MM33 3\.99 1,629 30*3 13\.330 \.1\.91 S3,39 O\.36 u 36 13\.293 6312 47 333 2\.1113 0\.3 2\.333 7\.312 1,6313 939 3,763 2,390 1163 931) 614 246 2G\.J33 34,6431 1\.4'34 *993 330 3413 03 t t 2\.39 1\.71)1 39 w 3,93 23 134 76 is 331 6*1 *09 497 633 3t3 731 3,03 1193 *4 *4 33 39 3,743 3,493 1,741 M99 7,0113 1,770 3,1)4 3Ito 133 22 33 Is 93 $1)3 *93 623 IV3 Its 71\.2 3\.1)3 91*1 is) 369J 233 69) 6\.43 3,973 2,477 W4 ~~~~~3\.9*7 2\.713 1\.133 743 3139 339 $17 34 *1)3 932 309 163 1\.1)4l 763 277 1,30 1,143 *60 399 326 73 0,31) 3,w11 2,6\.43 MY9 4\.3373 3\.4113 *313 77 323 336 131 is *1)3 1\.010 31 6930 1,037 33 333 1,334 1\.170 3114 433 333 so) 3\.644 6,131) 2\.833 2*041 1,473 3\.617 *166 oil 674 39 M1 29) *26 I,1m )9 9111 1,276 933 341 1\.39$ 1,399 *96 43S 399 39 30\.693 3,372 3,323 21093 3,433 S\.3\.u\. z 14 1,322l 13 37 21)1 39 369 l\.3144 31*3 3,1)0 1\.31)7 3\.331 436 2\.134 3\.073 262 633 334 139 14,977 10,331 4\.639 71013 loi5)4\. 7 )?4 3433 3\.1\. *L 46 301 766 31 3, \.3\.1)3 647 3,3317 \.3 1\.37 '97 3533 3\.73) 2,309 334 334 6*3 132 70,497 33,163 6,397 240131,\.4 333 4,333 I\.99 3\.363 633 140 64 MP1 3\.9, 36, 1\.7,17 3,731 3\.1)34 343 3\.475 3\.3349 476 3\.06\. 1170 3114 36\.9*9 13\.633 32324\. 3934 ~~~~~ ~~4393\. 3,l7¶ I 331 0*) 413 OIl 3u3 33 331 3403 33 3115 1\.327 6011 339 2,033 1\.393 441 376 99) *79 *0\.41 6\.241 4,239 P\.133 3~~~~~~,333 3*163 3,330 1,3 034 603 336 33 39 1,74 331 1\.4*3 1,343 933 394 IOw9 3\.61)7 437 3*3 33 *36 *3\.046 7,1\.9 3,973 W\.)G3 3,337 3,97 3,364 *113 'An 72 33 47 III 31\.33 sit 0,343 3,993 11\.36 630 1\.34 7,040 414 747 332 *63 363139 30,441 6,371) 1993 71 0*3 I,7\.1 1\.69 933 766 363 44 374 !2\.33 367 3\.31) 7,073 I,39 674 3,634 2,im9 334 177 397 331) 17\.112 1)1,763 6,749 31601 4,6 ,443 13\.333 \.1331 1\.04 101 437 31 3111 3\.33 6177 3\.113 7\.447 11\.63 717 I\.39 2\.439 "93 9*3 733 2333 33\.315 13,163 T\.993 Z30* 14,342 v,46A4 ,33* 3,1)7 3,\.973 3,'l13 3in 61 31) 3\.33'3 396 I\.4m )\.263 I,33 1 4,337 3,344 793 3,234 934 230 39,397 *11462 13,130 333110 311\.116 *3,334 6,442 1\.4*1) 1,993 1,51* 73t 33 601 4\.294 1\.13M 3,1330 4\.171 3,30 3,33 3,333\. 4\.613 it 1,131 \.6 1,330 343 39,330 34,739 44\.673 31*1 31,334 *4\.6*0 9),396 A-33\. 7,439I 1,933 942 M1 *3* 3,43* 3\.436 4,3)3 3,3li 3\.4* 1,613 n 67 1 3447 3,20 3,964 3,34 440k 133\.14 33\.776 39,7711 Idowr I~L a\. Rooldbsaomo0\. 4\. WA#owwbo I,,3 F\. nbI 11 Hlly, M\. m3owwiftw* I)j AN the figobotAmr,o\.ded\. TABLE iB: JINAN-QINGDAO HIGHWAY CORRIDOR TRAFFc SummARY (Weifang-Zibo Section, AADT) 66665(m)? 1 N~~~~~~~~~S\.? Lftar Gro,2\., 1ads\. In%)l 3' Road Mras RoadS Ceedlia\." Ay\.ros Spail tIkoloor) N\.b Sooth Nt\. Norok South Nra Snorh Sooth Nor North South NM\. North S\.tgh New North Soot NCs\. Repad Road IIit\.g\., Read Road Ilmihoio Rea-d Reid n!&rba\. Read Paead Ifith\.s) Road Road 111h,war Raid Raid HIilh\.or a \.0 7\.0 15\.6 2 2 a p H5 7 II III Kspr20o ftair Boar Good 3S583 25-411 00120 b \.e 9\.0 23\.6 \.% 35 \." IP&tcd) 1Pesrd) PI'srd) -SmomSCar- -Strdfivao Boo-\.-Li,\.c Boo\.-- -Smelt Truck- \.-Altldk Trok\.- \.La,,r Truck- --TatrTrl --- Toa Rlood 11iohoo Witheal Withoat Witham WitlIto Without Withaut WithouA ka\.th (k\.e) praro Wit P -r\.j-r proelm WthPaia sor_eir 'Li t15 trejrrt pro,icrt Wdub pcaro,, pRaiot Wit Prjc prtojrra 'do Pojact poject with Project project With Frojrcs old N\. Ol N Old Olm NM\. Old Old N-o'o 01\.1 Ol N\. Otd Old NM\. Old Old Na Old Old NM\. Old Old NMa Old r\.*d teed crod cred read read red ,oad cred ra\.id read reed read read coed crad read read read reaid road road reed rood roand roaid Secrja 22; 'ddfaa5- Zib\. 199 6890 9500 )\.263 2\.323 742 347 435 117 SI 31 30 1,316 215 2\.106 1\.046 644 402 1\.622 2\.527 104 503 97 406 1,449 3\.S22 2\.927 599 )\.513 2\.9310 21 669 567 102 1s0 36 44 1\.366 326 1\.2442 1\.127 1530 277 L1*59 1\.761 45 322 106 216 9\.31s 6\.353 2,13 1996 3\.934 Z\."55 936 745 633 10S 03 36 47 1\.6\.17 333 01\.4 1\.242 940 294 1\.757 1,744 43 376 147 229 9,5312 6,539 2,991 19"1 \.1A11 3,073 5\.039 740 649 III 53 27 is 1\.712 342 1,370 1\.92 972 320 1\.159 1\.3m 71 392 131 241 10,212 1\.002 3\.210 1111 $\.110 3,552 1\.235 907 333 132 020 44 31 2,011 401 1\.610 1\.321 1,161 3601 2\.119 2,136 53 461 2Ito 211 12\.310 0,356 3,732 20119 7\.323 5701 1\.119 1\.!14 1\.037 173 137 39) Is 2\.7,11 346 2\.13~3 2,036 1\.334 452 2\.929 2\.535 71 617 341 376 17,157 I 1,5949 5,135 :0111 111\.31 1\.119 2AH3 1\.5341 1\.324 22'6 273 33 14\.0 3\.447 69)7 2\.3301 2\.341 1\.903 613 3\.739 3\.641 91 316l 305 455) 22\.545 16,033 6\.313 i051% I ANI4 11\.22\. 3\.371 1\.935 1\.690 25 2214 96 11% 4\.4\.0, Aw, 3\.314 3\.316 2\.533 713 4\.772 4,636 116 1\.0416 393 623 30\.494 21,476 9,010 A\.4ct\. Ibd 9 40 - Sooth Rd 1994 5444 '11101 I 1\.65\., 1\.291 352 251 221 00 42 16 '\.1 72' 144 50,9 '39 332 241 533 751 34 219 SIt 2419 4\.349 2,542 1\.3027 1999 1\.963 2\.341 436 311 N%0 33 5 53 440\.)03 U 56 bill SW0 141\. 541 911 9645 it 666 Ss 15 \.4,913 3,317 l,IAsS 8996 2\.435 1\.943 492 III 3235 36 \.02 1 II 214 14'i 132 677 639 455 131 929 597 22 193 73 IIII 3,0311 3,511 1,3403 1991 2~~~~~~~~~1114 5\.55! 534 396 313 63 44 29 25 03 276 7017 666 3101 166 933 935 33 201 77 224 3\.2162 3,6127 2\.654 2066 2~~~~~~~~~1633 2\.'p 637 467 39$0 W 69 I 21 2' 01041 22 52', 753 395 513 1,126 lOin 27 237 92 243 6,339 4,416l 1,921 24053\.7 2 936 936 \.6Ž3 J333 92 65 29 3,1 1\.5911 2021 12119 IltIl 1wr) 245 1\.5417 1,471 36 327 223 194 5\.8120 6\.174 2,634 2010 ~~~~~~ ~~~3\.431 4\.115 0\.13 793 6X11 113 7 33 54~012\.733 3604 1\.411 1\.133 1,521 327 2\.923 1,577 46 403 137 245 11\.736 5,230 3\.306 3055 ~~~~~~ ~~~7,655 5\.7761 ,1\.42 1,027 565 249 M2 47 (4 2\.2o3 449 1\.51406 1\.71, 2\.3013 405 2,4S 2,396 39 527 200 313 13,691 11,049 4\.642 A\.C\.o Read 0a W Total Cerridar: 2994 4\.943 3\.021 1\.124 525 635 277 123 47 76 2,4rt 424 1\.675 5\.3153 976 6419 2,436 2\.295 131l 762 247 623 22,795 8\.364 4,434 199" 3\.733 4\.437 5\.345 1\.053 535 133 III 13 07 213721 493 2\.579 5\.707 1\.251 429 2\.740 3,675 62 455 162 327 14\.220 9,970 4\.230 1996 $\.g59 4\.341 2\.440 1\.122 935 164 133 54 71 2\.496 3415 1\.991 5\.558 1\.436 443 2,706 2\.642 63 369 222 347 54,1155 210\.337 4,5335 21993 6\.220 4\.633 1\.373 5\.236 952 574 229 46 13 Z\. '93 320 3\.077 2\.935 2,432 4916 2MIA 2,755 241b 593 225 36S 153473 523\.642 4\.964 lOU 7,33 3,550 1\.573 1,37 1,173 205 133 A 7 3\.031 629 2,439 2\.V41 1\.739 343 3\.323 3\.33 5to 695 272 426 25,637 13\.004 3\.633 2095 22~~~~~~~~1\.33) 5\.640 2\.735 1\.239 5\.330 269 203 05 223 4\.002 525 3\.264 3\.554 2\.354 730 4\.436 4\.329 507 934 364 370 23\.955 1\.1\.73 7\.122 loll 13\.952 52\.125 3\.564,4 2\.347 2\.112 343 362 112 236 3\.22 2\.037 4\.156 3\.936 34204u 932 3\.662 3\.323 237 1\.193 465 725 34,6104 24\.253 15\.329 2625 ~~~~~~~~~22\.426 56\.996 3\.4241 2\.993 2\.355 Ai7 333 243 192 6\.663 5\.349 3\.3516 3\.024 3\.534 2,2190 7,337 7\.052 273 1\.323 393 930 46\.25:3 32\.325 13\.660 Nola5 IIS1 a Rood paIraw",t S INVAIDN' todhd \.2 P F05\.1 of 52\.22\. M1 U5\.aeeior"\. J AU d\. filtata \. we mmid\.d TABLE 1C: JINAN-QINGDAO HIGHWAY CORRIDOR TRAFFIC SUMMARY (Zibo-Jinan, AADT) Width (M) /_1 No\. of Laoa Gradinot (( it\. in%) /2 Rood a oos Road Condition Averoje Speed (ho/bor) Nenh Sooth New North Sooth NMw North South Nrv, Noth South New North Sooth New North South New Rood Rood lligh\. Rood Rood Iliohooc Rood Rood flighoo Road Road lfifh\.oc Road Rood llthwov Rood Road llihhwv 0 7\.0 7\.0 I9\.0 2 2 4 P It P 11 III E\.preot\. Foir Poor Good 3S-S01 2-433 Ith-12t b 9\.0 9\.0 26\.0 13\.0% t\.0% 3\.1% (tPed) (P8vod) (PsAed) --\.-\.Stooll Cor\.---\.- \.--\.-Alvdiord,--th iu OI or-- \. Loc Boo--\.--- -----Smolt lrot/--- _\. \.r-tidio, lr-ck-o - ------- _-Troct\.8Tr7iler--- -\.uTo f-- \. _ _ Road Without Wilhoul Withat Without Wilhol Wilhout Wihoul Without knylhl (n) I-rjet With Project project With Project Project With Prject \.I-cct With Project pr'ject With Project ptrojct With Project Irojet With project projCct With Pojec Old New (ltd NCo Old Old Ne\. Old Old N Ol (ld (11 NPo Old Old New Old Old New Old Old New Old Ohl New Old rood reod ro\.d rood road road rood road rood rood rood rood \.od road rood rood road rood road rood rood rood rood rood rood rood SCctioo I3: Zibho Jin\.o Nonh Rood: 1994 129\.10 12030 3,720 2\.9 1,634 670 350 290 148 23 123 1\.260 233 11)27 1,168 570 390 1,52) 1,120 41 361 02 4) 9\.064 4,302 4,362 195 3\.934 2\.139 1\.793 724 302 342 174 20 146 1316 231 1\.27S I40' 573 836 1,93S 1\.304 534 719 76 643 101414 4,820 W\.594 199f 4\.431 3\.065 1,393 700 417 363 171 23 153 1\.635 210 1\.353 1,512 626 YY6 1,726 1,139 5Y7 771 t9 612 1 1,060 5,639 5,421 1997 4,636 3,142 1\.494 *12 420 304 IIS 25 161 1,7W0 287 1,413 1,372 642 930 1,796 1\.16t 620 t01 92 709 11\.302 5,714 3\.711 2110 35,773 3,969 1,104 956 5)1 445 21S 28 IX0 2111)3 343 1,660 1,152 761 105S 2\.114 1,395 719 945 109 133 13\.161 7\.123 6,731 1 20tl5 1,J43 3\.532 2,651 1\.279 604 395 292 33 234 2,600 439 2,221 2,479 1\.126 1\.453 2,t30 1,067 962 1\.264 146 1,11 1911K3 t 10,12 9,234 t, 2010 11,919 t\.,\U 3,711 1,632 172 760 3712 4 324 3,421 S/3i 2,735 3,164 1,310 1,Y54 3,611 2,303 1,2l1 1,613 It6 1\.427 25,711 13,566 12,146 00 2015 16,647 11\.473 3\.214 2\.0Y3 1\.114 969 475 61 414 4,366 740 3\.61, 4,038 1,672 2,366 4,60') 3,042 1,56Y 2,059 230 1,21 34,317 1,346 15,971 1 Aces Road a Oa South Rood; 39 I14J00 120830 4,660 2,611 2,142 138 475 363 104 20 156 1,573 291 1,204 1,439 712 747 1,912 1,4111 S11 7112 103 509 11,330 5G,62 5,702 1995 4,919 2,673 2\.244 9W4 477 427 219 36 13 I\.1YS 297 1,591 1,761 716 1,1145 2,423 1,7311 693 ISO 93 X04 13,0211 6,026 6,994 199G 5,573 31149 2,424 973 322 453 223 29 194 2\.044 350 1,694 1,891 7J3 1,103 2,160 3,425 735 963 III 032 133\.29 6,369 7,460 1997 35796 3\.227 2,536 1\.,14 535 479 232 34 192 2\.126 3Go 1,766 1,967 003 1164 2,246 1,460 706 1,0112 114 HIS 14,383 6,333 7\.8511 20I0 7,217 4,078 3,139 1,194 639 S55 273 36 238 2\.50W 429 2,075 2,317 93' 1,357 2,646 1746 900 1,10 136 1,044 17,331 111023 9,300 2005 3,516 4,742 3,775 1,353 716 641 310 46 263 2,045 402 2,363 2,632 1,9175 3\.550 30tK16 1,934 1,032 1,341 133 1\.18Y 20,0011 9,166 10\.Y42 20R0 101123 5\.7210 4403 1,524 *16 700 349 45 303 3,196 547 2,649 21957 1,224 1,732 3,377 2,220 1,149 1,506 174 1\.332 231131 10,754 12\.277 2013 - 11,9J4 6,650 5i29' 1,732 91 si 396 35 331 3\.631 615 3,016 3,360 1,371 I\.9J0 3,036 2J494 J\.343 1\.711 195 1\.317 26,611 12,297 14\.314 Acets Road 0 I10 Total Corridor; IS9J0 *3tY 4,712 3\.676 1,01 *355 653 332 31 211 2t\.35 324 2,311 2,627 1,212 1\.345 3,441 2,521 920 1,263 1Y 1,0171 20,394 10,130 10,264 IW5 Y,S33 4\.J14 4,039 1,621 059 769 393 G4 329 3\.411 535 2\.876 3,170 1,2Y9 1IYY1 4,361 3,114 1,247 1,61 171 1,447 23\.434 189,46 12,581 1996 10\.1t31 1\.214 3\.17 1,75i 939 *IG 401 52 349 3\.679 630 3,049 3,403 1,41) I ,;94 3,806 2,564 1,322 1,734 200 1,534 24,119 123,014 12\.10S I"97 10\.432 6,569 4,1163 1,126 963 I03 417 59 350 3,26 647 3,179 3,539 1,445 2,19)4 4,042 2,620 1,414 1,803 206 1,597 25,005 12,317 13\.56 210t1 Il,W9U *,J47 4,943 lIS0 1, 1,1 1,000m 491 64 426 4,S07 772 3,73S 4,169 1,726 2,443 4,761 3,141 16t10 2,124 249 t,179 31\.192 11,145 t6\.j47 210111 699 10H\.l574 6,425 2,636 1,4110 13,36 602 *3 519 5,521 941 4,5t3 5,111 2,101 3,010 5,035 3,Y21 2,014 2,603 27YY 2,306 39,314 19,21Y 20\.I11% 2dl0 22,uU02 13,1uo 0,IU 3,136 1,609 1,460 721 93 620 6617 1\.133 3,404 6,121) 2,534 3,506 6,919 4,611 2,377 3,119 3611 2\.739 41,742 24,320 24,422 201u 23\.6531 IY\.127 10,5U1 3,115 2,027 1,737 372 120 732 7,997 1,363 6,63S 7,397 3,043 4,354 Y,445 5,333 2,910 3,770 432 3,331 60,927 30,643 30,2t4 Nors /-I: a: Iotdpr eoleota bh Wihdroodhcd L2: F\. FbI; II: illy; hM Mountainous; 03: Alldteflyo,scagorounded\. - 39 - ANNEX 1 TABLE 2A: ECONOMIC COST SUMMARY (Yuan million) 1989 1990 1991 1992 1993 1994 1995 1996 1997 Total A\. Financial (current): Qindao-Weifang 18\.05 90\.26 90\.26 180\.54 270\.80 90\.26 45\.13 45\.13 72\.21 902\.64 Weifang-Zibo t8\.87 94\.36 94\.36 188\.73 283\.09 94\.36 47\.18 47\.18 75\.49 943\.62 Zibo-Jinan 24\.35 121\.74 121\.74 243\.48 365\.21 121\.74 610\.87 60\.87 97\.39 1217\.39 Total 61\.27 306\.36 306\.36 612\.75 919\.10 306\.36 153\.18 153\.18 245\.09 3063\.65 B\. Economic (December 1997 constant): Qindao-Weifang 34\.71 154\.13 146\.35 276\.18 370\.27 103\.59 45\.50 45\.06 69\.05 1244\.84 Weifang-Zibo 36\.42 161\.71 153\.53 289\.69 381\.10 108\.48 47\.64 47\.15 72\.19 1304\.91 Zibo-Jinan 46\.86 20S\.08 197\.57 372\.80 499\.70 139\.77 61\.40 60\.79 93\.14 1680\.11 Total 117\.99 523\.92 497\.45 938\.67 1258\.07 351\.84 154\.54 153\.00 234\.38 4229\.86 For Economic Evaluation (Yuan million) For Financial Evaluation (Yuan million) Works: Economic Cost: Jinmn- Qingdao highway 1\.975\.94 Co\.t as for economic evaluation 2\.350,39 Consultant services for supervision 40\.50 Road maintenance equipment 51\.13 Additional investment itenax: Road laboratory 4\.07 Equipment for road strengthening program 1\.45 Traffic monitoring 125_t4 Road daita bank 4\.32 T'echnical assistance 0\.B3 Staff training 7\.64 Facilities along the route 203\.50 Loan/ credit servicing atiul tax t99\.81 Subtotal 2,401\.31 Subtotal 213\.26 Adidlitional invesment items: Total 3\.063\.65 LIanl actluisition andl resettiement 262\.00 Design and survey 30\.92 Rcsearch and testing 4\.55 Overhead 52\.0- Foreign exchange lo\.s 99\.26 Subtotal 449\.08 Total 2,550\.39 TABLE 2B: PRICE INDEX FOR CALCULATION OF ECONOMIC COST (in %) 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 Foreign prices 7\.30 -0\.70 5\.70 2\.10 4\.30 -0\.30 3\.60 8\.20 -4\.40 -5\.50 Domestic prices 12\.50 8\.90 6\.30 5\.70 6\.20 13\.60 21\.70 14\.80 6\.50 2\.00 TABLE 3: SHADOW PRICE CALCULATION (December 1997 prices, Million Yuan) Qindsu-eei'ant Wcifang-Zibu Zibo-Iinan Gonver Total -sion Financial Financial Financial factor Local Foreign Total Economic local Foreign l'otal Economic Local Foreign Total Economic Financial Economic Land I 00 70 22 000 70 22 70 22 68 82 0\.00 68 82 68\.82 84\.26 0\.00 84\.26 84\.26 223\.30 223\.30 I\.abor: t'nskIilled I 0O 4101 000 4101 41\.01 1326 000 4326 4326 55\.44 0\.00 55\.44 55\.44 139\.71 139\.71 Semili sIdlledfl'echinician 1 50 33 55 0\.00 33 55 50\.33 35\.40 0\.00 35\.40 53\.10 45,36 0\.00 45\.36 68\.04 114\.31 171\.47 Superisor 300 939 6\.28 15\.67 3445 991 628 16\.19 36\.01 12\.70 8\.38 21\.08 46\.48 52\.94 116\.94 Mactrials: Steel I00 62\.63 0\.00 62\.63 62\.63 6607 0\.00 6607 66\.07 84\.67 0\.00 84\.67 84\.67 213\.37 21337 l'imber 100 21\.85 0\.00 21\.85 21\.85 23\.05 0\.00 23\.05 23\.05 29\.53 0\.00 29\.53 29\.53 74\.43 74\.43 Cement 1\.00 25\.57 0\.00 25\.57 25\.57 26\.98 0\.00 26\.98 26\.98 34\.57 0\.00 34\.57 34\.57 87\.12 87\.12 Sand 0\.80 52\.19 0\.00 52\.19 41\.75 55\.06 0\.00 55\.06 44\.05 70\.56 0\.00 70\.56 56\.45 177\.81 142\.25 Stone 0\.80 47\.57 0\.00 47\.57 3806 50\.19 000 50\.19 40\.15 64\.31 0\.00 64\.31 51\.45 162\.07 129\.66 Bitumen 1\.00 42\.13 50\.25 92\.38 92\.38 44\.44 50\.25 94\.69 94\.69 56\.95 67\.00 123\.95 123\.95 311\.02 311\.02 Others I\.0 21\.40 0\.00 21\.40 21\.40 22\.58 0\.00 22\.58 22\.58 28\.93 0\.00 28\.93 28\.93 72\.91 72\.91 Fuel: Diesel 1\.00 11\.33 000 11 33 11\.33 11\.96 0\.00 11\.96 11\.96 15\.32 0\.00 15\.32 15\.32 38\.61 38\.61 Gasoline 1\.00 14\.99 0\.00 14\.99 14\.99 15\.81 000 15\.81 15\.81 20\.26 0\.00 20\.26 20\.26 51\.06 51\.06 lIeasy oil l\.W 0\.07 0\.00 0\.07 0\.07 008 0\.00 0\.08 0\.08 0\.10 0\.00 0\.10 0\.10 0\.25 0\.25 Others L\.00 5 00 0\.00 5\.00 5\.00 5\.27 0\.00 5\.27 5\.27 6\.75 0\.D0 6\.75 6\.75 17\.02 17\.02 Water 080 38Si 000 3\.88 3\.10 409 0\.00 4\.09 3\.27 5\.24 0\.00 5\.24 4\.19 13\.21 10\.56 EIletricit) 200 5 96 000 596 11\.92 629 0\.00 6\.29 12\.58 8\.06 0\.00 8\.06 16\.12 20\.31 40\.62 Mobilization I 0Do 2 39 000 2\.39 2 39 2 52 0\.00 2\.52 2\.52 3\.23 0\.00 3\.23 3\.23 8\.14 8\.14 M1echanlical equipment I 00 8127 100 49 181 76 181\.76 85 74 100 49 186\.23 186\.23 109\.87 134\.01 243\.88 243\.88 611\.87 611\.87 Otheri I 00 193 22 0 00 193\.22 193 22 20'9\.08 0\.00 209\.08 209\.08 271\.89 0\.00 271\.89 271\.89 674\.19 674\.19 'rotal 745\.6 157\.02 902\.64 923\.43 786\.60 157\.02 943\.62 965\.56 1008\.00 209\.39 1217\.39 1245\.51 3063\.65 3134\.50 O%erall conwersion factor 1\.02 1\.02 1\.02 1\.02 /_I: All the figure are rounded\. /_2: Shadmu echaunge rage 1\.01\. -41- ANNEX 1 TABLE 4A: ECONOMIC VEHICLE OPRATTNG COSTS (Yuan per km, December 1997 prices) Good F air Poor Flat Roll llill Mount\. Flat Roll flill Mlount\. Flat Roll llill Mount\. North Road: Small car 0\.598 0\.624 0\.644 0\.673 0\.700 0\.719 0\.871 0\.898 0\.917 Small bus 0\.805 0\.955 1\.077 0\.893 1\.037 1\.156 1\.141 1\.273 1\.391 Medium bus 0\.912 1\.099 1\.259 1\.027 1\.218 1\.375 1\.274 1\.455 1\.611 Large bus 1\.019 1\.242 1\.441 1\.162 1\.399 1\.594 1\.408 1\.636 1\.831 Small truck 0\.874 1\.092 1\.257 0\.969 1\.184 1\.345 1\.184 1\.373 1\.562 Medium truck 0\.954 1\.175 1\.396 1\.059 1\.302 1\.522 1\.279 1\.522 1\.765 Large truck 1\.188 1\.457 1\.725 1\.353 1\.643 1\.900 1\.610 1\.900 2\.175 Tractor/trailer 2\.243 2\.958 3\.577 2\.591 3\.372 4\.030 3\.084 3\.825 4\.503 South Road: Small car 0\.598 0\.624 0\.644 0\.722 0\.751 0\.771 0\.934 0\.963 0\.983 Small bus 0\.805 0\.955 1\.077 0\.935 1\.087 1\.212 1\.196 1\.334 1\.459 Medium bus 0\.912 1\.099 1\.259 1\.068 1\.267 1\.431 1\.326 1\.513 1\.676 Large bus 1\.019 1\.242 1\.441 1\.202 1\.447 1\.649 1\.456 1\.692 1\.894 Small truck 0\.874 1\.092 1\.257 1\.014 1\.239 1\.408 1\.239 1\.437 1\.635 Mledium truck 0\.954 1\.175 1\.396 1\.102 1\.355 1\.584 1\.331 1\.584 1\.837 Large truck 1\.188 1\.457 1\.725 1\.387 1\.685 1\.948 1\.650 1\.948 2\.230 Tractor/trailer 2\.243 2\.958 3\.577 2\.655 3\.456 4\.130 3\.161 3\.920 4\.614 Notc: /_I: Excluding the value of passcnger timc\. TABLE 4B: THE SAR'S ECONOMIC VEHICLE OPERATING COSTS (Yuan per km) Good t Fair --Poor Flat Roll llill NMounL Flat Roll Hlill Nlount\. Flat Roll lHill Miount\. Mid-1988 prices: Small car 0\.273 0\.295 0\.350 0\.341 0\.369 0\.437 0\.385 0\.416 0\.492 Small bus 0\.435 0\.479 0\.608 0\.543 0\.599 0\.760 0\.679 0\.710 0\.891 Large bus 1\.145 1\.366 1\.653 1\.432 1\.7\.08 2\.066 1\.558 1\.859 2\.352 Small truck 0\.273 0\.295 0\.379 0\.341 0\.369 0\.474 0\.382 0\.412 0\.519 Mledium truck 0\.380 0\.441 0\.535 0\.475 0\.551 0\.669 0\.527 0\.612 0\.728 Large truck 0\.548 0\.604 0\.733 0\.648 0\.755 0\.916 0\.709 0\.826 0\.994 Iractor/trailer 1\.079 1\.306 1\.570 1\.348 1\.633 1\.963 1\.458 1\.765 2\.107 Decembcr-1997 prices: Small car 0\.597 0\.645 0\.765 0\.745 0\.807 0\.955 0\.842 0\.909 1\.075 Small bus 0\.951 1\.047 1\.329 1\.187 1\.309 1\.661 1\.484 1\.552 1\.948 Large bus 2\.503 2\.986 3\.613 3\.130 3\.734 4\.516 3\.406 4\.064 5\.141 Small truck 0\.597 0\.645 0\.828 0\.745 0\.807 1\.036 0\.835 0\.901 1\.134 Mledium truck 0\.831 0\.964 1\.169 1\.038 1\.204 1\.462 1,152 1\.338 1\.591 Large truck 1\.198 1\.320 1\.602 1\.416 1\.650 2\.002 1\.550 1\.806 2\.173 'Ilractor/trailer 2\.359 2\.855 3\.432 2\.947 3\.570 4\.291 3\.187 3\.858 4\.606 -42 - ANNEX 1 TABLE 4C: SPEED, CONGESTION AND HIGHWAY CAPACITY (By highway class) 80\.0 70\.0 60\.0 -*_- +Seriesl IF 50\.0 --- Series2 40\.0 \. Series3, 30\.0 - X Series4 -E 2Sernes5 10\.0 0\.0 \. t 2 3 4 5 6 7 8 9 10 11 Express- Maximum way Class I Class If Class Ill Class IV Free-flow (Series I) (Series 2) (Series 3) (Series 4) (Series 5) Capacity Congestion (V/C) Speed (km/hour) Jinan-Qingdao Highway Corridor (MTE/dav): 1\. Qingdao- Weitang section 0\.0 79\.0 66\.0 52\.0 38\.0 34\.0 North (2 lanes, F, ll) 15\.600 0\.1 78\.0 65\.0 51\.0 37\.0 33\.0 South (2 lanes, F, 1I1) 9,200 0\.2 77\.0 64\.0 50\.0 36\.0 32\.0 Expressway (4 lanes, F, Exp\.) 44,000 0\.3 76\.0 63\.0 49\.0 35\.0 31\.0 0\.4 75\.0 62\.0 48\.0 34\.0 30\.0 11\. Weifang- Zibo section 0\.5 74\.0 60\.0 46\.0 33\.0 29\.0 North (2 lanes, F, 11) 15,600 0\.6 73\.0 57\.0 44\.0 32\.0 28\.0 South (2 lanes, Fl, 111) 7,800 0\.7 72\.0 53\.0 42\.0 31\.0 27\.0 Expressway (4 lanes, F, Exp\.) 44,000 0\.8 70\.0 48\.0 39\.0 28\.0 24\.0 0\.9 65\.0 42\.0 35\.0 25\.0 21\.0 Ill\. Zibo- Jinan section 1\.0 55\.0 35\.0 30\.0 20\.0 16\.0 North (2 lanes, F, 11) 15\.600 South (2 lanes, H, 111) 7,800 Gradients Maximum Free-flow Capacity (MTE/dayllane) Expressway (4 lanes\. F\. Exp\.) 44,000 rFR 11,000 9,600 7,800 4,600 1,600 H/M 10,000 7,100 6,400 3,900 1,500 F - Flat\. R - Rolling\. St - Hilly\. NM - Mountainous Sourcc: Rust PPK Feasibility Study Methodology, March 1996, p\.38\. TABLE 5: ECONOMIC EVALUATION QINGDAO-JINAN HIGHWAY PROJECT (Y Million, December 1997 Prices) Basc Case Sensitivity Analysis Case I Case 2 Case 3 Case4 Benefits \.--\.''' '''''' Costs Constr\. VOC Passeng\. Conges Capital Road VOC Passelig\. Conges Cost Net Net Time -tion Total Constru Nfaint\. & Net Timie Generated -tion Savings Reduced Cash Savings Savings Savings Benefits Year -ction Operation Total Savings Sasings Tiallic Savings 1_2 Accidents Total Flow (\.50%) (-50%) (-50%) (-20%) 1989 11799 117\.99 (117\.99) (117\.99) (117\.99) (117\.99) (117\.99) 1990 523\.92 523 92 (523\.92) (523\.92) (523\.92) (523\.92) (523\.92) 1991 497 45 497\.45 (497\.45) (497\.45) (497\.45) (497\.45) (497\.45) 1992 938 67 93867 (938\.7) (938\.67) (93867) (938\.67) (938\.7) I993 1258\.07 1\.25807 (1,258\.1) (1,258\.07) (1\.258\.07) (1,238\.07) (1,258\.1) 1994 351U84 19919 55103 270\.70 8006 7\.01 33\.78 0\.00 20\.10 411\.65 (139\.38) (274\.73) (179\.41) (156\.27) (221\.71) 1995 154\.34 283\.79 438\.33 308\.22 84\.02 7\.85 41\.60 171\.00 23\.90 636\.59 198\.26 44\.15 136\.25 177\.46 70\.94 1996 15300 274\.35 427\.35 378\.33 10274 9\.63 49\.18 228\.00 29\.19 797\.07 369\.72 180\.56 318\.35 345\.13 210\.31 1997 23438 27140 505\.78 430\.90 11602 10\.94 56\.54 171\.00 30\.60 816\.00 310\.22 94\.77 252\.21 281\.95 147\.02 1 1998 271\.03 271\.03 504\.45 122\.91 12\.54 65\.66 391\.65 22\.39 1,119\.60 848\.57 596\.35 787\.12 815\.74 624\.65 1999 270\.63 270\.63 589\.16 130\.22 14\.39 76\.81 522\.20 31\.35 1,364\.13 1,093\.50 798\.92 1,028\.39 1,055\.10 820\.67 2000 270\.14 270\.14 682\.23 127\.76 16 19 90\.54 713\.55 29\.29 1,659\.56 1,389\.42 1,048\.31 1,325\.54 1,344\.15 1,037\.51 2001 26967 269\.67 795\.57 135 37 1862 105\.92 429\.20 34\.65 1,519\.33 1,249\.66 851\.88 1,181\.98 1,196\.70 945\.79 2002 269 19 269\.19 91827 14345 21\.23 124 14 321\.90 31\.08 1,560\.09 1,290\.90 831\.77 1,219\.18 1,228\.83 978\.88 2003 26871 268\.71 1,034\.30 15205 24\.12 145\.71 0\.00 42\.51 1\.41869 1,149\.98 622\.83 1,073,96 1,077\.13 866\.24 2004 26824 268\.24 1,20727 161 19 27\.36 171 32 000 29\.71 1,596\.85 1,328\.61 724\.98 1,248\.02 1,242\.95 1,009\.24 2005 379 17 1 1 379 17 1,380\.75 17089 3103 201\.77 0\.00 57\.17 1,841\.61 1,462\.44 772\.06 1,376\.99 1,361\.55 1,094\.12 2006 378\.69 1_I 37869 1,548\.93 17987 34 57 23370 0\.00 61\.43 2,05850 1,679\.81 905\.35 1,589\.88 1,562\.96 1,268\.11 2007 26682 26682 1,707\.63 189\.33 3794 27123 0\.00 6604 2,272 17 2,005\.35 1,151\.54 1,910\.69 1,869\.74 1,550\.92 2008 26635 26635 1,936 12 99 31 42 72 31548 0\.00 71\.02 2,564\.65 2,298\.30 1,330\.24 2,198\.65 2,140\.56 1,785\.37 2009 26588 26588 2\.10065 20984 4620 36782 000 76\.41 2,800\.92 2,535\.04 1,484\.72 2,430\.12 2,351\.13 1,974\.86 2010 265\.42 265\.42 2,44456 22091 53\.30, 429\.93 126\.00 82\.25 3,356\.95 3,091\.53 1,869\.25 2,981\.08 2,876\.57 2,420\.14 2011 26475 264\.75 2,706\.61 23256 5877 52197 16800 88\.65 3,776\.56 3,511\.81 2,158\.51 3,395\.53 3,250\.83 2,756\.50 2012 264 49 264 49 2,998 27 244 84 64 86 637 91 126\.00 95\.60 4,167\.48 3,902\.99 2,403\.86 3,780\.57 3,584\.04 3,069\.49 2013 26402 26402 3,323\.17 25779 7162 78533 000 103\.17 4,541\.08 4,277\.06 2,615\.48 4,148\.17 3,884\.40 3,368\.84 2014 26402 264\.02 3,68543 271 45 79 14 97461 000 III 40 5,122\.03 4,85801 3,015\.30 4,722\.29 4,370\.71 3,833\.60 2015 26402 26402 4,089\.75 285\.86 87 50 1,21\.99 0\.00 120\.35 5,803\.45 5,539\.43 3,494\.56 5,396\.50 4,929\.44 4,378\.74 Total 4229\.86 ERR= i9\.1% 14\.1% 18\.3% 18\.4% 16\.0% NPV (12%) 2,689\.8 676\.0 2,394\.3 2,3S2\.0 1\.401\.3 First Yeasr Return (1994) = 9\.7% I1: hlajor resurfacing of expressway to be carried out over a two-year period\. I_2: The existing roads need to be upgraded when traffic reaches about 12,00 vehicles per day\. The estimated upgrading cost would be Yuan 5\.0 million per kls\. -44- ANNEX 1 TABLE 6: FINANCIAL EVALUATION (Y MILLION) Base Case Net Sensitivity Cash Revenue Costs Benefits Net Flow Total Operating (-10%) Self- Loan- Total Total Operat\. Loan Net Cash Onl Revenue Costs Operating Year financing IBRD Cost Maint\. Total Revenue Costs Repay\. Revenue Flow Equity (-10%) (+10%) (+10o%) (1) (2) (3=1+2) (4) (5=3+4) (6) (7) (8) (9=6-7-8) (10) (11=9-2-4) (12) (13) (14) 1989 50\.80 10\.47 61\.27 61\.27 045 /_I -0\.45 -61\.72 -51\.25 -61\.72 -61\.72 -61\.72 1990 254\.02 52\.34 306\.36 306\.36 3\.31 I_1 -3\.31 -309\.67 -257\.33 -309\.67 -309\.67 -309\.67 1991 254\.02 52\.34 306\.36 306\.36 6\.81 / l -6\.81 -313\.17 -260\.83 -313\.17 -313\.17 -313\.17 1992 508\.05 104\.70 612\.75 612\.75 13\.55 /_1 -13\.55 -626\.30 -521\.60 -626\.30 -626\.30 -626\.30 1993 762\.06 157\.04 919\.10 919\.10 24\.19 /_I -24\.19 -943\.29 -786\.25 -943\.29 -943\.29 -943\.29 1994 254\.02 52\.34 306\.36 111\.40 417\.76 183\.00 59\.00 25\.00 99\.00 -318\.76 -266\.42 -337\.06 -324\.66 -342\.'96 1995 127\.01 26\.17 153\.18 111\.40 264\.58 263\.00 141\.00 98\.00 24\.00 -240\.58 -214\.41 -266\.88 -254\.68 -280\.98 1996 127\.01 26\.17 153\.18 111\.40 264\.58 350\.00 153\.00 98\.00 99\.00 -165\.58 -139\.41 -200\.58 -180\.88 -215\.88 1997 203\.22 41\.87 245\.09 111\.40 356\.49 400\.00 160\.00 88\.34 151\.66 -204\.83 -162\.96 -244\.83 -220\.83 -260\.83 1998 111\.40 111\.40 444\.01 167\.68 90\.05 186\.28 74\.88 74\.88 30\.48 58\.11 13\.71 1999 111\.40 111\.40 493\.80 176\.06 91\.12 226\.62 115\.22 115\.22 65\.84 97\.61 48\.23 2000 111\.40 111\.40 569\.47 185\.74 93\.26 290\.47 179\.07 179\.07 122\.12 160\.50 103\.55 2001 111\.40 111\.40 638\.02 195\.96 95\.41 346\.65 235\.25 235\.25 171\.45 215\.66 151\.116 2002 111\.40 111\.40 714\.89 206\.74 97\.55 410\.60 299\.20 299\.20 227\.71 278\.53 207\.04 2003 111\.40 111\.40 801\.09 218\.11 99\.70 483\.28 371\.88 371\.88 291\.78 350\.07 269\.956 2004 111\.40 111\.40 897\.77 230\.11 101\.84 565\.82 454\.42 454\.42 364\.64 431\.41 341\.6\.3 2005 222\.80 222\.80 1006\.20 242\.77 101\.84 661\.59 438\.79 438\.79 338\.17 414\.51 313\.89 2006 222\.80 222\.80 1120\.98 256\.12 101\.84 763\.02 540\.22 540\.22 428\.12 514\.61 402\.51 2007 111\.40 111\.40 1248\.90 270\.21 101\.84 876\.85 765\.45 765\.45 640\.56 738\.42 613\.54 2008 111\.40 111\.40 1391\.44 285\.07 101\.84 1004\.53 893\.13 893\.13 753\.99 864\.63 725\.48 2009 111\.40 111\.40 1550\.31 300\.75 50\.92 1198\.64 1087\.24 1087\.24 932\.21 1057\.16 902\.13 2010 111\.40 111\.40 1727\.36 317\.29 0\.00 1410\.07 1298\.67 1298\.67 1125\.93 1266\.94 1094\.20 2011 111\.40 111\.40 1924\.70 334\.74 0\.00 1589\.96 1478\.56 1478\.56 1286\.09 1445\.09 1252\.62 2012 111\.40 111\.40 2144\.66 353\.15 0\.00 1791\.51 1680\.11 1680\.11 1465\.65 1644\.80 1430\.33 2013 111\.40 111\.40 2389\.85 372\.57 0\.00 2017\.28 1905\.88 1905\.88 1666\.89 1868\.62 1629\.64 Total 2540\.21 523\.44 3063\.65 2450\.80 5514\.45 Financial Rate of Return = 8\.8N% 10\.1% 7\.2% 8\.4% 6\.8% Net Present Value (I2%) = -653\.3 -345\.3 -933\.9 -731\.7 -1012\.2 I: Represents interest on amount withdrawn from the Bank loan as wellas commitment charges on unwithdrawn balance of the loan\. -45 - ANNEX 1 TABLE 7: FINANCIAL VOC SAVINGS vS TOLL RATES (Y/km, 1997 current prices) Small Medium Large Small Medium Large Tractor- Distance Savings Car Bus Bus Truck Truck Truck Trailer Section 1: Qingdo-Weifang North Road Savings 0\.41 0\.33 0\.04 0\.11 0\.68 1\.44 2\.81 45\.7 km 30% of Savings 0\.14 0\.11 0\.01 0\.04 0\.23 0\.48 0\.94 South Road Savings 0\.64 0\.78 0\.10 0\.16 1\.01 3\.16 4\.08 32\.0 km 30% of Savings 0\.21 0\.26 0\.03 0\.05 0\.34 1\.05 1\.36 Section 2: Weifang-Zibo North Road Savings (0\.54) (1\.61) (0\.13) (0\.07) (0\.92) (8\.66) (0\.38) -29\.1 km 30% of Savings (0\.18) (0\.54) (0\.04) (0\.02) (0\.31) (2\.89) (0\.13) South Road Savings 0\.80 2\.42 0\.39 0\.11 1\.45 15\.07 0\.83 -14\.0 km 30% of Savings 0\.27 0\.81 0\.13 0\.04 0\.48 5\.02 0\.28 Section 3: Zibo-Jinan North Road Savings 0\.25 0\.20 0\.03 0\.03 0\.12 0\.47 0\.07 8\.8 km 30% of Savings 0\.08 0\.07 0\.01 0\.01 0\.04 0\.16 0\.02 South Road Savings 0\.43 0\.63 0\.11 0\.11 0\.41 1\.32 0\.20 -6\.3 km 30%ofSavings 0\.14 0\.21 0\.04 0\.04 0\.14 0\.44 0\.07 Small Medium Large Tractor- Extra Vehicless Vehicless Vehicless Trailer Large Jinan-Qingdao Expressway 1997 Toll Charges - Under 100 km 0\.32 0\.40 0\.48 0\.72 1\.12 - 100-200 km 0\.29 0\.37 0\.45 0\.69 1\.09 -over 200 km 0\.24 0\.32 0\.40 0\.64 1\.04 Average 1 0\.28 0\.36 0\.44 0\.68 1\.08 30% of VOC Savings (1997): Section 1 100\.00 km 0\.11 0\.24 0\.39 1\.15 Section 2 98\.00 km 0\.03 0\.11 0\.56 0\.08 Section 3 120\.30 km 0\.07 0\.12 0\.16 0\.05 Average 30% of VOC Savings (1997): | 0\.07 0\.15 0\.37 0\.42 Ratios: 30% of VOC Savings / Toll rate Section 1 (1\.34 0\.59 0\.82 1\.60 Section 2 0\.09 0\.30 1\.23 0\.11 Section 3 0\.23 0\.31 0\.36 0\.07 Average 30% of VOC Savings ! 0\.22 0\.40 0\.80 0\.59 - 46 - ANNEX2 ANNEX 2: BORROWER'S CONTRIBUTION TO THE ICR Introduction 1\. The Shandong Provincial Highway Project was appraised in July 1988\. A loan of US$60\.0 million and a credit of SDR 38\.8 million (US$50\.0 million equivalent) was approved by the Board of Executive Directors on May 25, 1989\. The Loan, Credit and Project Agreements were signed on September 8, 1989, and the loan and credit were declared effective on December 11, 1989\. The original closing date for the loan and credit accounts was to June 30, 1995, but such date was extended June 30, 1997\. Each of the tasks referred to in the SAR and the Credit, Loan and Project Agreements were performed, and the execution of these tasks is formally evaluated in this report\. A\. Project Description 2\. The major objective of the project was to assist the Shandong Provincial Government in meeting the transport demand in the most important and congested corridor in the province and to improve the management of the road network by introducing modem planning and management techniques\. 3\. The project consists of: (a) construction of 319 km, four-lane divided, access controlled highway between Jinan, the capital of the province, and Qingdao, one of China's major seaports; (b) consulting services for construction supervision and training; (c) provision of specialized equipment and technical assistance for pavement evaluation, and paved road strengthening; Road Data Bank; (e) provision of maintenance equipment; (f) traffic monitoring, telecommunication and tolling systems; (g) staff training; and (h) assistance in improving road safety\. B\. Achievement of the Project Objectives 4\. The project achieved all major objectives for the various components as indicated in the following: (a) 319 km of Jinan-Qingdao Highway Project, traffic monitoring, telecommunication and tolling systems, as well as the service areas along the whole route; (b) consulting services in construction supervision and training; (c) Pavement Management System (PMS); (d) Road Data Bank (RDB); (e) equipment for central laboratory and research; (f) equipment for highway maintenance; (g) staff training; and (h) road safety\. Although the objectives of the project were essentially achieved, the implementation of the project was delayed and required the extension of the loan and credit closing date\. - 47 - ANNEX2 C\. Project Identification 5\. The Bank expressed interest in the Jinan-Qingdao Highway Project in September 1986, when a World Bank Mission visited Shandong Province to supervise the rehabilitation of the Yan-Gao road, which was a component one of the first Highway Project financed by the World Bank in China\. The proposed project was first discussed in November 1986 and approved by SPC, MOF and MOC shortly thereafter\. A Bank's mission identified the Jinan-Qingdao Project in February 1987\. The formal appraisal was conducted by the Bank in July 1988\. The negotiations were held in April 1989 in Washington DC\. The Development Credit, Loan and Project agreements were signed on September 8, 1989 and the loan and credit became effective on December 11, 1989\. 6\. During the evaluation period, the Bank had many discussions with the Shandong Provincial Transport Department (SPTD)\. After having appraised the project, the Bank missions concluded that the project would be a good investment, and the Bank would like to assist the Province and cooperate with SPTD in the implementation of the project\. The Bank's mission and SPTD reached an understanding on the Shandong Highway Project, according to which: the project in addition to help meeting the road transport demand in one of the most important corridors in China by financing the construction of a high- capacity high-standard highway, would also support the Province's objectives of increasing the cost effectiveness of the road transport subsector\. Specific policy, institutional and technological objectives would be the following: consultants services to help train the SPTD staff in the supervision and quality control of the highway construction, provision of equipment, material and technical assistance to strengthen pavements, provision of equipment for improving road planning by setting up a computerized road data bank and training of SPTD staff\. D\. Project Planning and Design 7\. According to the planning targets in the SAR the project would help in: (a) introduction of improved road planning techniques; (b) developing the methodology for evaluating existing paved roads and estimating strengthening needs; (c) modernizing design, construction and materials specifications and contract documents; (d) supporting the province's move to competitive bidding for civil works and developing the institutional capacity for the supervision of civil works construction; and (e) training of staff\. 8\. To accomplish these objectives, the project's scope includes the following: (a) construction of a 319 km, four-lane divided, access controlled highway, connecting Jinan, the capital of Shandong province, with Qingdao, one of the major ports of China; (b) consultants services for construction supervision and training; (c) provision of specialized equipment and expertise for pavement evaluation and strengthening paved roads; (d) provision of research equipment for the Central Road Laboratory; (e) provision of equipment to set up a computerized Road Data Bank to improve road planning; (f) provision of equipment for traffic monitoring, telecommunications and toll systems; (g) -48 - ANNEX2 provision of road maintenance equipment; (h) improving road safety; and (i) staff training\. E\. Project Implementation 9\. Jinan-Qingdao Highway\. The highway was divided into nine constructior contracts\. Contracts No\. 1-8 were for civil works and Contract No\. 9 was for traffic monitoring, telecommunications and toll systems\. The civil works construction of the highway started section by section from December 1989 and completed by the end of 1993\. The Contract No\. 1 (16 km) at the Jinan terminal was awarded under Local Competitive Bidding (LCB)\. A new airport was under construction about 16 km east of Jinan and just south of the JQE, as it was expected to be completed and be in use in late 1989\. The Contract No\. 1 of JQE had to be completed at the same time so as to provide access to the airport\. As International Competitive Bidding (ICB) procedures would delay the start of construction by several months, it was agreed that this first contract would be awarded following LCB procedures\. Contracts No\. 2-8 were awarded following ICB procedures\. The whole length of the highway (319 km) was opened to the traffic on December 8, 1993\. The construction of all toll buildings, administration buildings, maintenance depots and service areas along the highway started in early 1993 and was completed in mid-1997\. The Agreement of Contract No\. 9 (traffic monitoring, telecommunications and tolling systems) was signed on April 2, 1996\. A Spanish contractor was selected to carry out the works, following ICB procedures 10\. Consulting Services in Construction Supervision and Training\. A Danish consulting firm was engaged to carry out these services\. The allocation for this component in the SAR was US$1\.30 million\. The contract price was US$1\.465 million\. The actual payment amounted to US$1\.6547 million\. The contract was completed along with the civil works\. The Consultant provided 124 person-months of consulting services, including supervision training of local technical personnel\. 11\. Pavement Evaluation and Strengthening\. Shandong Provincial Transport Department and Finnish National Road Administration implemented this work with the cooperation of the Jining District, which was selected for this pilot project\. The work was completed on three national roads and five provincial roads with a total length of 560 km\. Then the system was converted to the standard Chinese PMS format (CPMS)\. The system was introduced and is operational in all 17 prefectures/ municipals, and covers the full length of the 17,000 km paved road network of the Province\. 12\. Road Data Bank\. The developing of Road Data Bank is a complex system with extensive technology and complicated structure\. Ministry of Communications made the unified planning for the development of RDB for the whole country\. The components, structure, model and hardware should be standard in accordance with MOC's nationwide program\. SPTD made a series of documents, such as specifications, coding and data dictionary through the pilot prefecture development\. The equipment procured for RDB - 49 - ANNEX2 are as follows: (a) sideways force coefficient measuring vehicle and (b) GPS system instrumentation\. 13\. Provision of Road Maintenance Equipment\. The allocation for this component in the SAR is US$2\.97 million\. The Bank approved the reallocation of loan/ credit proceeds for this component to be US$6\.10 million\. The procurement for all maintenance equipment as completed by mid 1997\. The main reasons for the differences are that the price of equipment has clhanged a lot with time, and some necessary equipment was added after advice was obtained from foreign and local experts\. 14\. Provision of Research Equipment for the Central Road Laboratory\. The allocated cost was US$0\.60 million\. The actual cost amounted to US$0\.485 million\. A skid-resistance test vehicle that was listed in the SAR was not acquired because the equipment available at the time of the procurement did not meet the required specifications\. The following equipment has been procured: (a) 19 Nuclear Densitometer; (b) 7 Automatic Bitumen Elevator; (c) 7 Bitumen Content Testing Equipment;(d) 5 Pavement Core Sampling Machines; and (e) Fittings\. 15\. Traffic Monitoring, Telecommunication and Toll Systems (Contract No\. 9)\. The International Bidding Documents of Contract No\. 9 were prepared by the Highway Research Institute of MOC, and reviewed by the Employer\. The Bidding Documents were issued on March 21, 1995\. The bids were opened on May 24, 1995\. Thirteen bids were received from nine countries\. The final evaluation report was submitted to the National Review Committee on September 21, 1995 and approved by the Committee, and submitted to the World Bank on December 11, 1995\. The World Bank approved on March 11, 1996 that the contract be awarded to a Spanish firm at a contract amount of US$9,770,334 and Y 42,891,225\. The contract was signed on April 2, 1996\. The estimated cost in the SAR is US$6\.15 million, but it covered the cost of equipment only and did not include the cost of installation of the systems\. The installation of equipment for the three systems was completed by the end of May 1997 except for lane monitors and printers\. The commissioning of the systems was completed at the end of June 1997 and trial operations started from first of July 1997\. 16\. Staff Training\. The total training program involved training 37 persons for 150 person months at an estimated cost of US$0\.90 million, according to the SAR\. Training programs as executed included 112\.1 person-months and 89 persons at a cost of US$0\.915 million\. Training courses were conducted as follows: (a) in July 1991, on project management for 6 persons over one month in England; (b) in 1991 and 1992, on highway design for 11 persons involving 28 person-months was conducted in England; (c) in 1991, on highway planning for 10 persons involving 15 person-months in the United States; on equipment management for 2 person involving 2 person-months in Germany and France; on financial management for 6 persons involving 4\.8 person- months in Thailand; and on highway maintenance for 4 persons involving 2\.6 person- months in France and Italy; (d) in 1992, on pavement management for 6 persons involving 4\.8 person-months in Canada; (e) in 1993, on highway and bridge construction -50- ANNEX2 for 6 persons involving 4\.8 person-months, on traffic engineering for 5 persons involving 5 person-months in Spain, and on Road Data Bank for 7 persons involving 10\.5 person- months in the United States; (f) in 1994, on highway organization for 5 persons involving 5 person-months in Italy; (g) in 1995, on financial management for 5 persons involving 3\.5 person-months in France, Italy and Switzerland; (h) in 1996 on expressway administration for 2 persons involving 1\.33 person-months in United States, and on highway maintenance in Germany and France; and (i) in 1997, on traffic engineering for 9 persons involving 9 person-months in the United States\. The cost overrun was only about US$15,000\. It was related to the inflation and higher consultant services fees\. 17\. Road Safety\. A UK based consulting firm provided 45 days of services for this programn\. The contract was signed on February 17, 1997\. During a four week visit in China the consultant had discussions with the representatives of JQEMB and Traffic Police, visited all sections of JQE and reviewed traffic data and black stops\. The draft final report, including the recommendations of the consultant was submitted to JQEMB in March 1997\. It has been updated following its review by a World Bank Mission and sections had been added on road safety objectives, a program for improvements, cost estimates and equipment specifications\. For equipment procurement, international shopping was adopted\. The bids were issued on May 1, 1997\. The contract was awarded to Shandong Expressway Developing Company\. The equipment for the program was delivered at the end of June 1997\. Based on original program in SAR, the objective of Shandong Road Safety Program was to apply the experience of Sichuan Province pilot study in collecting and analyzing traffic data and identifying black spots on the Xindiang- Tongyin (76 km) and Weifang-Wulian (124 km) road sections of Shandong provincial road network\. SPTD wanted to cancel this component for special reasons but then SPTD expressed the intention to conduct this safety program on JQE, the World Bank agreed to this alternative\. F\. Operation Experience 18\. The operation conditions of the JQE and other project components of the Shandong Provincial Highway Project are basically good\. 19\. Jinan-Qingdao Expressway The expressway was opened to traffic in December 1993\. The condition of the expressway remained very good during four years of operations\. The Average Daily Traffic (ADT ) is now reached about 15,600 vehicles, which is more than predicted in the SAR\. The toll collection reached Y 350 million in 1996\. The toll rates are being adjusted in three-year intervals according to the price index from the previous year\. The JQE has great economic and social benefits and has been very beneficial to the Province and to the areas along its alignment\. It became the "economic corridor" of Shandong Province and brought about a great advance in industrial and agricultural development\. The Jinan-Qingdao Expressway Management Bureau (JQEMB) was set up in December 1993 when the JQE was opened to the traffic\. JQEMB is an administrative unit of SPTD\. It is responsible for the operation and maintenance of JQE\. A new Expressway from Weifang to Laiyang is under construction\. -51- ANNEX2 The JQEMB it is also in charge of the management of this Expressway\. The Road Administration Bureau of SPTD is in charge of the provincial road network\. 20\. Traffic Monitoring, Telecommunication and Tolling System\. There was a good team supervising the works during construction\. The project quality and progress were ensured\. The payment was based on the terms of payment as specified in the standard contract documents of the World Bank, and Bank procedures were followed\. The main lesson learned is that the Contractor did not mobilize enough manpower and material resources, which caused implementation delay\. 21\. Pavement Management System ( PMS )\. After the successful completion of the pilot program the data collection and analysis have been extended to cover all national roads in the province\. SPTD issued two documents: "Temporary Provisions for using PMS in Shandong Province" and "Management Provisions for short-, medium-, and long- term Road Maintenance in Shandong Province" in order to make the most of the PMS program and improve road maintenance level\. G\. Work by Contractor and Consultant 22\. JQE was built under contracts awarded through competitive bidding\. The JQE was divided into 9 contracts\. Contract No\. 1-8 were for civil works: (a) Contract No\. 1, 16 km, was built under LCB procedures, Contractor: Shandong Transport Engineering Company (joint venture); (b) Contract No\. 2, 35\.2 km, Contractor: 14th Engineering Bureau of Ministry of Railways; (MOR) (c) Contract No\. 3, 25\.4 km, Contractor: Beijing Municipal Engineering Co\. (joint venture); (d) Contract No\. 4, 54\.1 km, Contractor: 20th Engineering Bureau of MOR; (e) Contract No\. 5, 41\.4 km, Contractor: First Highway Bureau of Ministry of Communications; (f) Contract No\. 6, 46\.6 km, Contractor: China Metallurgical Construction Co\.; (g) Contract No\. 7, 47\.6 km, Contractor: 4th Engineering Bureau of MOR; and (h) Contract No\. 8, 47\.6 km, Contractor: Beijing City Construction Co\. 23\. The contract periods were: 36 months for Contract No\. 1 and No\. 7-8 and 40 months for Contracts No\. 2-6\. Contract No\. 9 covered the supply and installation of traffic monitoring, telecommunications and tolling systems\. The contract was awarded to a Spanish company and the contract period was 9 months\. The major quantities for civil works performed by the contractor were: 29\.8 million cubic meter of earthworks, 4 special major bridges, 15 major bridges, 118 small bridges, 450 underpasses, 726 culverts, 21 interchanges, 45 grade separations and 6\.594 million square m of pavement\. The quality and operation conditions of the JQE are good\. 24\. Work by Consultant The consultants (Denmark) mobilized 5 persons and assisted local technical staff to supervise the construction of the highway over a three- year period\. The consultant's engineers were involved in all aspects of supervision work\. They were working closely with local engineers and contractors to improve job organization and management\. The consultant provided 124 person-months of services on construction supervision and training\. World Bank officials expressed their satisfaction - 52 - ANNEX2 with the work of the consultant when they supervised the project\. JQE was also praised by MOC and the Shandong Provincial Government\. 25\. Work by Supervision Engineer\. Jinan-Qingdao Expressway was contracted following International Competitive Bidding procedures\. The supervision engineers controlled quality, duration of contracts and payments for works in accordance with the clauses, supervision procedures and methods of the "FIDIC" conditions of contract\. To guarantee the work quality, the engineers implemented an overall supervision system of tasks "before, during and after construction\." The construction was not allowed to start until materials and equipment were tested and found satisfactory\. The spot-checking and inspection of ongoing works method adopted during construction were such that every aspect of the construction was tested or inspected for quality\. No payments were made for completed works if the quality was unacceptable after checking\. In this way, the work quality and investment were efficiently controlled\. 26\. Experience We have gained much experience through implementation of the Jinan-Qingdao Expressway\. The main experience is: (a) setting up rigid supervision procedures to enforce construction supervision as an effective method to ensure works quality, progress, investment control and satisfactory level for the management of works; (b) helping contractors to improve their work abilities based on the conditions of contract and technical specifications before each work item were to start was a foundation to improve work progress and reach quality standard at the same time; (c) strengthening site control, that is, the supervision engineers should be on-site and supervise each key phase of the procedures since checking and inspection of works are the guarantee to reach the quality required; (d) insisting to do pilot work before the start of each new construction item was an effective method to meet quality requirements; (e) the Employer was an organization center for implementation to control quality, progress and investment through coordinating relationship with each of the units involved; and (f) consciously accepting the instructions of the World Bank and actively cooperating were the guarantee to successfully complete the project\. H\. Works by the Executive Division 27\. Project Preparation\. SPTD made a thorough preparation of the JQE\. The feasibility study report was completed in October of 1985\. The task-planning document was approved in January of 1988\. The Jinan-Qingdao highway project was listed as one of the major projects in China by the State Planning Commission in 1990\. The design of the Jinan-Qingdao highway was prepared by the MOC's First Survey and Design Institute from Xian, the MOC's Highway Planning and Design Institute and Shandong Provincial Highway Design Institute\. The joint venture of China Highway Engineering Consultants and Louis Berger International (LBI), United States, assisted in the completion of the design and in the preparation of Bid Documents\. LBI's services were financed by the United States under its Trade Development Program\. The project approval, preappraisal, appraisal and negotiations were completed between September - 53 - ANNEX2 1986 and April of 1989\. The project was approved by the Executive Directors of the World Bank on May 25, 1989 and became effective on December 11 of 1989\. 28\. Project Implementation\. To implement the Jinan-Qingdao highway component of the project, the Shandong Provincial Government established a Construction Headquarters while SPTD established a Construction Headquarters Office in November 1986\. The Headquarters Office was responsible for the bidding, management, coordination, land acquisition and resettlement, planning and financial management, building materials supply, etc\. 29\. The Highway Administration Bureau of SPTD was responsible for the implementation of Pavement Evaluation and Strengthening and Road Data Bank component of the project\. The Jining Division was selected to do carry out the pilot works\. 30\. Experience-Jinan-Qingdao Highway\. The Employer took the FIDIC condition of contract clauses as the basis of administering the implementation and ensure the progress and the quality of works\. The experience had been that when the Employer paid attention to quality control good results were achieved\. Attention was paid in particular to the following four areas of the works: (a) expansion joints of bridges; (b) pavements; (c) compaction of subgrade; and (d) backfilling of abutments\. 1\. Major Factors Affecting the Project 31\. Jinan-Qingdao Highway\. The civil works of JQE were completed on time according to the contracts but the traffic engineering (traffic monitoring, telecommunications, and tolling systems) was started only after the highway was opened to traffic at the end of 1993\. The implementation agency did not pay great attention to traffic engineering because the leaders were busy with civil works, and had different views about when the traffic engineering works should commence\. Also, initially no specific unit was set up to organize and coordinate the traffic engineering works\. Consequently, the implementation of this component was delayed and it was necessary to request the extension of the loan and credit closing dates\. J\. Work by the World Bank 32\. Project Preparation\. The World Bank started to work on Shandong Highway Project in August 1986\. A Bank mission reviewed the feasibility study report, which was prepared by SPTD\. The Bank sent six more missions to investigate the technical, institutional and economic aspects and complete the appraisal of the project\. The SAR described the scope, economic benefits and the organizational arrangements for the implementation of the project\. During the project preparation and implementation, the Bank staff provided a lot of assistance to the Implementation Agency\. 33\. Project Implementation\. Bank missions visited Shandong Province many times to supervise the project during implementation and provided lots of practical suggestions - 54 - ANNEX2 on quality, financial management and institutional matters\. With the Bank's assistance a joint foreign/local supervision unit was set up to supervise civil works construction\. Such arrangement not only ensured the quality of works but also helped the training of local staff\. 34\. Cooperation between the Executive Agency and the World Bank\. The cooperation of the World Bank and the project Executive Agency was good\. The World Bank officers had full understanding of the transport infrastructure development needs and were helpful in providing support to the Province\. In recognition of the situation, the World Bank agreed to extend the closing date for the loan and credit\. Shandong Provincial Governient and SPTD would like to express heartfelt thanks to the World Bank for its cooperation and support, and hope to have further opportunity to get the Bank's assistance and the chance for even better cooperation\. 35\. Experience\. The major benefits have been: (a) through World Bank-financed highway project the FIDIC clauses of the conditions of contract have been widely adopted in Shandong Province for highway construction works since this system is very advantageous and effective; (b) through the training of personnel, a batch of professionals were trained on highway management, highway design and planning, finance management, highway maintenance and traffic engineering\. These people were well trained, and broadened and made full use of their knowledge during project implementation and they played important roles in their work; (c) on Road Data Bank and Pavement Management System, the two components promoted the Shandong highway management system and staff learned a lot about gaining new technology and got much experience through the implementation of this project component\. K\. Operation Planning 36\. Comments on Future Operation Planning: (a) Jinan-Qingdao Highway\. The design of some section is conservative\. For the Weifang Qingdao section, the width of designed subgrade is 23 m, the median divider is only 2\.5 m, the shoulders are 2x2-\.75 m wide\. This design does not meet the operational requirements and the foundation needs to be widened\. In fact, it would be very difficult to widen because the layout design of overpasses, interchanges, toll stations and service areas did not consider the additional land requirements\. On the other hand, the traffic of JQE is higher than the SAR estimates and has 3-5% of growth rate per year\. SPTD plans to build a new expressway from Jinan to Qingdao south of existing JQE around the year 2010 and before the traffic of JQE reaches saturation\. Also, SPTD would like to transfer 60% of operations rights (tolling rights) of JQE to China Merchants Holding Co\. of Hong Kong\. The transfer would be for 24 years\. A new company (Joint Venture) would be set up to operate, maintain and manage JQE during the period of transfer\. - 55 - ANNEX2 (b) Pavement Management System\. CPMS has actually been used in Shandong province, but with different level of use in different areas\. It is necessary to make further improvements in the level of usage as follows: (1) improving and perfecting the system itself; (2) improving the methods or ways of policy-making and management\. The study program on the "Second Stage Development of CPMS," which is being jointly conducted by SPTD and the Highway Scientific Research Institute of MOC, will be completed soon\. The study will modify the original cost model, deterioration model and policy model through a large number of data and perfect the functions of network level and project level systems, expand the content of pavement data bank and change the system operation environment into Windows\. It is expected that the new system of CPMS 3 will replace the existing version in 1998\. Without doubt, CPMS 3 will be easier to operate and will be more effective\. (c) Road Data Bank\. SPTD is planning to develop the provincial level RDB based on computer network working platform\. It is planned that RDB will be built up and operational in the whole Province before 1999\. (d) Supervision and Implementation Indicators for the JQE\. The indicators by which the Expressway's performance can be monitored and evaluated in the future are: Internal Rate of Return, Economic Net Present Value, Pay Period, Dynamic Payoff Period, Net Benefit Values, Traffic Volume, Generated Traffic Growth Rate, Traffic Accidents, Average Annual Maintenance Fee and Overhead ,as well as Tolling Rate and Tolling Revenue\. 57- ANNEX3 ANNEX 3: APRIL 1997 SUPERVISION MISSION'S AIDE MEMOIRE 1\. A World Bank supervision mission composed of Messrs\. Hatim Hajj, Han-Kang Yen and Ms\. Xin Chen supervised the Shandong Provincial Highway Project during April 7-11, 1997\. It met with representatives of the Shandong Provincial Transport Department (SPTD), Jinan-Qingdao Expressway Management Bureau (JQEMB), Sainco Trafico, the contractor for Contract No\. 9 (traffic engineering for the Jinan-Qingdao Expressway-JQE) and its subcontractors and the Supervision team for Contract No\. 9\. This Aide Memoire (AM) records the major points of discussion and understanding reached and is subject to management approval\. The list of participants is shown as Annex 1 and the documents received are listed in Annex 2\. The mission would like to thank SPTD and JQEMB for their hospitality and cooperation and the excellent arrangements for the mission's visit to JQE\. REMAINING WORKS 2\. All project components have been completed except for the: (a) traffic engineering (Contract No\. 9) for JQE; (b) a hotel in the service area of Qingdao: (c) procurement of equipment for the Road Data Bank (RDB), and some additional maintenance equipment; (d) 9 person-months of training; and (e) safety component\. Jinan-Qingdao Expressway 3\. JQE was opened to traffic on December 18\. 1993\. The quality of the completed works is reasonable and it seems that JQE is being well maintained and operated as a toll road\. Presently, the toll traffic is around 16,900 vehicles per day (vpd) near Jinan, 13,800 vpd between Jinan and Weifang and 14,600 vpd between Weifang and Qingdao\. Toll collections increased from Y 183 million in 1994 to Y 263 million in 1995, Y 350 million in 1996, and Y 83 million for the first quarter of 1997\. SPTD/JQEMB have invited a panel of experts to review the contributions/benefits of JQE and found it to have been very beneficial to the Province and to the areas along its alignment\. A copy of the panel's report was received by the Bank in November 1996\. 4\. Toll Buildings, Administration Buildings, Maintenance Depots and Service Areas for JQE\. All these buildings and facilities have been completed except for a hotel in the service area at Qingdao\. This is expected to be completed before the end of June 1997\. The quality of these buildings and their facilities is considered to be very good\. 5\. Traffic Engineering for JQE\. The contract for these works (tolling, monitoring and telecommunications) was signed on April 2, 1996 with Sainco Trafico of Spain, and - 58 - ANNEX3 the hardware design was conducted in Jinan during May 10-16, 1996\. The software design was reviewed in Spain during August 6-22, 1996\. The implementation of this contract is smooth\. Laying of metal and optical fiber cables has been completed\. Installation of equipment is almost complete and is expected to be finished by the end of April 1997\. About 22 engineers/technicians from the contractor are expected to arrive in China around the middle of April to speed up the works including software installation and testing and commissioning\. It is expected that commissioning will be completed by the end of June 1997\. This will be followed by a 6-month trial operation (July 1- December 31, 1997) and a one-year warranty (January 1 -December 31, 1998)\. Not all due payments to the contractor have so far been fully made\. It was agreed that any payments to be made to contractor after commissioning could be released against a nonconditional Bank guarantee that fully protects the interests of the Employer\. 6\. In a meeting on April 9, 1997 attended by the Employer, the Contractor and his subcontractors, the Supervision Team, and the Bank, it was agreed that: (1) The Employer would speed up payments to the Contractor,\. especially those in local currency; (2) The Contractor would, by April 14, submit to the Employer a revised realistic implementation program to complete Contract No\. 9 and a copy of this program signed by the Employer/Supervision and the Contractor would, by April 18, 1997, be submitted to the Bank's Resident Mission\. (3) The Contractor will do his best to complete one center/subcenter to meet the requirements of the Employer with regard to the visit by senior leaders from SPTD and other Provincial agencies to JQE during the first half of May 1997\. (4) The Contractor and the Employer would, by June 15, 1997, reach agreement on the numbers of staff by specialty and spare parts and tools that the Contractor has to provide during the trial period to minimize down time of the system(s)\. (5) The Employer would, by April 29, 1997, submit to the Bank (RMC) a revised cost estimate of Contract No\. 9 showing costs according to the contract, costs of variation orders (additions\. deletions, modifications), estimated costs for claims if any, and costs of likely additional works\. Also, the Employer would, at the same time, submit a report showing the justification for the additional works, their order of priorities, as well as the time program to implement these works\. On the basis of this information and the revised project cost estimate (to be submitted to the Bank-RMC by April 29, 1997), a decision would be made on whether it is possible for the Bank loan to finance these additional works (in whole or part)\. 7\. Supervision of Traffic Engineering for JQE\. The Bank representatives found that the organizational chart for supervision of Contract No\. 9 for JQE as well as the staffing and the key staff to be adequate\. The performance of the supervision team is considered reasonable\. - 59 - ANNEX3 Equipment 8\. All the equipment for the project has been procured and delivered except for two pieces of maintenance equipment and equipment for the Road Data Bank (RDB)\. Contracts for the remaining maintenance equipment have been signed and the equipment is expected to be delivered by May 15, 1997\. Contracts for the RDB equipment have also been signed and the equipment will be delivered during May 31-June 15, 1997\. Training 9\. All training under the project has been implemented except for 9 person-months in traffic engineering\. A contract for this training has been signed with Louis Berger International\. Arrangements are presently being made for completion of selection of trainees and their travel to the United States\. The training is expected to be completed before June 30, 1997\. Because of the tightness of the schedule, the Bank mission emphasized the need to speed up the procedures and to ensure that a qualified interpreter accompanies the trainees to the United States\. Safety 10\. A contract with Ross Silcock, Ltd\. (LTK) was signed to provide two person- months of services of a qualified traffic safety specialist to study the traffic accident situation along JQE\. Accordingly, Mr\. Mike Goodge visited Shandong for a month during February/March 1997 and submitted a rough draft report on his findings on March 22, 1997\. The mission reviewed this report with representatives of JQEMB\. It was agreed that the submitted report cannot be considered as a draft final report and that Ross Silcock will have to submit a proper draft report as soon as possible for review and comment by JQEMB and the Bank\. Also, the report should include a statement of safety targets, a defined program of improvements, approximate cost, and order of priorities\. Safety equipment needs (in the amount of about $60,000) were reviewed and it was agreed that these equipment would in principle consist of those for protection of road works and accident sites\. Mr\. Goodge's revised report would have to include a well defined list of these equipment and their specifications as well as their approximate cost and procurement schedule\. The Bank would have no objection to the purchase of such equipment through international shopping provided that they can be delivered by the closing date of the loan (June 30, 1997)\. PROJECT COST ESTIMATE 11\. The mission reviewed the draft cost estimate prepared by JQEMB/SPTD for the project and found that it requires further detailing and explanation of how it was determined\. Also, comparisons should be made with the cost estimate in the Staff Appraisal Report (SAR) and the reasons for the main differences between the two estimates should be adequately explained\. It was agreed that SPTD would prepare a revised report on the project cost estimate (by component) and deliver it to the Bank - 60 - ANNEX3 (RMC) by April 29, 1997\. This report would be discussed in a meeting to be held in Beijing by May 2, 1997\. REPORTING 12\. It was agreed that a combined summary report for the months of March and April 1997 would be faxed to the Bank by May 10, 1997\. This report should summarize progress during the reporting period and percent complete; payments to contractor and summary of variation orders and claims, if any; problems faced and proposed solutions; major changes to cost estimate or to completion time; and major activities planned for the following month\. Succeeding monthly reports would be submitted within 10 days of the end of the month\. The progress report for the first quarter of 1997 is to be submitted to the Bank by April 30, 1997\. Succeeding quarterly reports would be submitted within a month of the end of the quarter\. Furthermore, the audit report for 1996 should be delivered to the Bank by June 30, 1997\. PLANS FOR SALE OF JQE 13\. SPTD/JQEMB raised with the mission their plans to sell 60% of JQE to China Merchants Holdings Company of Hong Kong and to offer the remaining 40% as B-shares on either the Shanghai or Shenzhen Stock Exchanges\. JQE was valued by China Accounting Office at Y 5\.182 billion\. This assessment has been accepted by the Hong Kong Company\. SPTD intends to use the proceeds to finance new expressways in the Province\. SPTD and Shandong Province will be responsible for repaying the Bank loan/ credit and not the new company to be set up for JQE\. 14\. The proposed sale is expected to be submitted by the end of April 1997 to SPC, MOC and MOF\. SPTD hopes to get the required approvals including that from SETC by the end of July 1997\. A feasibility study is being undertaken by local firms to form the basis for the prospectus for the shares offering (40% of value of JQE)\. Approval from MOF, MOC, SPC and the State Stock Exchange Supervision Management Committee\. will be sought\. The last agency would also decide the size of the stock offering\. SPTD wants Bank approval of these plans\. Consequently\. it was agreed that SPTD would, as soon as possible, submit to the Bank a brief report explaining its intentions and plans, status of implementation of these plans\. and time schedule and asking for Bank, requirements for documentation in this regard\. IMPLEMENTATION COMPLETION REPORT 15\. In accordance with the agreements reached during the November 1996 supervision mission, the Bank on March 17, 1997 received the draft implementation completion report prepared by SPTD\. The Bank faxed its comments on this report to SPTD/JQEMB on March 18, 1997 and a prelimirary report on economic and financial evaluation of the project on March 31, 1997\. These comments and report were discussed with representatives of SPTD/JQEMB\. It was agreed that: -61- ANNEX3 (1) The cost estimate for the project by component (two tables-in the first cost is expressed in Yuan and in US dollars in the second table) and its comparison with the SAR and explanation of the reasons for major differences would be delivered to the Bank (RMC) on April 29, 1997 (see para\. 11)\. (2) The cost estimate (broken down into local-yuan-and foreign-US dollars- components) for JQE by year (1989-1997) and for each of the three sections (Qingdao-Weifang, Weifang-Zibo and Zibo-Jinan) would be delivered to the Bank (Washington, DC) by May 31, 1997; (3) SPTD/JQEMB would submit its revised draft ICR to the Bank by May 31, 1997\. (4) On the basis of the ICR report by SPTD/JQEMB and the above requested data as well as the information collected by the mission, the Bank would prepare the draft ICR and submit it to SPTD/JQEMB for review and comment by June 30, 1997; (5) SPTD/JQEMB would submit its comments on the draft ICR to the Bank by July 31, 1997\. (6) The final ICR would be submitted to the Bank's Board of Directors by December 31, 1997\. (7) In order to meet the above-mentioned schedule, it is essential that JQEMB is strengthened by qualified manpower\. NEXT STEPS 16\. It was agreed that the following documents/reports would be submitted to the Bank: (a) By April 18, 1997: A signed copy of the revised implementation program for Contract No\. 9 (para\. 6)\. (b) By April 29, 1997: (i) Revised cost estimate of Contract No\. 9 (para\. 6), and (ii) Report on revised project cost estimate (para\. 11)\. (c) By April 30, 1997: Project Progress Report for the first quarter of 1997 (para\. 12)\. (d) By May 10, 1997: Summary Progress Report for Contract No\. 9 for the months of March and April 1997 (para\. 12)\. (e) By May 31, 1997: Cost estimate for JQE by each of its three sections (para\. 15)\. (f) Undated, but preferably by April 30\. 1997: A report on sale of 60% of JQE to a Hong Kong company and offering of stocks for the remaining 40% (para\. 13)\. (signed) (signed) Hatim Hajj Zhang Junren Principal Transport Specialist Deputy Director, JQEMB Jinan, April 11, 1997 Note: The original copy of the Aide Memoire with Annexes 1 and 2 thereto is in the Project File\. IBRD 21119 ALGERIA AGRICULTURAL RESEARCH AND EXTENSION PROJECT M e dci t e r r a n e a n S e a PROJET DE RECHERCHE ET DE VULGARISATION AGRICOLE , A-nabau ,Tt LOCATION OF EXTENSION ACTIVITIES ALIERS J A\ SkikrJa SANABA /El T SITES DES ACTIVITIES DE VULGARISATION ALCIERS Z I JiJ'l \ S K I K A ElARF IT~~~\. Oo~~~F'R ~~JIJEL EL_TARF tW }-b (3Chlel \;iSAIi,f X f~ii 4Xlp MrE A ( J BORDJ BOU g 5 E T I F/'\ - An o _ J 2\. O Ro~Roio+T A N'Ch\.So, r- El BUD L $Khenhb \ AinTemouchnt AIN \. --? MASCARA -l_j )~T ) P' ---\.St <F j eesG TEMOt)~~~~~~~C H ENTF ?ANSffidnoBe ROIR IF M:sLAr -'Tir e / )~j SKaHRA -- ~~~\. \.- >Abces \ ) ~ ~ ~ - \. t f ( j ICHENCHELA J !o - w\.~~~~~~~~~~~~~~~~~~~~~~~~~~~~Di P-hiiEmCE !a_\. m , > ," ' EES h~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~E j\. Am R A E\- S Swi AM Def I L KA 0, j ~~~~~~~~~~~~~~~~~ ~~~~ H- L,f E F 0 SOI AHRA SORDJ BOU AEU TS~~SR( '1 0ChIef \WA n o RomV,lO Kj~, ME~~~~~EA '\. ®~~~~~~DBoidj Bo\. S E TI FWMLil Mo0ogon- \Y O- El Ra \. ghi \ \\.~~~~~~7 )RELIZANE ~~~~~~~~~~~~~~~~~~~~" _ ~~~~A AR RER) DJ r-xj (g d, OUM N A L H TELQ BOAGNI' ®O-o RELIZAN TI55EMSILT (' \. 'Ml~o® 0 R A N eine ,\.,-Tn,It) \.) ' > Aio T-kn,,ooho AIN ') MSAA -IAKIToNohA MUiSid, B', _\. C S ETA O TRAININ CT\ AbI6 / \--KH EXTENSIO D C KAR5ENCHELA o M TLEMCEN -, ) A A RE A5 DCA T - / EBS TIc S - SG DG IS ,Biskoaioa RNIREDSAIA 2' 5 I-D~~ - 5 S\.'~~~~~~~~~~ SILC!!id ABBES SAIDA -K\. ( '-Dief I S KR A LOgh-wC UE / ~~~~El Byodh NAAMA '-~~~~~~~~~~~~~~~~~~~~~~l, __ K EL ~~~~~~~~~~~~~~~~~~~~~~~~ ALGIERS I - ~~~~~~~~~~~~~~~CFV EXTENS ON TRAINING CENTERS *N\.-,, ,I E L B A YA DH 7 CFV CENTRE GE FORMATION ET DE VUJLGARI5ATION AGRICOLE 1~~~~~~~~~~~~~~ ~~~~~~EXTENSION DIARATE: WILAYA HEADQUARTERSS\. DIARATE DE FORMATION ET DE VULGARISATION AGRICOLE; SIEGES DES WTAYA D Defo Wiloy- NATIONAL CAPITAL - DAJRATE BOUNDARIES 19G' 0~~ 510 100 1 50 11--~ oo, Wil\.y\. FRONIIERES DES DAIRATE 1 KILOMETERS coco~~~~~~~Md\. Wil\.y\. WILAYA BOUNDARIES " Rechar / c~~~~~~~~~~~A,o\.h -,fl\.p,-d Thc,o \. oo\.,oi\. as W FRONTIERES DES WSAYA\.7 7 od,, f--,\.sopoo,rpo\.atoS\.C,I&k, INTERNATIONAL BOUNDARIES E C H AR T;\. O,-o WiIo FRONRTERES INTERNATTONAIES -, -, AUG,UST 1989 IBRD 20256R1 \.r~~~~~~~~\.2 16 nW ,~~~~~~~~~~~~~~~~~~~~~~~ ,* -~~~~~~~~~1 1Ql't2O -~ --;59 8 HEBEI 3 H* ,' U I M e,r _ t b E < 4 v g s I~~~~~~~~~~~~~~~nfetchomge odd Z\. ( 4_ (t ~/ ;}p54hng > \Huley / o~ N {gs IunmniAl/<\.y ?t dyng constuctiol rty<ng cRu nstruct 115 A~~~~~~~~~~~i g W / ~~~~~~~~~~~~~~~~~~~~~~Cl-IINA AL It 1X EGso'y-H 1°E_'-< N, ' >\.,',Zn2u SHANDONG PROVINCIAL HIGHWAY 37~ /< ' 90w \. f_l-> F 7,-aa \. -t4 \. -,,,,l \. O e A N f i Transport N etw ork '~~~~~~~~~~~~~~5 \.~~~~~~~~~~~ 31609 ~~~~~~~~~~~~~~~~~~~~~~~~~ogPOP SDPR JCT,- H EN A N /, e - '" ""'t';, _, 'T- Z ', - i gd- *\.E\.p\. T~~~~~~~ ,/ OPk/onr / <_ ,- xn 0 Transp;1, ort Netwoark > t _/ O D 9t p \ 2~ ~ ~ yz /< \ 0 0 0 0 >~4/tI z hilang PO PROPOS PECTSr-gthirg Prlgr 7~~~~~~~~~~~~7-1 0or' lN-tn Ongdo S-thResdoo - / -_ i TA I'Angwu N5 f , > zff t _ _ , | 1v nshu / _ _ Prowin- R -\.d\. Th\.~~~~~~ ~~~ \ord/o '73-2¾l- I -A Str\.ng h\.n25gSProgram HENAN \. HENAN ft > jr'U Sd Rood\. H~ig(oc1 E ZAE PoJenoO _ _ ShgPl Oil Field B-ra d-In\. Bounarie 1"5 ZAOZHLJANG -i-7 Lutoongeng \^ 13 12 12R thu ttto~~~~~~~~~~~~~~~~~~ do rot tIILOMETEOS~~~~~~~~~~~~~~~~~~~~~~~~~~~~KIOETR 1fM'JIUI APRIL 0996
REVIEW
P114766
 ICRR 14383 Report Number : ICRR14383 IEG ICR Review Independent Evaluation Group 1\. Project Data: Date Posted : 06/27/2014 Country : Kazakhstan Project ID : P114766 Appraisal Actual Project Name : Kazakhstan Moinak US$M ): Project Costs (US$M): Electricity Transmission Project L/C Number : L7738 Loan/ US$M): Loan /Credit (US$M): 48\.0 44\.73 Sector Board : Energy and Mining Cofinancing (US$M): US$M ): Cofinanciers : Board Approval Date : Closing Date : 12/31/2012 04/30/2013 Sector (s): Power (95%); Public administration- Energy and mining (5%) Theme (s): Infrastructure services for private sector development (100% - P) Prepared by : Reviewed by : ICR Review Group : Coordinator : Mamundi G\. Sri-Ram Robert Mark Lacey Christopher David IEGPS1 Aiyer Nelson 2\. Project Objectives and Components: a\. Objectives: According to the Loan Agreement, Schedule 1, and the PAD, the project objective is “to increase and improve the supply of electricity to business enterprises and households in southern Kazakhstan in an economically and environmentally sustainable manner â€?\. b\.Were the project objectives/key associated outcome targets revised during implementation? No c\. Components: There were three components: Component A: Construction of Transmission Lines -- (Costs: Appraisal US$45\.8 million; Closing US$44\.0 million)\. A1\. Construction of a 97\.3 km long 220 kV single-circuit overhead transmission line (OHTL) from the Moinak Hydroelectric Power Plant (MHPP) to Shelek substation; Construction of two 220kV transmission lines from 220kV MHPP Switchyard to MHPP (circuit 1-0\.484 km, circuit 2-0\.553 km)\. A2\. Construction of a 227\.78n km long 220kV single-circuit OHTL from MHPP to Robot substation \. Component B : Modernization of Substations-- (Costs: Appraisal US$21\.1 million; Closing US$18\.8 million)\. B1\. Construction of 220/110 kV outdoor switchyard to transfer power from MHPP to Kazakhstan Electricity Grid Operating Company (KEGOC) transmission lines\. B2\. Modernization of 220 kV Robot substation\. B3\. Modernization of 220 kV Shelek substation\. Component C : Consulting and Technical Services -- (Costs: Appraisal US$2\.5 million; Closing US$2\.5 million)\. C1\. Procurement and project management, including preparation of bidding documents, construction supervision and quality control\. C2\. Technical services, which include support for selection of transmission routes, engineering surveys and construction supervision of turn -key contracts\. None of the components was revised during project implementation \. d\. Comments on Project Cost, Financing, Borrower Contribution, and Dates: Project cost \. At appraisal the total project cost was estimated at US$ 69\.6 million, including a US$0\.2 million IBRD Front End fee\. The financing required was estimated at UD$ 73\.4 million, including interest during construction \. The Borrower, KEGOC, was to finance US$ 25\.4 million from its own resources\. The final project cost was US$65\.6 million (including the IBRD front end fee of US$ 0\.2 million), 5% below the appraisal estimate\. The final cost of the transmission lines was US $ 44\.0 million, 4% below the appraisal estimate of US$ 45\.8 million; substations cost US $18\.8 million, 11% below the appraisal estimate of US$ 21\.1 million\. Consultancy and technical services cost US $ 2\.5 million, as estimated at appraisal\. There were no significant changes in the scope of the project \. Financing \. US$44\.7 million (97%) of the IBRD loan of US$46 million was disbursed\. At closing, the unutilized US$ 3\.27 million of the Bank loan was cancelled \. There were no other external sources of financing \. Borrower contribution \. The Borrower’s contribution of US$ 20\.8 million was some 88% of the amount of US$ 23\.6 million anticipated at appraisal\. Dates\. Dates The Closing Date of the IBRD loan was extended by 4 months from December 31, 2012 to April 30, 2013 to allow KEGOC to complete testing of the MHPP before acceptance from the contractor \. 3\. Relevance of Objectives & Design: a\. Relevance of Objectives: High\. High The project’s objectives are relevant to the strategy of the government, which had chosen to invest significant efforts in support of the modernization and expansion of the power sector in order to address growing constraints to reliable power supply \. The Moinak Hydroelectric Power Plant (MHPP) was included in the 2010-2014 State Program of Accelerated Industrial and Innovative Development in the country \. The objectives are relevant to the March 2012 Country Partnership Strategy (CPS) for the Fiscal Years 2012-2017\. The CPS highlights as one of the country ’s priority development goals the development of infrastructure connectivity to reduce economic distance \. The CPS lists as one of the outcomes improving energy transmission to poor areas, by building on investments in transmission, focusing on the development of the country’s vast renewable energy resources, particularly wind and hydro power, into the national grid, and strengthening key regional power interconnections to alleviate severe network bottlenecks \. The objectives were also consistent with the CPS of 2004, and updated in a Progress Report dated May 1, 2008 to cover the period through 2010\. One of its key pillars was “investing in human capital and infrastructure â€?, given that the major segments of infrastructure (i\.e\., roads and power transmission networks ) did not meet the needs of a rapidly expanding economy\. b\. Relevance of Design: Substantial \. There is a clear causal chain between the activities designed to be supported by the project and the expected attainment of the development objectives \. The investment in the physical facilities, namely construction of transmission lines and modernization of substations combined with consulting and technical services (among others, to support selection of transmission routes that are least -cost and environmentally neutral ) are aimed at increasing the supply of electricity from the MHPP (already nearing completion) to the Southern Region\. This would not only increase the available supply of electric power but also improve quality and reliability, thereby enabling a reduction in load shedding and power outages that affect business and households \. Thus, the design enables supply of electricity in an economically and environmentally sustainable manner \. Design was optimized by choosing to link MHPP supply to the Southern Region, as the length of the transmission line from MHPP is far shorter than the national system ’s average\. The lending instrument (a Specific Investment Loan) was appropriate, while the three-component design that was selected was simple and tried before in similar electric power transmission projects \. Also, under previous projects with KEGOC, turnkey contracts for construction of transmission lines and substation rehabilitation had proved to be an efficient approach to implementing projects in a cost -effective manner without overburdening the company’s supervision capacity\. The project was critical to transmission of power from the MHPP, and thus had strong support from GOK\. 4\. Achievement of Objectives (Efficacy): The project’s development objectives were: “To increase and improve the supply of electricity to business enterprises and households in southern Kazakhstan in an economically and environmentally sustainable manner\. Outputs and Outcomes: The supply of electricity to southern Kazakhstan was increased by providing the facilities needed to evacuate electricity generated by MHPP\. The first high voltage line began operation in November 2011 and the second in August 2012—within 2 months of the original schedule\. The project has specifically resulted in several benefits listed in the ICR\. Thus, MHPP’s 300 MW of additional generating capacity has contributed to the reduction of the regional power deficit of Kazakhstan’s Southern Region\. 1\. Increased Supply of Electricity--rated High: The Southern Region is expected to be provided with 1000 GWh pa of hydro-electric power, much of which will be used to cover peak demand, which was hitherto unmet\. MHPP has provided some 430 GWh of power in its first 6 months of full capacity operation\. 2\. Improved Supply of Electricity—rated High: In terms of quality of supply, there has been no load shedding in the Almaty power region since the project came on stream\. While this is to a considerable extent attributable to the availability of MHPP, the expansion of the North-South transmission line, which had been a limiting factor in the past, also contributed to the elimination of load shedding\. 3\. Economic Sustainability—rated Substantial: The difficulty of fully accessing MHPP’s cost data makes an evaluation of the project’s contribution to the change in the average cost of power in the region difficult\. A moderate downward pressure is plausible, according to the ICR, since MHPP hydro-electric power is produced at a lower cost than the alternatives, including power supplied from the North over larger distances\. KEGOC has contracted with MHPP for 350 MWh of additional output (to make up for its transmission losses) at a price significantly lower than the cost would have been from power plants in Kazakhstan’s Northern region While the project did not contain any institutional strengthening component, the Bank’s engagement with KEGOC and GOK in the electric power sector over several years, including the ongoing Alma Electricity Transmission project, has contributed significantly to KEGOC’s operational and institutional strengthening\. According to the ICR (page 13), Kazakhstan has become a model for other countries in the region, having created an efficient, profitable and commercially oriented power system operator, a reasonably effective sector regulator and a competitive power market, with a sound overall institutional and legal framework\. Full recovery of justifiable costs including the cost of new investments are ensured by the Law on Natural Monopolies, and KEGOC’s tariffs were approved by the Agency for Regulation of Natural Monopolies on a cost-plus basis and included a 10 percent rate of return\. Also, the provisions of the Guarantee Agreement signed by the Government of Kazakhstan ensures that the transmission tariff would be maintained at levels sufficient to cover KEGOC’s longer term cash flow requirements—transmission tariff increases of about 10 percent per year have already been approved for the next three years\. All this contributes to financial sustainability\. 4\. Environmental Sustainability—rated High: IMHPP is physically closer to the Southern Region\. MHPP’s annual output of about 1000 GWh of electric power would replace the equivalent amount of energy generated by coal-fired plants, thereby saving about 1\.2 million tons of CO2 emissions, contributing to the environmental element of the development objectives\. MHPP was expected to reach this level of output by the end of its first year of operation, i\.e\., end 2013\. Indeed, economic efficiency and environmental sustainability are both served as hydro power is cheaper and more environmentally beneficial than other sources\. 5\. Efficiency: The project was implemented on time and under budget in spite of a tight implementation schedule that needed to be closely coordinated with completion of the MHPP (since operation of MHPP and construction of the transmission lines were mutually dependent \. The economic rate of return (ERR) for the entire project estimated by the ICR, using projections as of October 2013 is 16%, including the monetized value of the CO 2 emission savings, and 13\.6% if CO2 savings are excluded—this compares with the appraisal estimate of 17\.1% including CO2 savings\. The financial internal rate of return (FIRR) to KEGOC from the transmission component alone, according to the ICR is 20\.8%--high because KEGOC receives the same price for a kWh transmitted regardless of where the electricity is generated or consumed --the transmission line is shorter than KEGOC's average\. The assumptions that the ERR calculations are based upon are considered reasonable (electricity valued at consumer’s willing ness to pay; unserved demand reduced to zero; use of actual production figures in 2012 and projections for 2013; use of KEGOC’s assumption about peak demand requirements (in months where power utilization is assumed to exceed and average 100 MW, it is assumed that all outputs is used to cover peak demand )\. Efficiency is rated Substantial \. ERR )/Financial Rate of Return (FRR) a\. If available, enter the Economic Rate of Return (ERR) FRR ) at appraisal and the re- re -estimated value at evaluation : Rate Available? Point Value Coverage/Scope* Appraisal Yes 17\.1% 0% ICR estimate Yes 16% 0% * Refers to percent of total project cost for which ERR/FRR was calculated\. 6\. Outcome: The relevance of the project objectives is rated High, based on the country’s needs and priorities in the infrastructure and energy sectors, and overall economic development \. Based on the clarity of the links between inputs, outputs and outcomes, and of the results framework the relevance of design is rated Substantial\. The planned outputs and outcomes were fully achieved or exceeded, with the project having been completed below the estimated costs and having achieved substantial economic and financial benefits \. Efficacy of three of the four sub objectives, increased supply of electricity, improved supply of electricity, and environmental sustainability are rated High, while that of the fourth objective, economic sustainability, is rated substantial \. Efficiency is rated Substantial\. Thus the overall project outcome is rated Satisfactory\. a\. Outcome Rating : Satisfactory 7\. Rationale for Risk to Development Outcome Rating: As mentioned earlier, MHPP was expected to reach its full output by the end of 2013, the first full year of operation\. The dialog between the Bank and GOK on the electric power sector continues under two further transmission projects agreed upon according to the current FY 12-17 CPS\. The risk factors are listed below \. Technical: The technology introduced through this project is well established, tried and tested in Kazakhstan and elsewhere, and is relatively straightforward \. Furthermore, KEGOC’s staff is qualified and fully trained, and has operated earlier facilities such as those of the earlier North South Transmission project \. Thus, the likelihood of the project not achieving its development outcomes due to technical risks is low\. Financial: KEGOC’s overall financial position is sound, and it had no difficulty financing its share of project costs \. The Agency for Regulation of Natural Monopolies (ARNM) has consistently approved tariff increases to cover KEGOC ’s full operating and investment costs \. Although it cannot be totally ruled out that future requests for tariff increases may not be approved at the level requested, transmission tariff increases of about 10% per annum have been regularly approved for the subsequent three years \. Therefore, the likelihood of not achieving the development outcomes due to financial risks is also low\. Environmental: The project’s Environmental Assessment rating of ‘B’ appropriately reflected the initial assessment that the environmental risks were limited in scope and manageable \. KEGOC fully complied with the requirements of all environmental protection covenants \. Therefore, the likelihood of not achieving developments due to environmental risks is low\. Governance/Institutional: KEGOC had held discussions with the Bank on possible support for a Third North -South Electricity Transmission Project, which is included in the Bank ’s 2012-2017 Country Partnership Strategy\. That would strengthen the national power network and improve the reliability of electricity supply in Southern Kazakhstan, while also providing the basis for sustaining the dialog with the government on further sector reforms \. KEGOC has benefitted in the past from strong and capable management, which has had the support of government agencies responsible for overall policy setting \. As a result, the commercial focus of KEGOC has been “exemplaryâ€? (ICR, page 14) with minimal political interference\. In February 2012, KEGOC informed the Bank that it had been included in the government’s “People’s Initial Public Offering (IPO)â€? program for selected major state owned enterprises, whereby shares (from 5-15%) would be floated on the stock market \. The exact timing of the float is still to be determined \. While this is expected to strengthen the corporate governance practices, the IPO may introduce some element of uncertainty as to how KEGOC will be managed in the future \. Nonetheless, given the low percentage of shares offered, the likelihood of not achieving development outcomes due to governance/institutional risk is low\. a\. Risk to Development Outcome Rating : Negligible to Low 8\. Assessment of Bank Performance: a\. Quality at entry: Project preparation was short and efficient \. It took 10 months from Concept Review to Board \. The project benefitted from sound technical, economic and financial analyses, and used tried and tested technologies \. Project design was optimized, as MHPP requires a substantially shorter transmission line than the national system’s average, reducing capital and operating costs \. The Bank mobilized a team with all the necessary skills including expertise in electricity markets, engineering, procurement, environment and financial management \. The PAD (p 9) says KEGOC’s implementation financial management and procurement capacity were adequate \. This was demonstrated by its performance under prior and ongoing Bank financed transmission projects \. As stated in the PAD (p 39), the Bank team recommended the hiring of a project management consultant, and the use of a turnkey approach for the major contract to minimize the additional work for KEGOC’s implementation team\. The Bank’s environmental specialist identified the limited environmental impacts and verified that the environmental management plan (EMP) had adequate arrangements for mitigation and monitoring of the environmental impacts, and that the public consultations during project preparation were adequate \. The technical, environmental and social risk assessments were thorough, and identified adequate risk mitigation measures (PAD, pp16-21)\. The Bank considered the Borrower ’s suggestion that prequalification criteria be restricted to contractors who had performed similar contracts in countries other than their own countries of origin, but decided to proceed on the basis of the Bank’s Guidelines for Procurement, so that the process remained open to a broader cohort \. This led to some unanticipated difficulties during implementation (see Section 11 b below) at -Entry Rating : Quality -at- Satisfactory b\. Quality of supervision: The Bank team undertook supervision mission missions regularly during the three years of implementation \. Delays in the implementation schedule and the need to make up for lost time were recurring themes of ISRs and Aide Memoires\. The majority of the procurement issues were handled by the regional field office \. The EMP and its adherence were regularly monitored, and there were two FM /fiduciary missions\. A collaborative relationship was maintained with GOK and KEGOC, and the Bank was regarded as a trusted partner, as indicated in the Borrower’s Comments on the ICR (Annex 7, ICR)\. Although the Bank provided rigorous implementation support from a fiduciary perspective, according to the ICR, the Borrower was not able to complete the Land Acquisition Plan (LAP) in a timely manner to secure the Bank ’s formal approval\. However, prior approval of the LAP by the Bank to ensure compliance with the Bank ’s OP 4\.12 would have meant delaying work on the transmission line construction \. Therefore, the Borrower was alerted to this, and the Bank team worked with the Borrower to approve a LAP acceptable to the Bank, which included retroactive measures to ensure that all project -related compensation was in compliance with OP 4\.12\. The ICR states that all compensation was completed prior to loan closing \. As mentioned, the prequalification process did not eliminate potentially inexperienced contractors \. The Bank team was fully aware of the delay in preparation of detailed design packages, but delays were overcome after KEGOC undertook arrangements for their completion by hiring additional consultancy capacity \. The Bank agreed to extend the Closing Date from December 31, 2012 to April 30, 2013 in mid-December 2012, as a first and only extension requested by the Borrower \. Although construction works were fully completed and contract was to close by end December 2012, KEGOC required additional time to properly review and accept the works, carry out guarantee tests, and equally important, obtain signed acceptance certificates from a number of relevant GOK agencies\. The final payment could only be processed after the acceptance certificate was signed \. Thus, the Closing Date extension met the needs of the implementing agency without compromising project performance\. Quality of Supervision Rating : Moderately Satisfactory Overall Bank Performance Rating : Moderately Satisfactory 9\. Assessment of Borrower Performance: a\. Government Performance: The government accorded high national and regional priority to the MHPP \. It was included in the 2010-2014 State Program of Accelerated Industrial and Innovative Development in the country \. The project was assessed and cleared by the Ministries of Energy and Mineral Resources, Environmental Protection, Economy and Budget Planning, and Ministry of Finance \. Thus, the project enjoyed strong support from the government \. The Bank team coordinated with the key government agencies on the project ’s design, processing schedule and implementation plan\. The government monitored project implementation at the highest levels, with a site visit by the Prime Minister, and ensured timely financing and support for the speedy construction of the MHPP \. Government Performance Rating Satisfactory b\. Implementing Agency Performance: The Implementing Agency was KEGOC\. It obtained the approval of the “State Expertsâ€? and support of the relevant ministries for the feasibility study, environmental impact assessment, and the project ’s financing plan during preparation\. KEGOC had a fully staffed, effective Project Management Unit (PMU) with much experience implementing Bank financed transmission projects \. In order to ensure that the project was implemented in the shortest time possible, KEGOC hired an international consultant to assist with preparation and evaluation of bidding documents, and employed a turnkey contractor to ensure adequate coordination of all design and construction activities\. KEGOC provided financing for the Robot and Shelek substations and for the switchyard at MHPP, and ensured that these were completed on the agreed timetable \. The project faced initial implementation delays, because the turnkey contractor had difficulties in mobilizing the requisite team to complete detailed design on time, and because of difficulties completing contracts with local sub-contractors\. These were highlighted in supervision reports, and, following consultations between the Bank team and KEGOC, delays were overcome after KEGOC took over the task of completing detailed designs \. The contractor was pressed continually by KEGOC to speed up implementation activities to meet the tight timetable for the transmission line, which undertook key tasks in the early stages to avoid a serious slippage \. Thus it took remedial measures when the project was getting off track following the turnkey contractor ’s initially inadequate performance\. KEGOC developed an Environmental Management Plan (EMP) in compliance with Bank requirements and prevailing Kazakhstan legislation \. It implemented an effective environment monitoring system that included appropriate quarterly reports to identify problems as they arose, while also working closely with the contractors to ensure that the whole project was implemented on schedule \. Two Bank financial management missions found that accounting and auditing procedures were well designed and implemented at both the project and corporate levels \. The government and KEGOC ensured that the project remained in full compliance with the Bank’s fiduciary requirements and ensured that the project delivered the expected development objectives on time\. All audit reports were ‘clean’, there were no environmental issues and affected farmers were compensated for the short -term use of their land and for purchase of land permanently acquired for the project\. In all KEGOC was highly proactive, efficient and effective in decision -making, which contributed to the timely implementation of the project, below the original cost estimates \. Implementing Agency Performance Rating : Highly Satisfactory Overall Borrower Performance Rating : Satisfactory 10\. M&E Design, Implementation, & Utilization: a\. M&E Design: The outcome indicators were well designed to reflect project objectives and outcomes, except for one —reduction in the average wholesale price of electricity \. That was reexamined during supervision, determined to have little relevance, and was dropped \. Intermediate outcome indicators were adequate to monitor implementation progress and included: (i) timely completion of tender documents; (ii) contracts awarded in accordance with the deadline of the project’s Procurement Plan (PP); and (iii) exact items of equipment delivered, installed and commissioned in accordance with the PP\. The PAD Annex on Project Monitoring includes a quantitative indicator for measuring the project ’s impact on reducing the region’s power deficit: the GWh amount generated by MHPP\. The indicated target was 1027 GWh, reasonable for determining the deficit reducing impact of the MHPP and project transmission facilities \. It also contains a load shedding indicator, to be reduced to zero after project completion from a baseline that was subsequently determined to be 80MW\. Load shedding is also affected by factors other than the increase in MHPP generation capacity -- the increased electricity supply from the Northern region after completion of the second North-South Interconnector enabled elimination of load shedding before MHPP power supply became available, and this was recognized in M&E design \. Baseline data were included in the PAD for the four quantitative measures that wereto be tracked, namely the reduction of power deficit in the southern region, load shedding in the Almaty power region, average wholesale price of electricity, and CO 2 emissions based on demand growth to be met by thermal generation (PAD Annex 3) b\. M&E Implementation: Progress indicators were consistently used to keep track of and identify problems in implementation progress \. The slippages in implementation of procurement packages were identified on all supervision missions and agreement was reached on needed efforts to speed up the process and bring it in line with the procurement plan, which, in turn, was closely tied to the MHPP completion schedule \. At completion, KEGOC was to continue to collect information covering transmission of power from MHPP, and the amount of load shedding in the Southern Region, as part of its regular data collection process \. c\. M&E Utilization: Intermediate outcome indicators were used to ensure that project implementation remained on schedule \. The value of MHPP output continues to be collected \. The quantitative indicators related to increased capacity available during peak demand periods have been achievedKEGOC is to continue to providing operation data for the MHPP and electricity supply in the Southern region for the Bank ’s monitoring of project performance \. M&E Quality Rating : High 11\. Other Issues a\. Safeguards: The project triggered OP 4\.01 (Environmental Assessment), OP/BP 4\.12 (Involuntary Resettlement), and OP/BP 4\.37 (Dam Safety)\. Environmental Management (OP/BP 4\.01): The project was classified as Category B, as its potential impacts were expected to be for a limited duration and extent \. Key issues included the regular construction matters associated with the movement of machines, material and workers, dust, noise, engine exhaust and disposal of solid non-hazardous wastes largely from packaging and land preparation \. KEGOC prepared an EMP, held public consultations and subsequently posted the EMP on its public website and disclosed it in the Bank ’s InfoShop\. “The project is in full compliance with the environmental assessment regulations of the Borrower and World Bank environmental safeguard policies â€? (ICR, page 9)\. Involuntary Resettlement (OP/BP 4\.12): KEGOC acquired about 14 ha of land for permanent use and some 555 ha for temporary use, all agricultural and razing land, with a total of 316 affected persons\. According to the ICR (page 9), none had to resettled and all received reasonable cash compensation \. A Land Acquisition Policy Framework was prepared during project preparation \. However, construction of the transmission line started prior to the Bank’s formal approval of the Land Acquisition Plan (LAP), and the Borrower was alerted to this \. The Bank team worked with the Borrower to approve a LAP acceptable to the Bank and which included relevant retroactive measures to ensure that all project -related compensation was in line with OP /BP 4\.12\. This was completed prior to Loan Closing\. Dam Safety (OP/BP 4\.37): Although MHPP was not formally part of the Bank financed transmission project, it was considered a “connectedâ€? project, thus triggering the safeguard \. The Bank hired an independent dam safety expert to perform a due diligence assessment of the MHPP design, construction and envisaged operation \. The assessment found that the dam was designed by qualified engineers \. The design drawings were of high quality with sufficient details and quantitative assessments to confirm the dam ’s safety\. The Bank therefore concluded that the dam was consistent with the OP /BP (ICR, page 9)\. b\. Fiduciary Compliance: Project procurement was implemented in accordance with the Bank ’s Procurement and Consultant Guidelines and with the provisions in the Loan Agreement \. Procurement review missions were carried out regularly by the Bank team\. KEGOC’s administration of the procurement process was tight and well done for the turnkey contract, whose eventual value was some US$ 2\.7 million below the original cost estimate\. There were no reported cases of misprocurement \. The Bank considered the Borrower ’s suggestion that prequalification criteria be restricted to contractors who had performed similar contracts in countries other than their own countries of origin, but decided to proceed on the basis of the Bank’s Guidelines for Procurement, so that the process remained open to a broader cohort \. In the event, the process failed to eliminate companies with limited experience in turnkey contracts with a tight schedule\. The eventually selected contractor had difficulty in mobilizing the full team needed to meet the project ’ s extremely tight implementation schedule \. To avoid the delay, the implementing agency, in consultation with the Bank team, took over some tasks including arrangements for detailed designs and identification of local subcontractors\. Financial management \. The PAD (Annex 7) states that according to the Transparency International ’s Corruption Perception Index (CPI) of 2007 and 2008, there is a perception of high corruption in Kazakhstan \. However, the company that will implement the project has maintained strong governance structures that ensure compliance with corporate rules and policies as well as strong financial management arrangements \. KEGOC’s financial management procedures had been reviewed regularly as part of supervision of all ongoing Bank financed transmission operations and considered fully satisfactory \. Noteworthy elements were: --a sound project accounting system integrated with the corporate accounting system; --an experienced and skilled project management team including qualified FM staff; --timely and regular submission of satisfactory interim financial reports to the Bank; --timely submission of satisfactorily audited project and corporate financial statements; --effective internal control procedures that ensured completeness and accuracy of financial transactions \. Procedures followed under this project also included (i) regular reviews of compliance with the internal control framework; (ii) regular monitoring of activities of the Designated Accounts, including timely reconciliation of Designated Accounts with bank statements; (iii) quarterly submission of project Interim Financial Reports; (iv) audit of project financial statements by independent auditors on terms acceptable to the Bank; and (v) regular FM supervision reviews\. Project financial supervision missions were carried out in 2010, 2011 and 2012\. All missions confirmed the adequacy of the financial management system, including sound internal controls, and that KEGOC and the project were in full compliance with the Loan Agreement ’s financial covenants, and that there were no issues with counterpart funds\. KEGOC’s financial statements and project statements for 2010, 2011 and 2012 were audited by independent auditors acceptable to the Bank \. The auditors issued an unqualified (clean) opinion on the consolidated entity and project financial statements \. c\. Unintended Impacts (positive or negative): A positive outcome easily overlooked is that electricity blackouts and brown outs adversely affect poor households and those run by females\. Stability of electricity supply will have a positive benefit in terms of gender and poverty as well\. As mentioned in Section 4 above, the project did not contain any institutional strengthening component \. However, the Bank’s engagement with KEGOC and GOK in the electric power sector over several years, including the ongoing Alma Electricity Transmission project, has contributed significantly to KEGOC ’s operational and institutional strengthening \. Kazakhstan has become a model for other countries in the region, having created an efficient, profitable and commercially oriented power system operator, a reasonably effective sector regulator and a competitive power market, with a sound overall institutional and legal framework \. d\. Other: None 12\. 12\. Ratings : ICR IEG Review Reason for Disagreement /Comments Outcome : Satisfactory Satisfactory Risk to Development Negligible to Low Negligible to Low Outcome : Bank Performance : Moderately Moderately Satisfactory Satisfactory Borrower Performance : Satisfactory Satisfactory Quality of ICR : Exemplary NOTES: NOTES - When insufficient information is provided by the Bank for IEG to arrive at a clear rating, IEG will downgrade the relevant ratings as warranted beginning July 1, 2006\. - The "Reason for Disagreement/Comments" column could cross-reference other sections of the ICR Review, as appropriate\. 13\. Lessons: The following lessons are taken from the ICR with some adaptation of language : Early consultation with civil society and NGOs can help avoid project implementation problems \. In this project, during preparation, it proved to be critically important to hear from the NGO community and take into account their concerns in the final project design \. The concerns related to initial routing of the 2 transmission lines, and a timely re routing decision ensured that the lines did not encroach upon GOK -defined Specially Protected Natural Areas \. The development of a relationship of trust and confidence is key in projects of a relatively specialized nature involving sector reforms and institutional change \. In this case the continued involvement of the same Bank staff over a few projects has led to the modernization of the electric power sector in Kazakhstan that is far ahead ofother Former Soviet Union countries \. Even projects with limited land acquisition and no relocation of people require adequate attention from the outset from the Bank team \. The lack of consistent involvement of a qualified social scientist experienced with land acquisition issues both during preparation and implementation resulted in delays in approving the Land Acquisition Plan (LAP), and risked the project becoming out of compliance with the relevant safeguard covenant in the Loan Agreement\. This lesson also highlights the importance of early technical assistance and capacity building with in the client’s institutions\. 14\. Assessment Recommended? Yes No 15\. Comments on Quality of ICR: The ICR provides adequate detail on objectives, outputs and outcomes \. The document is analytical and arrives at conclusions that are largely supported by evidence, with clear explanations for the ratings \. Overall, the ICR is both internally consistent and consistent with OPCS guidelines \. The economic and financial assumptions informing the efficiency analysis are clearly set out \. a\.Quality of ICR Rating : Exemplary
REVIEW
P088520
Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) Report Number : ICRR0021425 1\. Project Data Project ID Project Name P088520 IN: Biodiver Cons & Rural Livelihoods Country Practice Area(Lead) India Environment & Natural Resources L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-49430 31-Mar-2018 8,906,927\.80 Bank Approval Date Closing Date (Actual) 17-May-2011 31-Mar-2018 IBRD/IDA (USD) Grants (USD) Original Commitment 15,360,000\.00 0\.00 Revised Commitment 15,360,000\.00 0\.00 Actual 3,170,222\.24 0\.00 Prepared by Reviewed by ICR Review Coordinator Group Katharina Ferl Ridley Nelson Christopher David Nelson IEGSD (Unit 4) PHPROJECTDATATBL Project ID Project Name P088598 IN: Biodiver Cons & Rural Livelihoods ( P088598 ) L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF-96651 31-Mar-2018 5,960,589\.32 Page 1 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) Bank Approval Date Closing Date (Actual) 17-May-2011 31-Mar-2018 IBRD/IDA (USD) Grants (USD) Original Commitment 0\.00 8,140,000\.00 Revised Commitment 0\.00 5,960,589\.32 Actual 0\.00 5,960,589\.32 2\. Project Objectives and Components a\. Objectives According to the Project Appraisal Document (PAD) (p\. 5) the objective of the project was “to develop and promote new models of conservation at the landscape scale through enhanced capacity and institution building for mainstreaming biodiversity conservation outcomes”\. The objective as stated in the Financing Agreement of June 14, 2011 (p\. 4) only differed slightly by using landscape “level” instead of “scale”\. The Project Global Environmental Objective is to enhance the conservation of globally significant biodiversity and ensure its long-term sustainability by promoting appropriate conservation practices in biodiversity-rich landscapes\. b\. Were the project objectives/key associated outcome targets revised during implementation? No PHEVALUNDERTAKENLBL c\. Will a split evaluation be undertaken? No d\. Components The project included four components: Component 1: Demonstration of Landscape Conservation Approaches in Two Pilot Sites (appraisal estimate US$13\.11 million of which US$3\.12 million from Global Environmental Facility (GEF) and US$6\.73 million from the International Development Agency (IDA), actual US$3\.43 million): This component was to finance the development of tools, techniques, knowledge and skills towards improved conservation and rural livelihoods outcomes in the Little Rann of Kutch in Gujarat and Askot in Uttarakhand\. These landscapes were to include protected areas, biological corridors, and high-value conservation sites in production landscapes\. This component was to include activities such as participatory ecological and social mapping to identify areas of high biodiversity value and resource dependencies and threats, improved management of biodiversity rich areas within and outside the protected areas in the landscape, and mainstreaming of biodiversity considerations in production areas within the Page 2 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) landscapes\. Furthermore, activities such as the development of common agreement and frameworks for the coordination among stakeholders, and technical assistance and training to facilitate the integration of biodiversity considerations in development plans of sectoral line agencies through dialogue and collaboration with sectoral agencies were to be financed\. Also, this component was to support the development and implementation of livelihood strategies to enhance local community benefits from sustainable management of natural resources linked to conservation\. Component 2: Strengthening knowledge management and national capacity for landscape conservation (appraisal estimate US$6\.22 million, of which US$2\.49 million from GEF and US$2\.28 million from IDA, actual US$2\.20 million): This component was to finance support to improve knowledge and capacity building based on learning and experience from the two demonstration landscapes (in Component 1) and other local conservation models\. Two sub-components were to support field learning centers and a national capacity-building program which was to draw on and distil good practices from the two pilot sites (in Component 1) and the three field learning centers as well as other successful conservation initiatives in the country\. Component 3: Scaling up and replication of successful models of conservation in additional landscape sites (appraisal estimate US$7\.57 million of which US$2\.06 million from GEF and US$3\.28 million from IDA, actual US$3\.10 million): This component was to finance further testing and replication of landscape conservation approaches to two additional high biodiversity landscapes from the third year onwards with project financing\. Component 4: National Coordination for Landscape Conservation (appraisal estimate US$4\.12 million, of which GEF US$0\.48 million from GEF and IDA US$3\.06 million from IDA, actual US$0\.24 million): This component was to finance the coordination for landscape conservation at the Ministry of Environment and Forests (MOEF)\. Activities to be financed were to include the establishment of a Management Information System (MIS) for project and landscape monitoring, impact evaluation, and limited operational and technical support to enable MOEF to coordinate and administer the implementation of project activities and facilitate replication elsewhere in India\. This component was also to support preparation activities for the two additional landscape sites to be supported under Component 3 as well as the establishment of a national communication system for the project, policy and legal studies relating to conservation, impact assessment and review, and third-party monitoring of the project\. e\. Comments on Project Cost, Financing, Borrower Contribution, and Dates Project Cost: The project was estimated to cost US$31 million\. Actual cost was US$8\.51 million\. Financing: The project was financed by a US$15\.36 million IDA credit of which US$3\.17 million was disbursed and a US$8\.14 GEF Trust Fund of which US$5\.96 million was disbursed\. Borrower Contribution: The Borrower was to contribute US$6\.59 million and local communities were to contribute US$930,000\. Both contributions did not materialize since at appraisal, the estimated contributions from borrower and local communities expected were in kind only\. Dates: The project became effective on July 13, 2011\. The Mid-Term Review was held as planned on February 27, 2015 and project closing was as planned on March 31, 2018\. Page 3 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) 3\. Relevance of Objectives Rationale India is one of 12 mega-diversity countries in the world and accounts for approximately 10 percent of the world’s biodiversity\. India’s biodiversity is critical for sustainable livelihoods\. It is estimated that around 27 percent of India’s population is dependent locally on forests for their subsistence and livelihoods, which they earn from fuelwood, fodder, poles, and a range of non-timber forest products\. However, the country’s biodiversity is threatened by increased population pressure, overutilization of resources, and by sectoral planning and development which largely do not support conservation objectives\. The government of India has established more than 500 protected areas (PAs)\. However, these PAs are often surrounded by other form of land use which often does not support conservation efforts\. Therefore, in 2005, the Prime Minister’s Office established a task force which developed a set of conservation actions and emphasized the importance to include larger production systems surrounding PAs when addressing conservation and livelihood concerns\. According to the Bank team (November 19, 2018) important lessons from the project informed the latest National Wildlife Action Plan (NWAP) 2017-2031\. The objective of the project was in line with the Bank’s Country Assistance Strategy (FY09-12) which aimed to ensure sustainable development by working for improving livelihoods in high biodiversity landscapes under its second pillar\. Also, the objective of the project supported the Bank’s Country Partnership Strategy (FY13-17) which focused in its engagement area “transformation” on bringing 500,000 hectares under enhanced biodiversity protected area management\. The objective of the project is also in line with the Bank’s most recent Country Partnership Framework (FY18-22) which includes “resource efficient growth” as a focus area Rating Substantial 4\. Achievement of Objectives (Efficacy) PHEFFICACYTBL Objective 1 Objective To develop new models of conservation at the landscape scale through enhanced capacity and institution building for mainstreaming biodiversity conservation outcome: Rationale The project’s theory of change linked the development of protected area (PA) management plans, the preparation of village based micro-plans that included economic activities and biodiversity conservation, the development of national courses on landscapes, and government institutions receiving capacity building support with enhancing capacity and institution building for mainstreaming biodiversity conservation outcomes\. Page 4 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) Note that this objective is to ‘develop new models of …’, Objective 2 is to “promote new models of …\.”\. Outputs: • Four landscape conservation approaches were successfully adopted in two landscape sites\. However, the ICR (p\. 29) stated that the scale of implementation remained low and several project activities that would have contributed to a successful adoption were only partially implemented\. Therefore, the target was only partially achieved\. • 550,000 hectares of areas were brought under enhanced biodiversity protection, achieving the target of 500,000 hectares\. The ICR (p\. 31) stated that the evidence for this indicator came from the published management plan, expenditure vouchers for habitat improvement works and population census reports\. However, the ICR did not specify what the "enhancement" entailed\. • The amount of forest areas which were brought under management plans increased from 300,000 hectares in 2012 to 600,000 hectares in 2018, achieving the target\. • Over 400 micro-plans with identified investments of about US$7 million were developed but actual investment fell significantly short of target (less than $3 million spent)\. • About 500 youth were trained in hospitality services and about 350 youths were gainfully employed for over a year\. • Sustainable resource use practices including production and use of organic fertilizers, gravity-based storage and harvesting, sustainable forestry management practices were introduced\. • Landscape management approaches were adopted in two additional sites with project funding, achieving the target of two additional sites\. • Five staff were hired for the national coordination unit within the MOEF to actively supporting landscape approaches, not achieving the target of 11 staff\. The ICR (p\. 39) stated that some key positions such as communication expert was never appointed\. This indicator contributed to both parts of the PDO\. • Key project outputs were not completed on time compared against the implementation plan\. Consolidated bi-annual progress reports were not submitted, updated procurement plans were not shared and uploaded to the Systematic Tracking of Exchanges in Procurement (STEP) platform and IUFR submission was generally delayed\. Therefore, this indicator, which was to contribute to both parts of the PDO, was not achieved\. Outcomes: • Four new landscape approach-based models emerged including the decentralized planning and mainstreaming centric, the traditional institutions and local governance centric, the community participation and financial inclusion centric, and the convergence centric\. • The amount of landscapes that were more effectively managed for conservation outcomes increased from 300,000 hectares in 2011 to 600,000 hectares 2018, achieving the target of 600,000 hectares\. This indicator contributed to both parts of the PDO achieved\. Page 5 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) Rating Modest PHREVDELTBL PHEFFICACYTBL Objective 2 Objective To promote new models of conservation at the landscape scale through enhanced capacity and institution building for mainstreaming biodiversity conservation outcome: Rationale Outputs: • An institutional and methodological framework was under consultation for finalization at the time of project closing\. However, the framework has not been field tested and formally approved by the MOEFCC\. Therefore, the target was only partially achieved\. • Six government institutions (the Forest Departments of Madhya Pradesh, Uttarakhand, Gujarat, Tamil Nadu and Kerala, and the Wildlife Institute of India) were provided with capacity building to improve management of forest resources, fully achieving the target\. • Landscape management approaches or specific elements of it were adopted in three additional sites and funded from the state government budget, achieving the target\. • 1,000 key stakeholders from at least five national priority landscapes were trained in landscape conservation approaches, surpassing the target of 250 key stakeholders\. • 15 new documents on good practices were prepared and knowledge dissemination events were sponsored, surpassing the target of ten documents\. Outcomes: • The population of all key indicator species across all project landscapes showed stable and/or increasing trend\. The project supported a census in 2014 which found that the wild ass population at LRK was estimated at 4,451 against the baseline of 3,863 in 2004\. Therefore, the target was achieved\. However, first the period from 2004 to 2014 was only covered by three theoretical years of project support and probably barely 2 years of practical support so the quoted change in population could have come before the project completed any significant intervention\. Second, changes like this can be impacted by external variables such as rainfall\. Therefore, there may be limited causation\. • 550,000 hectares are reported to have been covered by strengthened management\. However, the ICR (p\. 34) stated that no Management Effectiveness Tracking Tool (METT) score was undertaken so it was Page 6 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) not possible to estimate the percentage increase in management effectiveness as this indicator would have required\. Therefore, this indicator is considered only partially achieved\. • 10 percent of target user groups adopted alternate and/or sustainable resource use practices, not achieving the target of 20 percent\. • 75 percent of targeted villages or user groups completed 400 micro-plans across the four project landscapes\. However, the implementation of micro-plans remained partial\. Therefore, this indicator was only partially achieved\. • A large part of the population are reported, qualitatively, to have benefited from non-cash incomes through sustainable access and use of natural resources, agro-forestry, improved pastures etc\. However, real income was not measured and was only based on anecdotal evidence\. Therefore, it is not clear to what extend the target of at least 20 percent of targeted population was achieved\. • 50,000 hectares of new areas outside protected areas were managed as biodiversity friendly, achieving the target of 50,000 hectares\. • documents\. This indicator contributed to both parts of the PDO\. Rating Modest PHREVDELTBL PHOVRLEFFRATTBL Rationale The achievement of both objectives was Modest\. Overall Efficacy Rating Primary reason Modest Low achievement 5\. Efficiency Economic Efficiency: The PAD did not include a traditional economic analysis due to the lack of data to monetize benefits\. Furthermore, the PAD stated (p\. 69) that available methodology for quantifying biodiversity benefits of this project would result in estimates of relative weights for various benefits that would not be consistent with judgments by specialists\. The PAD did not explain what it meant by "estimates of weights not being consistent with judgments by specialists"\. The ICR (p\.13) estimated the Net Present Value (NPV) and Internal Rate of Return (IRR) for specific investment activities with measurable outputs\. In terms of livelihood improvements only 40 percent of committed project funds were disbursed, and outcomes achieved were lower than expected\. The ICR Page 7 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) estimated an IRR of around 14 percent\. Based on projections for the next 10 years and applying a discount rate of 12 percent for four investment activities including cash crops, honey production, revenue from park entry fees and job placements following skill training, the ICR estimated the NPV at INR 3\.03 crores (US$0\.44 million)\. The ICR did not indicate the basis for the use of the 12% discount rate\. Furthermore, the ICR (p\. 14) stated that a recent study in India estimated the monetary value of flow benefits of 25 ecosystems services from six protected areas\. The benefits ranged from INR 50,000 to INR 190,000 (US$725 to US$2,758) per hectare per year\. The economic value of provisioning water to downstream regions from Kanha Tiger Reserve was estimated at approximately INR 400 (US$58) per hectare per year\. The ICR used the Benefits Transfer Method to calculate benefits of investments to improve habitats and Protected Area Management\. Taking the low disbursement of 40 percent into account, water provisioning services of about INR 1,600 (US$25) per hectare per year (a total economic value of INR 96 core or US$14 million) were estimated from protected areas within project landscapes\. However, these estimates were not included in the calculation of the NPV and IRR since actual valuation of flow of benefits was not estimated for project sites\. Operational Efficiency: During project implementation the project experienced delays in the release of funds and delays in contracting staff for the PMU\. Furthermore, the project experienced implementation delays due to low financial management and procurement capacity\. All these delays suggest inefficiency in the use of project resources\. Given the modest IRR relative to the discount rate and the fact that it was only based on some of the investments and given the significant implementation delays, the overall Efficiency is rated Modest\. Efficiency Rating Modest a\. If available, enter the Economic Rate of Return (ERR) and/or Financial Rate of Return (FRR) at appraisal and the re-estimated value at evaluation: Rate Point value (%) *Coverage/Scope (%) Available? 0 Appraisal 0 Not Applicable 0 ICR Estimate 0 Not Applicable * Refers to percent of total project cost for which ERR/FRR was calculated\. 6\. Outcome Relevance of objective was Substantial given the importance of India’s biodiversity for sustainable livelihoods\. Achievement of both objectives and efficiency was Modest\. The overall outcome rating was Moderately Page 8 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) Unsatisfactory\. The project exhibited significant shortcomings in efficacy and efficiency and warranted early restructuring\. a\. Outcome Rating Moderately Unsatisfactory 7\. Risk to Development Outcome The Ministry of Environment, Forest and Climate Change (MOEFCC) has funded the continuation of the project as a central sector scheme and has allocated approximately US$2 million for the year 2018-2019 out of its own budget\. Also, the Ministry has issued an impact assessment to identify potential areas which require continuous support by the government\. The ICR (p\. 27) reported that stakeholders are motivated to continue to build on conservation-linked livelihood opportunities\. Also, the government of Gujarat, has decided to replicate the project\. However, the risks of slow budget transfer and disbursement in addition to limited technical and administrative capacity persist, posing a threat to the sustainability of outcomes achieved under the project\. Furthermore, the Bank team (November 20,2018) stated that even though all project supported landscape societies want to continue their activities, only some societies that had already existed before the project, and were co-opted by the project, have a higher possibility of continuing as they have access to financing and technical resources\. The newly formed societies may find it challenging to arrange funds and technical resources, in absence of project financing\. This is primarily because resources to augment and establish these societies for operating independently could not be found due to limited available funding from the project\. 8\. Assessment of Bank Performance a\. Quality-at-Entry The project design was informed through site specific studies and indicative plans for landscape\. The objective of the project reflected the government’s priorities and was realistic\. The Bank team conducted several multi-stakeholder consultative workshops, prepared investment plans for identified landscapes and complied with its fiduciary role and developed a Governance and Accountability Action Plan (GAAP) and a Project Process Framework\. Project preparation was extensive and lasted over seven years which resulted in a change and reduction in project scope and in implementing agency\. Also, the ICR (p\. 19) stated that even though the preparation phase was long, the readiness of the implementing agencies was low and the staff was not ready at the beginning of project implementation\. Furthermore, the project design was overly complex, lacked an adequate Results Framework and did not plan for sufficient resources for project monitoring (see section 9a for more details)\. The Bank team at appraisal identified relevant risks\. The risk of the implementing agencies being new and widespread with limited financial management and procurement capacity was identified as High\. Page 9 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) The following risks were rated Substantial: i) strict interpretation of existing and proposed policies and laws relating to conservation hindering the promotion of local decision-making and participation in conservation action; ii) project benefits not being captured by intended beneficiaries due to lack of adequate measures of transparency and disclosure and absence of a grievance-handling system; iii) inadequate and inaccurate flow of information resulting in misconceptions about the project and hence leading to opposition by some civil society groups; iv) MOEF lacking capacity to coordinate and monitor project effectively and ensure timely fund flows to landscape and training sites\. Mitigation measures were not adequate and there were several risks such as challenges to financial management and procurement, flow of funds and lack of capacity for project monitoring materialized resulting in implementation delays and shortcomings such as poor fiduciary oversight\. Quality-at-Entry Rating Moderately Unsatisfactory b\. Quality of supervision According to the ICR (p\. 26) the Bank team conducted ten implementation support missions and one mid- term review mission\. Several interim technical missions on specific topics such as preparing the landscape atlas were also conducted\. The Bank conducted an annual post-procurement review and findings were shared with the client in a report\. Also, the Bank built capacity through conducting procurement trainings on a regular basis at the MOEFCC and implementing agencies\. Furthermore, the Bank supported the implementing agencies in addressing complaints to improve internal controls and provided technical and operational advice to address implementation issues\. The Bank raised the issue of insufficient budget and delayed release in tri-partite portfolio review meetings, aide memoires and implementation status reports\. At the mid-term review and every mission afterwards, the Bank team suggested a project restructuring\. However, the Bank was unsuccessful\. This failure to achieve a substantial early restructuring was a significant weakness in both Bank and Borrower supervision and contributed directly to the weak implementation and monitoring\. Quality of Supervision Rating Moderately Unsatisfactory Overall Bank Performance Rating Moderately Unsatisfactory 9\. M&E Design, Implementation, & Utilization a\. M&E Design The objectives of the project were clearly specified\. However, the project’s theory of change and how outputs would lead to intended outcomes was not well reflected in the selected indicators in the Results Framework\. Some of the indicators were not sufficiently well defined\. For example, PDO Indicator 3 “Institutional and methodological framework and guidelines for landscape conservation approaches developed and tested in high Page 10 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) biodiversity landscapes” aimed to measure two outputs at the same time, the development and test of framework and guidelines\. Also, some indicators were not sufficiently specific and required interpretation instead of unit-based or target-based assessment, making it subjective\. Furthermore, most indicators measure outputs than outcomes\. According to the ICR, no comparators were selected during the preparation process of the Results Framework\. According to the ICR (P\. 23) the M&E design was not well-embedded institutionally\. b\. M&E Implementation According to the ICR (p\. 21) the M&E specialist was only working in the PMU for less than two years\. After 2015, the position remained empty until project closing\. Also, the PMU did not track any results or outcomes, a M&E system was not implemented, and no progress report was produced throughout project implementation\. Monitoring activities only included monitoring the achievement of annual physical and financial targets for releasing grants to Implementing Agencies\. The ICR (p\. 24) stated that the external monitoring tool, Management Effectiveness Tracking Tool (METT) was not used\. Also, no mid-term and end- term evaluations by an independent third party to assess some of the social benefits due to project activities were not conducted\. The Bank team assessed project implementation through field visit observations and conversations with project beneficiaries, implementing agency staff and other stakeholders\. According to the ICR (p\. 24) the Bank team recommended the revision of the Results Framework to assess project outcomes, however, the borrower did not agree to a project restructuring, leaving a weak Results Framework in place until project closing\. c\. M&E Utilization The ICR (p\. 24) stated that M&E was not used to inform decision making, to improve project performance, to inform investment decisions during in regards to the approvals of Annual Plans for Operations (APOs) since the Borrower did not conduct any systematic data collection\. M&E Quality Rating Negligible 10\. Other Issues a\. Safeguards The project was classified as category B and triggered the Bank’s safeguard policies OP/BP 4\.01 (Environmental Assessment), OP/BP 4\.09 (Pest Management), OP/BP 4\.10 (Indigenous People), and OP/BP 4\.36 (Forests)\. According to the ICR (paragraph 53) the project complied with all safeguard policies\. According to the PAD (p\. 19) An Environmental and Social Monitoring Framework (ESMF) and consultative framework was to ensure that environmental and social assessment and management and mitigation Page 11 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) processes were to be incorporated into the entire landscape planning and management process from the village, landscape, state, and national levels\. The Bank team (November 20, 2018) stated that given that the funded activities were small scale and geographically spread, the environmental and social risks were modest, and there were adequate provisions to address any potential impact\. Each landscape society appointed a qualified ecologist and livelihood specialist, in addition to a few social mobilizers who monitored the investments and project activities\. Other than site selection criteria for constructing small infrastructure, such as water trough for animals, minor connecting paths, etc\. no major mitigation action was required to be undertaken\. The project ensured good participation and social inclusion of women and other vulnerable communities\. b\. Fiduciary Compliance Procurement: According to the ICR (paragraph 44) the project experienced implementation challenges due to low fiduciary capacity\. The project included a large amount of small value procurement activities across four landscapes and three field learning centers, putting a lot of pressure on the limited capacity of the PMU\. The ICR also stated that the project experienced frequent changes of procurement focal points in the implementing agencies, inconsistencies in the use of standard bidding documents, poor record keeping, late payments to contractors/vendors, and slow administrative decision making, all resulting in implementation delays\. According to the ICR (paragraph 53) the project complied with the Bank’s legal covenant\. Financial Management: Due to low financial management capacity, the project faced several challenges\. According to the ICR (paragraph 44) Interim Unaudited Financial Reports and annual audit reports were generally submitted late\. With the exception of one year the Ministry of Environment, Forest, and Climate Change did not have an internal auditor which resulted in poor financial management oversight\. According to the ICR (paragraph 55) the Bank team conducted trainings to build fiduciary capacity\. The Bank team (November 20, 2018) stated that in general, no significant qualifications were given by the external auditors\. The external audits at the landscape level were mostly in time\. However, audits of the central ministry and that of the Wildlife Institute of India were generally delayed\. Overall the delay happened as the central ministry had to consolidate the audit reports from all the implementing agencies\. c\. Unintended impacts (Positive or Negative) --- d\. Other --- Page 12 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) 11\. Ratings Reason for Ratings ICR IEG Disagreements/Comment Moderately Moderately Outcome --- Unsatisfactory Unsatisfactory Moderately Moderately Bank Performance --- Unsatisfactory Unsatisfactory Quality of M&E Negligible Negligible --- Quality of ICR Substantial --- 12\. Lessons The ICR (p\. 27-28) provided several lessons learned which were adapted by IEG: • Bank teams working with entities at different institutional levels in a pilot project need to identify a strong champion at each entity to ensure ownership for implementation\. In case of weak leadership, it is critical to analyze institutional mandates and technical and administrative capacities to ensure successful project implementation\. This project lacked ownership and commitment by the Project Implementation Unit (PMU) and Implementing Agencies resulting in weak implementation and significant delays\. It needed a restructuring\. • Sound data derived from benefit assessments and impact analysis is critical for providing evidence to guide policy decisions on biodiversity conservation\. In this project, the positive results of beneficiary engagement and the prospect of potential gains for the communities made the government of Gujarat decide to replicate the project out of its own budget\. • In a landscape conservation project with a vision for outcomes beneficial to a wide range of stakeholders, building partnerships with stakeholders from different sectors, including particularly technical agencies, is important\. 13\. Assessment Recommended? No 14\. Comments on Quality of ICR The ICR provided a good overview of project preparation and implementation\. Also, the ICR was candid, internally consistent, and concise\. A shortcoming of the ICR is that it did not provide sufficient information on Page 13 of 14 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review IN: Biodiver Cons & Rural Livelihoods (P088520) how the triggered safeguard policies were managed or mitigated\. More information about the issue of the Bank proposed, but never agreed, restructuring would have filled a gap in the performance narrative\. a\. Quality of ICR Rating Substantial Page 14 of 14
REVIEW
P069376
 ICRR 13990 Report Number : ICRR13990 IEG ICR Review Independent Evaluation Group 1\. Project Data: Date Posted : 12/12/2013 Country : India Project ID : P069376 Appraisal Actual Project Name : India - CFC US$M ): Project Costs (US$M): 83\.02 87\.48 Production Sector Closure Project (ODSIII) L/C Number : Loan /Credit (US$M): Loan/ US$M ): 83\.02 87\.48 Sector Board : Environment US$M): Cofinancing (US$M ): 0 0 Cofinanciers : N/A Board Approval Date : 06/09/2000 Closing Date : 06/30/2011 12/31/2011 Sector (s): Other industry (97%); Central government administration (2%); Banking (1%) Theme (s): Pollution management and environmental health (50% - P); Environmental policies and institutions (50% - P) Prepared by : Reviewed by : ICR Review Group : Coordinator : Richard C\. Worden Robert Mark Lacey Soniya Carvalho IEGPS1 2\. Project Objectives and Components: a\. Objectives: The Ozone Projects Trust Fund Grant Agreement (Schedule 2) stated the objective of the project as: “to assist India in implementing its Country Program for phasing-out CFC [chlorofluorocarbon] production within its territory\.â€? India’s Country Program was officially called the CFC Production Sector Phase-out Plan\. It consisted of five objectives, which were enumerated in the Memorandum and Recommendation of the World Bank’s Country Director for India to the Regional Vice President of the South Asia Region (hereafter called the “RVP Memoâ€?) on page 5 as follows: a) to meet India's obligations under the MP [Montreal Protocol] by gradually phasing-out production and consumption in a coordinated program; b) phase-out CFC production in a manner that is cost-effective for both India and the MLF [Multilateral Fund], while assuring that demands for substitutes are also met in a cost-effective manner; c) use policies and incentives to support and promote the phase-out of CFC production; d) channel MLF funds to beneficiaries through an efficient mechanism that encourages compliance with the goals of the CFC Production Sector Phase-out Plan ; and e) develop and implement monitoring, reporting and auditing mechanisms that permit India to demonstrate to the Bank and the Executive Committee of the Multilateral Fund that phase-out has been accomplished according to the plan\. b\.Were the project objectives/key associated outcome targets revised during implementation? No c\. Components: Originally, the project had two components (RVP Memo, Schedule A, p\.15; and ICR, p\.12): 1: Enterprise compensation (appraisal estimate: US$80\.0 million; actual cost: US$80\.0 million)\. This component provided grant funds as compensation payments to the four CFC producers in return for meeting the CFC annual phase-out target volumes\. 2: Technical assistance (appraisal estimate: US$2\.0 million; actual cost: US$2\.0 million)\. The United Nations Environmental Program (UNEP) was responsible for supervising this component\. The component activities consisted of: (a) staffing support for the Project Management Unit to be established by the Ministry of Environment and Forests, (b) development of an MIS for collecting and managing production data, (c) consultant services for technical support to the Project Management Unit in fulfilling its responsibilities, (d) design and implementation of public awareness programs, (e) support for research activities on substitute chemicals, (f) support for training, seminars and workshops, (g) support for research on CFC recovery and recycling, (h) technical support to the CFC producers with environmental analysis and preparation of environmental management plans, and (i) support for other governmental departments and agencies collaborating in the CFC phase-out program\. Two changes were made to the project’s structure at different times during implementation: Halon Component (appraisal estimate: US$2\.3 million; actual cost: US$2\.3 million)\. In July 2001, the Executive Committee of the Multilateral Fund decided to finance the dismantling, removal and destruction of the only two plants producing halon in India, and US$2\.3 million was added to the Grant Agreement\. The project was not formally restructured\. Instead, the OTF Grant Agreement was amended on March 10, 2003 and became effective on April 17, 2003\. Accelerated CFC Phase -out Program (ACPP, appraisal estimate: US$3\.2 million; actual cost: US$2\.1 million)\.The ACPP compensation mechanism was added to the project in November 2008 as a financial incentive to reward manufacturers for accelerating the complete phase -out of CFC production by August 2008, or 17 months ahead of the Montreal Protocol schedule \. The project was amended through a separate ‘Project Agreement’ between the Bank and Government\. However, this program did not become effective until December 21, 2011 due to manufacturers’ slow preparation of the required documents \. As a result, compensation was not paid even though the project closed six months later than originally planned \. d\. Comments on Project Cost, Financing, Borrower Contribution, and Dates: Project Cost : Actual total project cost was US$ 87\.48 million, US$1\.06 million less than the appraisal estimate plus the additional Halon Phase-Out and ACPP activities, which totalled US$ 88\.54 million\. Financing : The project was entirely funded by grants from the Multilateral Fund under the Montreal Protocol\. Borrower Contribution : There was no Government contribution apart from in -kind administrative and policy support from the Ministry of Environment and Forestry’s Ozone Cell unit\. Dates: Dates The closing date was extended once by six months until December 30, 2011 on June 20, 2011\. In January 2012, one month after the project closed, but during the standard four -month grace period, US$2\.134 million was paid as the first of two programmed disbursements under the ACPP \. However, at that time, the ExCom raised unresolved questions with the Government regarding its efforts at “production closure and dismantling â€? and “documentation on CFC stockpile destruction\.â€? When the ExCom did not receive acceptable documentation with regard to these issues, it deferred payment in April 2012 of the second (and final) disbursement of US$1\.057 million until July 2012\. When the disbursement grace period expired in July, the Bank officially closed the project without making the final disbursement of US$1\.057 million\. The Ozone Cell within the Ministry of Environment and Forests (MoEF) believed the Bank’s decision to close the project before final payment under the ACPP had been made was “unacceptable,â€? and did not acknowledge closure of the project (ICR, page 19)\. 3\. Relevance of Objectives & Design: a\. Relevance of Objectives: Substantial \. India was the world’s second largest producer of CFCs at the time of project effectiveness in 2000 with more than 20,400 tons of Ozone-depleting potential (ODP) CFCs, or nearly one-quarter (23\.7%), of total global production\. The project’s objectives were therefore relevant to reducing and then eliminating global production, export and consumption of CFCs\. However, the project’s objectives were less relevant to the Bank ’s Country Partnership Strategy (CPS) with India covering fiscal years 2009 – 2012 (when the project closed) due to the success already achieved in lowering emissions of CFCs and Halons \. in view of this success, Bank strategy now focuses more on climate change and disaster risk management \. According to the RVP Memo (para\. 25), the Bank leveraged the opportunity presented by the project to expand its interactions with Indian stakeholders in other areas of environmental concern, such as industrial safety, energy efficiency, environmental assessments, and waste management issues\. b\. Relevance of Design: High\. High The project’s goal was simply stated, and design was straightforward and relevant \. The targets for national CFC reduction were clearly defined in the Government ’s CFC Phase-Out Plan, and the ODS regulations banned the creation of new CFC facilities or the expansion of existing ones \. Supplemented by the Production Quota System, producers were given some flexibility to vary their production and trade among themselves beneath the overall quota ceiling, which was steadily lowered \. The Technical Assistance activities under Component 2 were relevant to building India’s institutional and regulatory capacity to eliminate ODSs, their export, and the future potential to re -activate their production or commercialization in the future\. Reliance on the sector expertise of the UNEP was relevant as it had a comparative advantage in terms of the legal, administrative and technical challenges of implementing Montreal Protocol projects \. The focus on developing an MIS to collect and manage production data was relevant, as provision of technical support to the Project Management Unit assisted it in fulfilling its responsibilities, including ongoing monitoring, verification, independent performance audits, and implementation of the quota system \. The design and implementation of public awareness programs and provision of training, seminars and workshops were expected to reduce demand for new ODSs, as was support for research activities on substitute chemicals and on CFC recovery and recycling \. Technical support to the CFC producers in environmental analysis and preparation of environmental management plans was expected to increase their ability to comply with applicable regulations \. Support to be provided to other governmental departments and agencies collaborating in the CFC phase -out program (e\.g\. customs and excise) was relevant as they had key roles in regulating and suppressing the illegal trade in CFCs \. Annual financial and technical audits were to be used to ascertain the participating enterprises' actual CFC production phase-out and progress toward targets agreed in the annual MLF programs, and were relevant to the development and implemention of monitoring, reporting and verification mechanisms \. In addition, the 2003 add-onHalon Component and ACPP were designed to help India meet its obligations under the Montreal Protocol\. 4\. Achievement of Objectives (Efficacy): The Government’s CFC Production Sector Phase-out Plan 1999-2010 was broken down into five specific objectives, each of which is evaluated separately: a) Meet India's obligations under the Montreal Protocol by gradually phasing-out production and consumption in a coordinated program\. Rating: High\. The project resulted in the elimination of more 22,589 metric tons of CFC production from four manufacturing plants in India and 288\.8 metric tons of halon from two plants between 2000 and mid-2008, 17 months ahead of the original target of January 1, 2010 set by the Montreal Protocol (ICR, p\. 7)\. This represented the second largest productive capacity in the world at the time the project was appraised in 1999\. Ceiling targets for CFCs were achieved during each year of the project, and were directly attributable to the project’s compensation payments to CFC production facilities \. India met its obligations under the Montreal Protocol to phase-out production and consumption of CFCs and halon by January 1, 2010\. b) Phase-out CFC production in a manner that is cost-effective for both India and the MLF, while assuring that demands for substitutes are also met in a cost-effective manner\. Rating: Substantial\. The project's cost effectiveness ratio at project closure was a weighted average of US$ 3\.58 per kilogram of ODS production eliminated\. This compares favorably to the cost of the ODS phase -out project of one CFC manufacturer in Venezuela at US$4\.45/MT and 16 plants in Malaysia at US$10\.11/MT\. There was no discussion in the ICR regarding whether the demand for CFC substitutes was accomplished in a cost-effective manner\. However, since all four CFC production facilities were ‘swing plants’ capable of producing an alternative ODS (i\.e\., HCFC-22) with no need to undergo any partial or total modification of those plants (only “cleaning of the linesâ€?), it may be reasonably assumed that the cost to transition to this alternative was relatively minor\. c) Use policies and incentives to support and promote the phase-out of CFC production\. Rating: Substantial\. The production of CFC and halon was successfully phased -out due to policies put in place by the Indian Government supported by financial incentives provided by the Multilateral Fund of the Montreal Protocol \. ODS regulations (Government Order of March 2, 2000) banned the creation of new CFC facilities or the expansion of existing ones, and established maximum production limits at both the individual plant and national aggregate levels\. This was supplemented by a Production Quota System, under which producers were given some flexibility to vary their production and trade among themselves beneath the steadily declining quota ceiling\. The Accelerated CFC Phase-Out Program (ACPP) also used financial incentives to encourage those firms to eliminate all remaining CFC production before the Montreal Protocol imposed deadline of 1 January 2010\. All production of CFCs ceased 17 months prior to this deadline in August 2008, but the extent to which this can be attributed to the ACPP is not entirely clear given that the second tranche payment of US$ 1\.06 million (out of the total program cost of US$3\.17 million) was never made to these manufacturers due to delays in providing adequate, verifiable documentation to the ExCom about CFC stockpile destruction and equipment dismantling \. d) Channel MLF funds to beneficiaries through an efficient mechanism that encourages compliance with the goals of the Sector Phase-out Plan\. Rating: Substantial\. The Industrial and Development Bank of India (IDBI) channeled compensation payments to the four CFC producers in India for which it received a one percent (1%) fee\. These payments were tied to meeting annual CFC production phased-out targets, and subject to third -party audits, thereby encouraging full compliance \. Based on previous experience with the ODS -II Project, the Bank believed that having a financial intermediary act between the Bank and the beneficiaries would minimize transaction costs and remove any perception of a conflict-of-interest in serving these two roles \. An analogous mechanism was established for the halon component and the Accelerated CFC Phase -Out Program\. The ICR noted that there were “some minor delays in fund transfers, which was mainly due to the grant being held in foreign currency in the United States, â€? (ICR, p\. 23) but that, “During the course of implementation, the beneficiaries never faced any problem with disbursement of fundsâ€? (ibid)\. e) Develop and implement monitoring, reporting and auditing mechanisms that permit India to demonstrate to the Bank and the Executive Committee of the Multilateral Fund that phase-out has been accomplished according to the plan\. Rating: Substantial\. To track India’s compliance with the annual plant -level and national aggregated CFC production ceilings established by the ExCom of the Montreal Protocol, the Project Management Unit (PMU): (i) entered into performance agreements with each of the four CFC producers, (ii) developed a Management Information System to collect and manage production data as inputs to the annual programs submitted to the Bank, (iii) monitored project implementation and reported on whether targets were being achieved, (iv) administered the CFC production quota system, and (v) enforced production phase -out policies and the ODS Regulation \. The project assisted the Directorate General for Foreign Trade to develop a reporting framework for the PMU and the Ozone Cell in the Ministry of Environment and Forests \. Importers and exporters of all controlled ODS were required to obtain licenses from the Ozone Cell before engaging in any trading activities, which were then checked by customs officers at all entry points \. These checks-and-balances increased the credibility of information generated by the project due to the triangulation of data sources and independent confirmation \. This information was reported back to the UNEP, the World Bank, and the ExCom of the MLF to document compliance with the Montreal Protocol quotas \. The Ozone Cell continues to maintain a database on the movement and consumption of controlled ODS (MDIs and HCFCs) within the country\. Monitoring of compensation payments was conducted by independent auditors, with annual disbursements of Montreal Protocol grant funds made once those audits were verified by the IDBI \. 5\. Efficiency: No economic or financial analysis was carried out for this project given the inherent difficulty of monetizing the local and global benefits of reduced ultra -violet radiation caused by CFCs and other ODS \. The implementation of India’s CFC production phase-out project was completed in a satisfactory manner with all objectives being substantially accomplished within budget and with only a six -month extension of the project required to provide incentive payments to manufacturers to accelerate the complete elimination of CFC production and destroy existing stockpiles\. The project's weighted average of US$ 3\.58 per metric ton (MT) of ODS production eliminated was less than two other comparable ODS phase -out projects in Malaysia and Venezuela \. There were frequent changes in the Project Management Unit that, at times, slowed down the implementation of project activities and its lack of adequate authority and independent financial autonomy affected its ability to function effectively and efficiently\. However, these relatively minor administrative problems did not appreciably affect the project’s ability to ultimately meet its objectives in an effective, timely, or cost -efficient manner\. Efficiency is rated Substantial \. ERR )/Financial Rate of Return (FRR) a\. If available, enter the Economic Rate of Return (ERR) FRR ) at appraisal and the re- re -estimated value at evaluation : Rate Available? Point Value Coverage/Scope* Appraisal No ICR estimate No * Refers to percent of total project cost for which ERR/FRR was calculated\. 6\. Outcome: Relevance of Objectives is assessed as substantial since the project was instrumental in helping India meet its obligations as a signatory to the Montreal Protocols while theRelevance of Design is rated high in view of the clear and logical causal chain between project inputs, activities and structure to achieving its objectives \. Efficacy in attaining the project development objectives is substantial in four cases and high in one; efficiency is rated substantial\. Overall outcome is assessed as satisfactory \. a\. Outcome Rating : Satisfactory 7\. Rationale for Risk to Development Outcome Rating: Given that all production of CFCs by the four manufacturers has been phased out, and that national policy prohibits the manufacture, import/export, or use of CFCs within India, the risk to development outcome is low \. The consumption quota system and import /export data reporting system were established to avoid illegal CFC transactions\. For example, CFC production equipment at the plants of the four producers related to solely CFC production, such as piping and day tanks, were dismantled, making it economically unattractive, as well as illegal,to resume CFC production in the future \. Since all four CFC production facilities were ‘swing plants’ capable of producing an alternative ODS (i\.e\., HCFC-22), the Ministry still has responsibility to ensure their dismantling by 2040 when the phase-out of HCFCs production takes place\. Thus, the data triangulation work between manufacturers, the Directorate General for Foreign Trade, and customs officials to develop a database and reporting system will enable officials to track HCFC elimination during its phase-out\. In addition, the two halon production plants were also dismantled during the project \. a\. Risk to Development Outcome Rating : Negligible to Low 8\. Assessment of Bank Performance: a\. Quality at entry: The preparation and appraisal of the project built upon two lessons learned from the two ODS consumption-oriented predecessor projects (ODS-I and ODS-II): first, to appoint an effective financial intermediary (FI) between the Bank and the beneficiaries to minimize transaction costs; and second, to establish performance-based disbursement tied to CFC production reduction, subject to third -party audits\. Continuity of ODS programmatic operations was ensured by enlisting the support of the Industrial Development Bank of India (IDBI) with its successful experience as a financial intermediary on previous Bank projects \. The Bank was also responsive to the Government ’s request to help design and develop the necessary policy platforms to support ODS phase-out activities, such as the ODS (Regulation) Rules (January 2000) and the Production Quota System (March 2000) as part of its appraisal\. A number of activities under the technical assistance component were also included to ensure that the necessary inputs, such as training, research, and awareness -raising materials, were provided to help develop and implement monitoring, auditing and reporting mechanisms \. at -Entry Rating : Quality -at- Satisfactory b\. Quality of supervision: The Bank conducted regular supervision missions to identify key issues during implementation and to raise concerns at the appropriate level within the Government \. The Bank provided substantive help in reaching consensus on the ACPP that the four CFC producers and the Executive Committee of the MLF agreed to in late 2007\. However, the Ozone Cell within MoEF expressed dissatisfaction with the supervisory oversight exercised by the Bank\. According to the ICR (p\. 21), “the Ozone Cell spent an inordinate amount of time questioning the Bank’s fiduciary and reporting procedures \.â€? After the last supervision mission in May 2010, the last three Bank supervision reports (ISRs) were prepared without the benefit of MoEF staff accompanying them or being allowed to speak with Ministry staff or beneficiaries \. The Bank verified the findings of the performance audits preceding compensation payments by the IDBI, reported them in the Annual Programs, and authorized the IDBI to make the payments from the MLF grant directly to the beneficiaries \. The anchor management indicated that coordination between the Bank's regional staff and anchor staff was not a problem, but the Bank's regional staff and management pointed out a number of issues caused by inadequate coordination\. Following this, the Environment Anchor team in Washington instituted new processes and placed responsibility with its own staff to improve collaboration and information flow with the Ozone Cell during implementation of the on-going ODS-IV Project\. Quality of Supervision Rating : Moderately Satisfactory Overall Bank Performance Rating : Moderately Satisfactory 9\. Assessment of Borrower Performance: a\. Government Performance: The Government approved the ODS Regulation banning the creation of new CFC facilities or expansion of existing ones as well as the Production Quota System, which gave manufacturers the flexibility to trade production quota rights among themselves \. The Government had no financial requirements to meet \. On the negative side, the Ministry of the Environment and Forests decided to contest the Bank ’s right to assign project management staff or sector specialists to in -country field offices, conduct regular and independent supervision missions, follow standardized fiduciary and reporting procedures, and communicate with implementing agencies or project beneficiaries \. Following ExCom’s decision to defer approval of the final disbursement of US$1\.057 million under the ACPP beyond the project ’s four-month ‘grace period’ extension, and the Bank’s subsequent decision to officially close the project on December 31, 2011, the Ozone Cell did not acknowledged the closure of the ODS -III Project, did not communicate with the Bank project team or allow any communication between the Bank and the four ODS manufacturers \. Government Performance Rating Moderately Unsatisfactory b\. Implementing Agency Performance: The Project Management Unit (PMU) for the ODS-III Project was established in the Ozone Cell within MOEF as an independent organization (a “registered societyâ€?) with full autonomy\. This was a special legal designation created for the ODS project, but the PMU ’s terms of reference were not restricted to the project since it was intended to continue beyond the project ’s life\. However, a number of problems affected the PMU ’s ability to function effectively and efficiently, including a lack of adequate autonomy and authority (despite its theoretically independent status)\. The ICR states on page 24: “in practice, the PMU was not given financial autonomy and this resulted in the PMU’s reporting to the Ozone Cell, which was responsible for its day -to-day functioning\. This made the role of the PMU very difficult \. On the one hand, the PMU had to report to the Ozone Cell \. On the other hand, it also had to report to various multilateral and bilateral agencies \. In certain cases, the differing views between the Ozone Cell and the multilateral agencies put the PMU in a difficult situation operationally \.â€? During implementation, the Project Coordinator within the PMU played a critical role in the implementation of the project, but when he resigned in 2009 for personal reasons, the position remained vacant for the last two years of the project\. As a result, the Ozone Cell’s ability during this period to address pressing issues in a timely manner was adversely affected\. There were delays in settling the final compensation disbursement for the ACPP were exacerbated by the Ozone Cell ’s decision to forbid the Bank's project team from conducting supervision missions and from contacting its staff or the beneficiary manufacturing firms directly \. The Industrial Development Bank of India was the Financial Intermediary for the project and performed its functions well, according to all accounts \. However, there were “some minor delays in fund transfers, which was mainly due to the grant being held in foreign currency in the United States …â€? (ICR, p\. 15\.) These delays appear to have been resolved with the introduction of a more streamlined Real Time Gross Settlement system for disbursing funds in late 2005\. Implementing Agency Performance Rating : Moderately Unsatisfactory Overall Borrower Performance Rating : Moderately Unsatisfactory 10\. M&E Design, Implementation, & Utilization: a\. M&E Design: The M&E system was developed to track the disbursement of grant funds to the four CFC manufacturing companies (accounting for US $85\.3 million) and the procurement of technical assistance services \. The M&E system, operated by the staff of the PMU, also contracted consultants to provide technical services to prepare performance monitoring, verification, and reporting audits, and to track implementation of the tradable ODS quota system\. The technical assistance component was implemented by the PMU with the assistance of the UNEP, which was required to submit semi-annual progress reports on the status of those activities, with the Bank disbursing grant funds on a semi-annual basis\. There were nine monitoring indicators set up for activities undertaken under the technical assistance component, several of which had multiple elements each \. However, these defined outputs and deliverables rather than outcomes \. There were two Global Environmental Outcome Indicators : (i) to phase out CFC production completely; and (ii) establish a tradable quota system to track and monitor CFC production and commercialization \. There was one Intermediate Outcome Indicator: CFC manufacturers in compliance with production targets \. There were 22 monitoring indicators, many of which have multiple parts, specified in Annex 4 of the RVP Memo, but they were not used or mentioned in the ICR\. b\. M&E Implementation: The central mechanisms established to track disbursements were the annual performance audits, which were commissioned by the Ministry and conducted by independent auditors \. These audited results were compared to the targets agreed to in the Annual Programs at the individual plant and aggregated national levels \. Then they were cross-checked by the PMU and verified by the Bank before authorizing the IDBI to disburse annual tranches of grant funds to the four beneficiaries \. The system appears to have worked well, and the quality of data collection and analysis was consistently high, as ascertained by the ExCom of the MLF, which reviewed the annual audits \. An online project management information monitoring system was installed in the early years of project implementation, and was subsequently expanded to cover all ODS reduction activities managed by the Ozone Cell \. Producers of ODSs continue to submit quarterly production level data online, which are still reviewed by the PMU \. These data are then compiled, analyzed and submitted to the Ozone Secretariat, in compliance with India ’s continuing obligations under the Montreal Protocol \. c\. M&E Utilization: The M&E system was used to monitor reductions in CFC and halon production against MLF annual ceilings \. It was less useful in providing feedback to support the CFC production phase -out process over time\. With regard to the Technical Assistance Component, it was not possible to determine the extent to which feedback from the M&E system was used to facilitate or alter the project ’s implementation\. M&E Quality Rating : Substantial 11\. Other Issues a\. Safeguards: The project was classified as Category "B" and triggered one Bank safeguard policy -- Environmental Assessment (OP 4\.01)\. CFC producers would have been required to prepare Environmental Management Plans (EMPs) for plant modification or dismantling in case both CFC and HCFC 22 production was terminated\. However, all the CFC production facilities were swing plants capable of producing HCFC -22 in addition to CFCs\. There was hence no need to dismantle the plants as they phased out CFC production and moved to production of only HCFC -22 and metered dose inhalers (MDI), both of which are allowed until 2040\. b\. Fiduciary Compliance: There were no financial management or procurement issues during implementation, according to the ICR (p\. 16)\. This was due to the involvement of the IDBI as the project ’s financial intermediary with its broad experience in the Bank’s financial management procedures and requirements \. There were only a small number of procurement transactions under the technical assistance component \. All but US$ 2 million of the US$ 87\.5 million of final disbursements were made to CFC manufacturers as compensation for phasing out CFC production \. c\. Unintended Impacts (positive or negative): None reported \. d\. Other: Not applicable 12\. 12\. Ratings : ICR IEG Review Reason for Disagreement /Comments Outcome : Satisfactory Satisfactory Risk to Development Negligible to Low Negligible to Low Outcome : Bank Performance : Satisfactory Moderately The anchor management indicated that Satisfactory coordination between the Bank's regional staff and anchor staff was not a problem, but the Bank's regional staff and management pointed out a number of issues caused by inadequate coordination\. Borrower Performance : Satisfactory Moderately The Ozone Cell’s effectiveness was Unsatisfactory seriously undermined during the last two years of implementation, following the resignation of the Project Coordinator who was not replaced \. In addition, the opening by the Ozone Cell of a parallel channel of communication with the Bank's Environmental Anchor resulted in mixed signals\. Delays in settling the final compensation disbursement for the ACPP were exacerbated by the Ozone Cell ’s decision to prevent the Bank's project team from conducting supervision missions\. Quality of ICR : Satisfactory NOTES: NOTES - When insufficient information is provided by the Bank for IEG to arrive at a clear rating, IEG will downgrade the relevant ratings as warranted beginning July 1, 2006\. - The "Reason for Disagreement/Comments" column could cross-reference other sections of the ICR Review, as appropriate\. 13\. Lessons: The following lessons are taken from the ICR with some modifications : Advantages would stem from stronger coordination of donors by ExCom : The CFC Production Phase-out Project that was assisted by the Bank was only one part of the overall national ODS phase -out program in India; there were other ODS projects implemented with UNDP, UNIDO and GTZ support \. The ICR noted that while the Ozone Cell provided some level of coordination among these various activities, greater effectiveness could have been achieved if more formal mechanisms to coordinate and integrate them had been built into the design of the overall portfolio of ODS projects\. Given its global overview of national ODS elimination programs and projects around the world, ExCom is in a good position to identify the most appropriate donors to assist with different aspects of the issue as well as the overall level and kind of financial support that donors could or should provide to countries phasing out ODS\. Related to this point was the observation made by Bank staff interviewed by IEG that it may have been more efficient to start with efforts to stem the production of CFCs before addressing the issue of consumption , the opposite of the way it was done in the series of ODS projects in India \. There is a need for greater intra -Bank clarity and communication about the respective roles of Anchor and Regional staff : It is imperative that Regional project management staff are kept well -informed of discussions and decisions in which the Anchor is involved, whether these are with the ExCom of the MLF or the Recipient \. This would avoid the mixed messages sent in this case by the Bank to the Ozone Cell regarding the final disbursement of grant funds under the ACPP\. It is important to get the right balance between PMU autonomy and integration within the Implementing Agency : Despite the issues that arose in this case (see Section 9b above), it could still be advantageous to house the PMU within the government’s implementing agency, while at the same time endowing it with substantial authority \. However, this would require a case -by-case approach involving careful consideration of the situation on the ground\. 14\. Assessment Recommended? Yes No Why? To verify the ratings and document lessons learned \. 15\. Comments on Quality of ICR: The ICR provided sufficient factual information to assess the outcomes achieved by the project in terms of reductions in CFCs and the use of cost-effective and efficient mechanisms to create incentives to make those reductions in a timely fashion\. Many of the issues presented in the “Key Factors Affecting Implementation and Outcomes â€? and “Lessons Learnedâ€? sections were based on solid evidence and analysis, and the ratings were results -oriented rather than being overly focused on outputs \. However, the ICR could have provided more information about the project ’s M&E system, in particular why the indicators developed in the RVP ’s Memo were not fully used\. The ICR might also have been more forthcoming about the nature of a number of internal Bank communication and control issues involving the PMU and the Ozone Cell within the Ministry during the final two years of project implementation, and reflected that in rating both Bank and Borrower performance \. a\.Quality of ICR Rating : Satisfactory
REVIEW
P000437
The World Bank FOR OFFICIAL USE ONLY Report No: 21648 IMPLEMENTATION COMPLETION REPORT (IDA-2566) ON A CREDIT IN THE AMOUNT OF US$8\.91 MILLION TO THE REPUBLIC OF CAPE VERDE FOR A PUBLIC SECTOR REFORM AND CAPACITY BUILDING CREDIT JANUARY 24, 2001 This document has a restricted distribution and may be used by recipients only in the performance of their official duties\. Its contents may not otherwise be disclosed without World Bank authorization\. CURRENCY EQUIVALENTS Currency Unit = Cape Verde Escudos (CVE) US$1 = 70\.00 CVE (1/07/1994) = 116\.9175 CVE (6/30/2000) CVE 1 = US$0\.014286 (1/07/1994) = US$0\.008553 (6/30/2000) FISCAL YEAR July 1 - June 30 ABBREVIATIONS AND ACRONYMS CAS Country Assistance Strategy ERP Early Retirement Program MEC Ministry of Economic Coordination OED Operations Evaluation Department PC Project Coordinator PCM Project Components Managers PCU Project Coordination Unit PER Public Expenditure Review PPIP Pluri-Annual Public Investment Program PSR Project Status Report PSRCB Public Sector Reform and Capacity Building Project RAIMB Reform Advisory Implementation Monitoring Board TSO Technical Support Unit VDP Voluntary Departure Program Vice President: Callisto Madavo Country Manager/Director: John McIntire Sector Manager/Director: Brian Levy Task Team Leader/Task Manager: Helene Grandvoinnet FOR OFFICIAL USE ONLY REPUBLIC OF CAPE VERDE PUBLIC SECTOR REFORM AND CAPACITY BUILDING CREDIT CONTENTS Page No\. 1\. Project Data 1 2\. Principal Performance Ratings 1 3\. Assessment of Development Objective and Design, and of Quality at Entry 2 4\. Achievement of Objective and Outputs 8 5\. Major Factors Affecting Implementation and Outcome 13 6\. Sustainability 15 7\. Bank and Borrower Performance 16 8\. Lessons Learned 17 9\. Partner Comments 19 10\. Additional Information 19 Annex 1\. Key Performance Indicators/Log Frame Matrix 20 Annex 2\. Project Costs and Financing 23 Annex 3\. Economic Costs and Benefits 25 Annex 4\. Bank Inputs 26 Annex 5\. Ratings for Achievement of Objectives/Outputs of Components 28 Annex 6\. Ratngs of Bank and Borrower Performance 29 Annex 7\. List of Supporting Documents 30 This document has a restricted distribution and may be used by recipients only in the performance of their official duties\. Its contents may not be otherwise disclosed without World Bank authorization\. Project ID: P000437 Project Name: Public Sector Reform and Capacity Building Credit Team Leader\. Helene Grandvoinnet TL Unit\. AFTI2 ICR Type\. Core ICR Report Date: January 24, 2001 1\. Project Data Name: Public Sector Reform and Capacity L/C/TFNumber\. IDA-2566 Building Credit Country/Department: CAPE VERDE Region: Africa Regional Office Sector/subsector: 61 - Institutional Development KEY DATES Original Revised/Actual PCD: 03/0111993 Effeciive 05 ' 13/1994 05113i 1994 Appraisal: 03/22/1993 MTR: 10/01/1996 12/13/1996 Approval: 02/08/1994 Closing: 12/31/1998 06/30/2000 Borrower/lImplementingAgency: |GOVT OF CAPE VERDEIMIN FINANCEIMIN P\.A\. Other Partners: STAFF Current At Appraisal IVice President: Callisto Mada%o Ed%%ard V\.K\. Ja)cox Country Manager: John McIntire Katherine Marshall Sector Manager: Brian Levy Jean-Louis Sarbib Team Leader at ICR: Helene Grandvoinnet Emmanuel Mbi ICR Primary Author: Helene Grandvoinnet 2\. Principal Performance Ratings (HS=Highly Satisfactory, S=Satisfactory, U=Unsatisfactory, HL=Highly Likely, L=Likely, UN\.=Unlikely, HUN=Highly Unlikely, HU=Highly Unsatisfactory, H=High, SU=Substantial, M=Modest, N=Negligible) Outcome: S Sustainability: L Institutional Development Impact: H Bank Performance: S Borrower Performance: S _ QAG (if available) ICR Quality at Entry: S Project at Risk at Any Time: No - 2 - 3\. Assessment of Development Objective and Design, and of Quality at Entry 3\.1 Original Objective: CONTEXT: Cape Verde was the first single party state to hold pluralistic elections in the African subcontinent\. The elections, won by the opposition party, the MPD (Movement for Democracy) in 1991, gave way to an extraordinary momentum for reforms\. In September 1991, a World Bank mission assisted the government in elaborating its Country Strategy Note\. Three areas were given priority, all of which translated into the World Bank portfolio: * cutting down the state (privatization), * improving infrastructures, * creating an enabling environment for investment and private sector growth The third priority was the goal of this first Capacity Building and Public Sector Reform project\. It was designed to promote participation, through partnerships within ministries but also with civil society (for instance, the government insisted on having a component to provide training on economic issues to the media)\. The project comprised a very specific communication strategy to get all stakeholders on board, which contributed to sustaining the enthusiasm and a pluralistic approach to the challenges of reforms\. It took advantage of a momentum for changes created by the new political situation\. ORIGINAL OBJECTIVE The principal objective of the project was to support the Government's broader program to transform and modernize key public institutions, the laws supporting them, and the personnel staffing them, thereby helping sustain the overall economic and social reform program which the Government had initiated\. The project was to support improvements in economic policy analysis and management, and in legal, judicial and administrative environment for investment and for business operations through institutional development and capacity building in public administration, both at the central and municipal levels\. The government which took office in 1991 was elected on a platform of reforms and liberalization of the economy\. The objectives of the project were crucial for the Cape Verdean government, to increase effectiveness, efficiency, and transparency in public sector functions critical to the long-term success of its overall economic and social reform program\. The project's goal of assisting the government in implementing its long-term public sector institutional development strategy also fit the World Bank's strategy for the country, and complemented two ongoing initiatives, the privatization technical assistance project (Cr\. 2377-CV) and transport and infrastructure modernization (Cr\. 2466-CV)\. Finally, the project benefited from a set of cumulative opportunities: - 3 - * Strong commitment from the government, which had actively participated in the project design from the outset, had already demonstrated its capacity to pursue reforms, even when they entailed difficult measures and was fully committed to transforming the economy from a public sector dominated to one outward-looking economy\. This required fundamental shifts in policies and institutions, which the government was ready to make\. * Public support, stirred by a public information campaign on necessary changes to address a new economic and social environment\. Besides, the general public had accepted the necessity of the privatizations, which cast promising light on its acceptance of the public sector reform project, presented as a logical complement to privatization\. * Increasing support from the business community, which had a clear interest in the success of the reform, whose implementation would improve the environment for investment and reduce the time in dealing with bureaucracy and civil courts\. The project, with five main components and 16 sub-components, appears extremely complex for a first of its kind in the country\. The high number of key government agencies involved,' the geographic dispersion of the country (ten scattered islands) and the time required for managing and supervising such a project were three points that had to be taken into account to make sure the project could be satisfactorily implemented\. As shown by the good performance of the Privatization TA project at the date of the appraisal of this project, the track record of implementation of World Bank projects in Cape Verde was positive\. The objectives were clearly identified at appraisal\. Furthermore, the design of the project took into account its complexity and dealt at the outset with some of the potential difficulties that could arise\. Hence, the public sector reform and capacity building program translated the government strategy into a series of inter-connected activities, with detailed goals and outputs\. To facilitate the coordination of the different activities, which involved many actors (many government agencies, the municipalities, the judiciary and the press), the government appointed Project Component Managers (PCM) for each component or major sub-component of the project within the respective agencies, prior to negotiations\. A central project coordinator (PC) was also appointed at the Ministry of Economic Coordination (MEC)\. A coordinating unit (PCU), led by the PC based at the MEC, was set up to coordinate with the PCMs and their task forces in each of the agencies involved\. A high-level advisory Board had also been established to oversee the pace and direction of reform implementation (Reform Advisory Implementation Monitoring Board, RAIMB)\. Three risks were identified at appraisal\. The risk of resistance of the civil servants was considered low because of Cape Verdean record of adaptability to modernization, and their knowledge that they would be given choices to stay, transfer or leave\. These assumptions The Ministries of Public administration, of Internal administration, of Economic Coordination, of Finance - through the departments of Planning, Statistics, Research, Public Finance and Public assets- of Justice and Labor, of Communication\. -4 - proved correct, and there was no significant resistance to the reform from the civil service\. The second identified constraint was a limited capacity for training\. Measures were taken to strengthen the public and private capacity for training, and the ambitious program of training took place as planned\. The third identified constraint, the risk of inadequate coordination in the implementation of reforms, was mitigated as described above\. The question of capacity for implementation was another potential problem, which partly explains the delays needed to complete the objectives (end of project delayed by 18 months)\. 3\.2 -Revised Objective: There has not been any major revision of objectives, and the government commitment to the project's objectives remained firm during the whole life of the project (and beyond)\. However, the mid-term review identified the necessity to redefine the role of the Reform Advisory Implementation Monitoring Board (RAIMB)\. The role of the RAIMB in monitoring the overall reform process, supporting the government in defining the pace and direction of reforms and advising on key matters, had proved difficult to implement, given the heavy political agenda of its members\. At the mid-term review, it was decided to split the RAIMB into two boards, at a political level (meetings every 3 months) and at a technical level (monthly meetings)\. 3\.3 Original Components: a) Modernization of the Civil Service: Responsible agency: Ministry of Public Administration i) Human resources management: methodology and instruments conducive to quantitative and qualitative analysis of the present and forecast demand and supply of personnel in public administration, essential to develop comprehensive strategies and action plans, redeployment and alternative means of delivering services\. ii) Civil service training: * Technical and professional training for the staff of the Ministry of Finance, Economic Coordination, Communications, Justice, municipalities etc\. (supported under the respective components) * In several line ministries training in project management, personnel management, budget and accounting for staff managers and supervisors, in communication and computer-related skills for administrative support personnel iii) Support to the government Retrenchment Program comprising: * a voluntary departure program (VDP) aimed at reducing the number of lower- level staff by about 1600 - 5 - * an early retirement program (ERP) aimed at about 400 civil servants retraining and assistance to VDP participants to help them reintegrate into the economy\. b) Decentralization and municipal strengthening (building local capacity to participate and to manage): Responsible agency: Ministry of Internal Administration i) Institution building: * Further detailing, where necessary, of the guidelines for the decentralization process (e\.g\. revenue sharing formulae, responsibility for maintenance of certain public infrastructures, etc\. ) * Preparation and implementation of action plans for the establishment, for groups of municipalities, of inter-municipal Technical Support Offices (TSOs) * Equipment, materials and logistical support for intra-municipal deconcentration ii) Administration and Management: Technical assistance to all municipalities, * to design and implement planning, budgeting and inventory systems * to evaluate options and develop local fiscal administration and revenue mobilization capacity iii) Human Resources Development and Management: * technical assistance to qualitatively and quantitatively identify necessary staff for each municipality and to design actions to help attract and retain qualified personnel * training needs assessment for each municipality, and training\. iv) Internal organization strengthening: * assistance for the organization of the various municipal services that could eventually become autonomous services or be contracted out * provision of a minimum quantity of basic material support to each municipality\. c) Strengthening Economic Management Capacity: Responsible agencies: Ministry of Economic Coordination, Ministry of Finance (Departments of Planning, Statistics, Research, Public Finance), Ministry of Communication i) strengthening communications: - 6 - Responsible agency: Ministry of Communication * design and implementation of an electronic communication system for about 200 users * design a shared computerized information database of economic information and statistics which could be shared among ministries and government agencies * improvement in the communication of economic and social policy (strong emphasis on private and public media) ii) planning support: Responsible agency: Department of Planning * preparation of a multi-year rolling public investment program (PIP), instrument of aid coordination * establishment of a a pre-investment studies fund (PIF) * preparation of a planning manual adapted to Cape Verde's realities * \. training of the staff involved in planning and provision of equipment\. iii) National accounting and statistics system restructuring: Responsible agency: National Institute of Statistics * transformation of the General Directorate of Statistics into an autonomous institution, the National Institute of Statistics (INE), and training and provision of equipment and material to this institution * organization and gradual processing of the backlog of national accounts (accounts for 1989-1992 and possibly more), and review of the basis and methodology of national accounts including specific survey needs * development of demographic and social statistics -7 - iv) Public finance support: Responsible agency: Department of Treasury * computerization of the debt management system, and training of staff involved in this monitoring * improvement in aid coordination * carrying out a feasibility study to increase public resource mobilization (expansion of the market for treasury bills) d) Legal and judicial reform and modernization of the justice system: Responsible agency: Ministry of Justice and Labor i) Legislative reform: * Revision of the Labor code, the Commercial Code, the Registry and Notarial Legislation, and the Civil Procedural legislation * Assistance to the Directorate General of Studies, Legislation and Information (DGELDI) at the Ministry of Justice to help supervise the legislative drafting activities (training, computerization) ii) Specialization of courts: creation of a separate commercial jurisdiction within each of the regional courts, as well as separate industrial tribunals, through a pilot exercise in Praia and Mindelo\. iii) Modernization of notary and registry system (DGNRI) (computerization) iv) Judicial information strengthening, through creation of a law library at the Ministry of Justice and publication on a regular basis of a Law Review Journal by the Ministry of Justice v) Training and specialization: in particular in commercial and business law\. e) Public Procurement reform: Responsible agency: Ministry of Finance, Department of Public Assets\. * training for about 40 staff, short-term advisory services and equipment to help modernize the Public Procurement and Assets Management Department (PATRIMONIO) and selected Department of Administrative Services in the ministries * selective revision of legislation on procurement * streamlining and strengthening of institutional procedures to improve public procurement (consolidation of the regulations into one set of regulations, clarification of existing regulations and uniform application regardless source of funding, more realistic threshold for delegations of authorities) -8 - 3\.4 Revised Components: There was no revision of components during the life of the project\. 3\.5 Quality at Entry: The project's design pre-dates many of the quality control mechanisms that have since been introduced for Bank-financed operations\. However, potential risks were accurately identified at the design stage and implementation was supported by intensive, regular and frequent supervision by both the Bank and the borrower\. Consistency of the project with the CAS and government priorities\. Capacity building in public administration, both at the central and local levels, had been identified in the Country Economic Memorandum (June 1993) and in the Country assistance Strategy paper (March 1993) as the necessary keystones in the consolidation and acceleration of past and present reforms, and in the passage to a new phase of economic and social development\. Project objectives were consistent with government priorities for public sector reform, published in the Official Gazette in August 1991\. In 1994, the Government formulated specific objectives to improve and modernize public administration\. These were approved by the National Assembly, making the public sector reform one of the four pillars of the government 's Third Development Plan\. This, together with opening the country to external investment and liberalizing the economy, made the private sector the engine of growth while working towards reducing poverty and protecting the environment\. Compliance with safeguards policies: not applicable for this project\. Quality of the design\. The project was carefully designed, with detailed components and sub-components, global program targets and activities, and monitoring indicators fully covering the first three years\. Implementation and revision mechanisms were already in place at the beginning\. Risks were accurately identified, and mitigated (strengthening of the public and private capacity for training, establishment of structures of coordination of the different project components)\. 4\. Achievement of Objective and Outputs 4\.1 Outcome/achievement of objective: The project design preceded the use of the Logical Framework and systematic use of measurable indicators\. Measuring the achievement of the objectives is therefore best viewed through the list of the achievements (however, this is an imperfect measure, see Lessons for further discussion on this issue)\. -9- Overall, the project has satisfactorily met its objectives, albeit with some delays\. It has had a major impact on the debate on governance issues\. Commitment to project objectives permeated all levels of government as well as the private sector, and the project, a central piece of the strategy to reform Cape Verde, has strengthened administrative capacity and created an enabling environment for private sector development\. This is a very valuable asset for the ongoing public sector reforms\. The project also improved the country's ability to make effective use of its human and financial resources\. The following improvements have been achieved\. * Two-third of the civil servants followed training courses, depending on their fumctions and field\. This strengthening of skills was accompanied by a strengthening of the local training institution, which will allow further human resource development in the future\. * Capacity for planning and monitoring financial resources has been greatly improved, through the establishment of a National Institute of Statistics, the catch-up on national accounts backlog, and the development of modern tools for economic management (Training on the macroeconomics model RMSM-X)\. Investment can be more adequately planned and targeted through the Public Investment Program\. Furthermore, a conceptual debate has been initiated on planning, which opened the way for profound restructuring in the organization of the economy\. * Revision or drafting of legal texts contributed to a more secure environment for business, and upheld the rule of law in the country\. * This institutional development included measures to broaden participation\. Hence, the decentralization program increased the administrative capacity of the municipalities, which will benefit local government\. And training programs for the press and television encouraged a professional and independent media\. 4\.2 Outputs by components: Issues of sequencing or absence of some areas of reform are discussed in the Lessons section\. a) Modernizing the civil service: this objective can be rated as satisfactory\. The project has made progress in modernizing the civil service through; * extensive technical and computer training (see Annex 3, Government ICR)\. * a first phase of an Early Retirement Program (427 persons) * and a successful pilot for voluntary departure of civil servants (311 persons) Assessment: Training: - 10- During the course of the project, some worries were expressed regarding low attendance to some training, that have been addressed by the implementing agency through communications from the PCU to all heads of Ministry agencies to match training schedules with holidays planning and work programs\. Regarding the evaluation of the training, the January 1999 Supervision mission discussed the need for benchmarks of effectiveness, least- costs, and benefits\. An evaluation is still ongoing\. Questionnaires were designed and distributed after the completion of the training program, after the end of the project (June 2000)\. The finding of this evaluation will be incorporated in the training program for the second project\. ERP The second phase of the ERP never took off\. The number of people who benefited from the program slightly exceeded what was planned in the SAR, and the first phase was duly evaluated, but the absence of comments from the government on this evaluation in part prevented the launch of a second phase\. Besides, the impact of the program was controversial\. As the only criteria for joining was the number of years in the civil service, or the age of the civil servants, some people volunteered whose skills were essential in their respective institutions\. VDP An analysis of the VDP program was completed and published by the Secretary of State for Public Administration, and retraining of the VDP participants was completed\. The structures are in place for further departures, and have been assessed\. But completion of the Voluntary Departure Program (VDP) has been delayed due to lack of financing (a roundtable to seek donor support did not achieve results) and because of competing demands for financing investment and social programs\. However, some ministries (foreign affairs, agriculture, culture) are using the structures designed through the VDP project for streamlining their staff with their own budget-currently for a total of 109 civil servants\. Even if it was mitigated through information campaigns and interesting retrenchment packages, laying off civil servants was a difficult task, taking into account the limited capacity of the economy to create jobs (26% of unemployment in 1996)\. It was politically sensitive (the component management was actually moved to the Prime Minister's office)\. If this sub-component has met its target outcome - pilot VDP operational and assessed, as exemplified by the use of the VDP concept by line ministries, due to lack of funding, the total number of departures remains low\. Government's target in 1994 was 1600, which was in itself rather modest\. The evolution of the number of (central) civil servants is as follows: in 1985: 7800, in 1990: 11300, in 1993: 11172, in 1997: 12421\. However, the increase in the latest years is explained by an important increase in the numbers of teachers (from 2550 in 1990-91 to 4769 in 1998-99\. Improving personnel systems and services: Intensive efforts required for the VDP occurred at the disadvantage of some of the others activities which were as important for the ultimate goal of a modem civil service, if not - 11 - more in the long-term\. The project did not focus on improving personnel systems and services, such as recruitment, organizational planning and career management, described as the most critical areas to be addressed in the SAR\. A proposition from the Minister of Economic Coordination to study job descriptions, and ways to simplify task was never pursued\. b) Decentralization and municipal strengthening: this objective can be rated as satisfactory\. * New local public finance and budget framework laws were passed in 1998 to regulate fiscal decentralization and accountability\. * Capacity of the municipalities to manage social and economic programs has been strengthened with the delegation of revenue generation and financing authority, accompanied by training (2/3 of the civil servants) and transfer of key civil servants from central to municipal governments\. * Inter-municipal TSOs (Technical Support Offices) have been set up and integrate 270 civil servants covering 12 municipalities in S\. Antao, Fogo/Brava and Santiago\. Their work has been evaluated\. The difficulty of combining support for municipalities, in particular when they are located in different islands, was recognized and alternatives solutions taken\. Thereafter, Municipal Support Offices in S\. Vicente, Santa Catarina, Sal, Boa Vista, S\. Nicolau, Maio and S\. Miguel were strengthened\. * Contacts were initiated with other municipalities in the region and resulted in the growing involvement of the Canary Islands in all levels of economic activity in Cape Verde\. The launch of the RAFE (State Administrative and Financial Reform), in particular the reform to bring the public finance system in line with internationally accepted accounting standards, competed with one of the planned actions of the PSRCB project\. Ongoing actions to introduce new municipal accounting and registry, budgeting and planning systems were interrupted after the pilot phase, pending to the introduction of the RAFE\. c) Strengthening economic management capacity: this objective can be rated as highly satisfactory, given the design of the operation (see below)\. * A macroeconomics model (RMSM-X) has been installed (its usefulness for guiding fiscal and financial policies is however limited by the fact that it is based on a simple set of variables) * A management information system for Pluri-annnual Public Investment Program (PPIP) has been installed\. * The National Institute of Statistics has been established with a stronger capacity and mandate to coordinate statistical analysis across government agencies, and the national accounts have been processed (production of definitive accounts for 1989-1995 and temporary accounts for 1996 and 1997)\. - 12 - * A legal framework for planning is under preparation to integrate investment and recurrent budgets at the central and local levels\. * A debt management system using the Commonwealth Secretariat Debt reporting System (CD-DRS) was set-up\. * Economic management is now firmly governed by laws, including the law on the budget preparation process and execution, the public procurement law, the laws on domestic debt reduction and the related overseas trust fund, the emergency and economic development fund law, and the protocol regulating currency convertibility arrangements with Portugal\. The work on redefining the methodology and establishing the new base year for National Accounts suffered from systematic delays, and was not completed\. Delays were in part due to the volume of work under this component (catch-up on the backlog of accounts) that may have been underestimated at the time of appraisal\. It was also due to a change of vision in the newly-created Institute of Statistics, and a shift in the ongoing studies, to adopt 1998 and not 1994 as planned as the new base year\. This change will allow to take into account the evolution of the economy during these key years\. Assessment: The Economic management component did not target budget formulation and budget execution mechanisms, that could have usefully been incorporated up front\. In particular, enhancing accountability and transparency of the budget planning and execution processes are important elements of a reform of a public management system (see Lessons for further discussion on this issue)\. d) Legal and judicial reform and modernization of the justice system: this objective can be rated as satisfactory\. * In legal and judicial reform and in the modernization of the justice system, the PSRCBP supported the drafting of new regulations to promote private sector activities and the training of staff of the Ministry of Justice and the courts in computers and legal areas (15 magistrates were retrained in Portugal)\. * Different legislation and regulations to promote private sector activities were drafted, and are at different phases of enactment/enforcement\. (Commercial Code enacted in October 1999, Notary and Registry Code adopted 1999, project of modification of the Civil Procedural Code to be approved by the government)\. * A pilot Family and Labor Court was created\. * The law library has been improved (remodeled and equipped/book cataloguing completed), and a bi-annual Law Review established\. However, the creation of a separate commercial jurisdiction within each of the regional courts, as well as separate industrial tribunals, as planned in the SAR, did not take place\. This is explained by an ongoing debate on the viability of such specialized courts due in particular to the inherent capacity constraints of the country\. The second project will - 13 - address the issue of the creation of a Commercial Court by a pre-feasibility study, to provide a clear assessment prior to the creation of such a court\. Where there was clear and proven need for a separate court, however, this was done as planned, as for the pilot Family and Labor Court in Praia\. e) Public procurement: This objective can be rated as satisfactory\. All activities under this component were satisfactorily completed, i\.e\. the enactment of the legislation on harmonization of the procedures and guarantees of transparency, the installation of a computerized system to manage public assets, and the training of staff for the inventory of public assets\. 4\.3 Net Present Value/Economic rate of return: Not applicable for this project 4\.4 Financial rate of return: Not applicable for this project 4\.5 Institutional development impact: See 4\. S\. Major Factors Affecting Implementation and Outcome 5\.1 Factors outside the control of government or implementing agency: The legislative and municipal elections held in succession (respectively, December 1995 and January 1996) slowed down decisions, in particular those affecting the politically sensitive Voluntary Departure Program\. 5\.2 Factors generally subject to government control: During the Mid-term review, the World Bank stressed two elements subject to government control: * The RAIMB, the high-level advisory board, could have been more effective in carrying out the role assigned to it, as its operation proved difficult to materialize\. * The importance for Component managers to ensure that their staff was more involved in the execution of the project and to institute a system of back-up so that in their absence the project would not come to a standstill\. During the course of the project, many component managers were changed, which caused delays (the legal and judicial component had a succession of four component managers creating discontinuities, and a change of director at the local training institute in 1999 created delay for the VDP retraining program)\. - 14- Other elements subject to government control were reported in supervisions mission reports: * Commitment of the government to the reforms was not always translated into adequate funding\. In fact, some budget cuts negatively affected the planned course of the project (for instance a 50% cut in the 1998 operational budget of the Institute of Employment and Professional Training delayed the VDP program, and delays in providing the NIS with its full operational budget in 1998\.) * Cabinet reshuffles also created delays (for instance, reshuffle in the ministry of Justice caused a delay in the establishment of the Law Library, which was one of the reasons of the second extension of the project)\. * Implementation was in several cases delayed or even abandoned by an absence of response from the government to recommendations from the World Bank (for instance, no response to the need to appoint a local consultant for the RMSX- system, no comments on the evaluation of ERP which prevented the launching of its second phase)\. 5\.3 Factors generally subject to implementing agency control: The change of the Coordinator of the PCU (May 1995) had an initial adverse effect on the timeliness of implementation\. * Discrepancies and delays have been a cause of concern in the processing of contracts submitted to IDA by the PCU\. * The accounting system's software of the PCU took a long time to be put in place, and had to be changed during the lifetime of the project because the first version did not respond well to the requirements of the project (training for the newest accounting system took place at the beginning of 1999)\. However, project accounts were maintained manually during this time and all audit reports were unqualified\. The PCU accounting system has now been thoroughly overhauled and evaluated as satisfactory by the Africa Region s Financial Management Specialist, and the new accountant has been trained in its use\. 5\.4 Costs andfinancing: Comparison actual cost/original costs: The only major change has been the rise in the cost for the Pre-investment study component\. This is justified by the fact that this component, once its objectives had been fully understood, was well-received\. Therefore, a higher number of feasibility studies were required than had been expected (three studies were launched during the course of the project: a study on the feasibility of creating a self-funding agency for revenue defaulters, a study on the first phase of the development program of the Island of Boa Vista, and a study on the creation of the Cape Verdean Agency for Development Planning, Investigation and Research)\. - 15 - Implementation and disbursement delays: Many components were implemented with delays, which is explained by various reasons (complexity of the project, unsatisfactory reports by external consultants, budget cuts, change of managers, technology changes which rendered obsolete newly acquired technology)\. During the supervision mission of July 1998, it was therefore agreed to postpone the closing date by a year (end of 1999)\. A further 6 months extension was agreed upon at the end of 1999, for reasons beyond the control of the PCU and the PCM: internal restructuring problems in the training institute (several changes of director), government reshuffle which slowed down decision-making in the Ministry of Justice, delay in approving the PIF legal instrument due to legal complexities, and delays in using it due to inexperience of the sector ministries\. This extension allowed for the completion of all activities, and also for the continuation of the PCU which was also preparing the follow-up project\. 6\. Sustainability 6\.1 Rationale for sustainability rating: The sustainability of the reforms accomplished so far is likely\. First, reforms accomplished under this project were successful in improving the public sector capacity\. As described above, this project put in place several instruments for better governance: a macro-economic modeling management system, the structure for voluntary departure of civil servants, improvements in the press's capacity to cover economic issues, essential pieces of legislation updated and enacted, and global improvement of public sector capacity, at the central and also at the local level , through training programs and provision of necessary material support\. Second, this project was immediately followed by a Second Public Sector Reform and Capacity Building Project (Cr\. 3294-CV), whose development objectives are, given the short and longer term needs 1) to consolidate and deepen the reforms of the public sector accomplished under PSRCB in the areas of economic and financial management, regulatory and legal reforms, and 2) to prepare the next phase of public sector reforms to achieve the Government's vision of an efficient, productive, and modern public sector\. The institutional arrangements established for the implementation of the project are functioning efficiently\. The Project Coordination Unit (PCU) which operates under the Vice Prime Minister's Office, has acquired experience with project implementation, Bank procedures, financial management, and procurement and reporting requirements\. The RAIMB has been replaced by an inter-sectoral committee comprising the Vice Prime Minister as the chairman, the Minister of Finance, the PCU coordinator, the Coordinator of Economic Reforms Program, and selected representatives from the technical ministries and the private sector\. - 16- 6\.2 Transition arrangement to regular operations: The extension of the first PSRCB project to June 2000 permitted the continuation of the Project Coordination Unit (PCU) before the effectiveness and start-up phase of the second project (Cr\. 3294-CV)\. 7\. Bank and Borrower Performance Bank 7\.1 Lending: The Bank's performance was satisfactory in identification, which matched closely the government's needs and commitment to reforms, and the World Bank's strategy for the country\. It was equally satisfactory in preparation and appraisal\. 7\.2 Supervision: Supervision missions reports and annual reports show that Bank performance on supervision has been overall highly satisfactory\. The team did not change from identification to implementation\. Supervision missions were held regularly, were well documented and Project Status Reports were completed and provided realistic assessments of the project's performance\. Appropriate mix of skills was present during supervision missions, and the frequency of missions was appropriate for the support required\. A close working relationship with the PCU staff was also established\. Collaboration with other donors avoided duplication, and devolved some components to other donors (the PER for instance, was later financed by the European Union, the population census by the FNUAP)\. This translated into the reallocation of saved funds to other components\. - 17- 7\.3 Overall Bank performance: Overall, the World Bank performance has been satisfactory\. Borrower 7\.4 Preparation: The Borrower has satisfactorily participated in the preparation of the project\. Already at the preparation stage, the different ministries and agencies participated in the design of the activities for their ministry/agency\. 7\.5 Government implementation performance: The Government consistently demonstrated its commitment for the project, and provided its support for its successful implementation, but not always in a timely manner\. Some delays in the timely deposit of the counterpart funds have been noted (PSR/CPPR)\. 7\.6 Implementing Agency: The PCU performance was equally satisfactory\. The PCU also acquired strong skills that will be useful for the implementation of the second project\. 7\.7 Overall Borrower performance: Overall, the Borrower performance has been satisfactory\. 8\. Lessons Learned Finding the appropriate balance between best practices and country setting Current practices stress the benefits of starting by an initial reform of institutions to increase the likelihood of sustainable efforts in downsizing and capacity building (see OED report "Civil Service Reform: A Review of World Bank Assistance, 1999")\. However, at the outset of this project, the client's demand was clearly for immediate actions, to take advantage of the extraordinary and pluralistic momentum for changes\. Therefore, the client's way guided the approach, which proved to be successful\. Capacity has now been built, and the country is ready to move forward\. This is reflected in the goal of the second capacity building project: "to prepare the next phase of public sector reform to achieve the Government's vision of an efficient, productive, and modem public sector"\. Government commitment and partnerships fostered by communication strategy are key for success The commitment of the govermment for the project never faltered, and support from opposition parties demonstrated a national consensus on these reforms\. A specific communication strategy helped sustained support for the project\. It targeted not only potential - 18- resistance pockets (civil servants fearing retrenchment) but also beneficiaries (involvement of stakeholders in discussing new laws)\. Project's complexity is not always a problem if the project is adequately supervised and flexible in design The design of this comprehensive project was cost effective in terms of project preparation, and also justified by the size of the country\. Its complexity was not a problem for implementation, due to a heavy involvement of the world bank team (the team did not change from appraisal to completion, and fully-staffed missions were held on a regular basis) and of the counterparts\. The regularity and adequacy of the supervision mission helped find alternatives solutions when needed\. Thus adaptability and flexibility were major factors of success\. Economic management: necessity to address budget formulation and execution and to emphasize issues of transparency and accountability The Economic management component of this project comprised several capacity building activities\. However, it did not target budget formulation and budget execution mechanisms\. Though some of the essential elements of a sound public management system were improved through the project-creation of an independent institute of statistics and progress in the accounting function of the government-those missing elements might have been usefully included at the outset\. Some of these issues were picked up in 1998 by the Cape Verdean government, through a government-led RAFE - Public Finance Management Reform Program\. One of the four main objectives was described as "increase the accountability of the use of public resources by all public institutions"\. This program therefore filled in a gap in the reform of the public management system\. Those issues also received technical assistance from the World Bank through the Economic Reforms Support Operation, launched in 1997, and described as addressing the failings in the implementation of the 1993 CAS by incorporating a viable medium-term economic framework, a multi-year PIP and viable financing plan, and timely public expenditures review (see ICR, Republic of Cape Verde, Economic Reforns support Operation Credit, 2000\.) Assessment of the impact of the project Capacity building efforts must be systematically linked with monitorable performance\. If a monitoring and evaluation system is not established sufficiently early, the absence of benchmarks will undermine the evaluation of the impact of the project\. The developmental impact of capacity building such as training personnel, providing computers and other equipment, may be difficult to assess in the short-term\. The long-term impact can only be measured in terms of increased productivity, efficiency and viability of institutions over many years\. However, it is possible and necessary to monitor accuracy and quality, for instance trough benchmarks of effectiveness, least-costs, and benefits of the training\. - 19 - 9\. Partner Comments (a) Borrower/implementing agency: Extracts from the Government of Cape Verde's comments (see Fax from H\.E\. Jose Ulisses Correia e Silva, Finance Ministry, January 9th, 2001)\. Weak and strong points have been jointly identified during the ICR mission\. Among the strong points, it was noted that: the Cape Verdian reality was rightly assessed and integrated in the design of the project; there has been a permanent support for the project at all levels (World Bank, Government, Beneficiaries); an adequate supervision allowed to introduce flexibility when needed\. Two main weak points were identified: delays of implementation occurred, which underlines the necessity to reinforce coordination (essentially through the functioning of the Supervision Committee); weaknesses were noted in the definition of performance indicators\. (b) Cofinanciers: Not applicable for this project\. (c) Otherpartners (NGOs/private sector): Not applicable for this project\. 10\. Additional Information None - 20 - Annex 1\. Key Performance Indicators/Log Frame Matrix Outcome I Impact Indicators IndicatorlMatnx Projected in last PSR1 Actual/Latest Estimate Civil Service Reform: increased 1\. intensive public information 1\. the number of voluntary efficiency and effectiveness of civil campaign on the Voluntary departure reached 311, of which service\. Departure Program an estimated 95% was able to 2\. 309 civil servants participated in reintegrate the job market the early retirement program 2\. 427 civil servants participated in 3\. 3) on-going training and the early retirement program strengthening of the local 3\. career paths have been training capacity implemented and standardized 4\. an annual plan of training has been put in place, and the training program provided training to 663 civil servants (3 B training courses) Decentralization/Municipal 1\. study on an alternative solution 1\. creation and equipment of inter- Strengthening: for inter-municipal Technical municipal Technical Support (i) Better municipal operational support Offices when not Offices integrating 270 civil capabilities; and appropriate servants and covering 12 \. \. 2\. traing of the civil servants immunicipalities m S\. Antao, (ii) All municipalities are well equipped the municipalities Fogo/Brava and Santiago, to carry out their functions in a 2\. Increase in the resources directly satisfactory manner\. 2\. Inr\.ei\.h esucsdrcl managed by the municipalities (from US$ 14\.4 millions in 1992 to US$ 26\.6 millions in 1999) 3\. increase in the number of civil servants in the municipalities (from 1200 in 1993 to 2800 in 1998) 4) 383 civil servants followed training (24 training courses) Economic Management: (i) enhanced capacity of the media to Training of joumalists ongoing 12 journalists have been trained in treat economic questions whether Lisbon for 3 months, and one they are domestic or international; journalist received a grant to study in Europe for 10 months (ii) smooth flow of information among Study on the electronic mail system A network links the majority of the key personnel in the ministries, completed\. ministries, and intemet has been government agencies; introduced in many administrations\. - 21 - Indicator/Matrix Projected in bst PSRI ActuaVLatest Estimate Economic Management: (iii) efficient monitoring of reporting on Good progress in setting up the debt Implementation of the Debt debt evolution; management system and related Management System CS-DRMS in capacity building the Department of Treasury; the 103 ongoing projects have been introduced in the debt monitoring system (iv) maximized benefit from External Equipment acquired for the external Data on external aid are Aid; aid management system systematically registered and integrated into a single management system (v) better organization and regular National accounts for 1990-92 1\. Creation of the autonomous production of statistics\. produced, national accounts for National Institute of statistics 1993-1994 in preparation\. (INE) 2\. Production of definitive accounts for 1989-1995 and temporary accounts for 1996 and 1997 3) increased access to this information by users\. Legal Reform: Preliminary version of Commercial Registration of enterprises: from April code completed and publicly to September 1999, 99 private (i) reduced time necessary to constitute discussed\. Preliminary draft of Civil commercial enterprises and 46 commercial ventures; Procedural Code completed\. Law commercial enterprises established, (ii) available statistical data on library creation study completed\. from October 99 to April 2000, registered ventures; First edition of the Law Review respectively 133 and 83, and from May published\. to October, respectively 215 and 56\. (iii) reduced backlog of pending civil cases; and The time necessary to constitute \.iv) speeding up notary, property and commercial enterprises decreased -(IV) speeding Up notary, property and fo -1 ast 4huswt commercial registration procedures from 7- 15 days to 24 hours with reduced cost\. The time necessary for notary, property and commercial registration procedures went down from one week to 3 to 4 days\. Public Procurement: Legislation approved\. New Enactment of a law to harmonize the (i) modernization of legal and technical management information, procedures and guarantee the organizational mechanisms of the monitoring and control system in transparency of public procurement process of public procurement; place\. (ii) accountability for purchases; and (iii) simplification and speeding up of the bidding process\. The performance indicators in the first column were established after the mid-term review mission, to retrofit the project with the new World Bank guidelines\. The second column states the progress at the mid-term review\. - 22 - Output Indicators: Indicator/M-atrix Projected In last PSR Actua /Latest Estimate End of project The project implementation, as stated in the SAR, was carried out on the basis of annual work programs for each component and sub-component\. These programs detailed the different steps and timeframes necessary to complete each activity\. - 23 - Annex 2\. Project Costs and Financing Table A\. Project Cost by Component (in US$ million equivalent) Project Component R t ActuanLatest Percent of Estknkt\. flOS 1909 Estmate Appraisal Modernization of Civil Service 0\.71 3\.49 491\.55 Reform Decentralization & Municipal 2\.0 2\.25 112\.50 Strengthening Economic Management Support 1\.9 2\.4 126\.32 Legal Framework & Judicial Reform 1\.75 1\.41 80\.57 Public Procurement 0\.34 0\.17 50\.00 Operations & Project Implementation 0\.84 3\.03 360\.71 PPF Refinancing 0\.2 Contingencies 1\.17 Total 8\.91 12\.75 Table B\. Project Costs by Procurement Arrangement (Appraisal Estimate) (US$ million equivalent) Procurw_t Method (Appiakat Estimate) (lUS mflion) Ex_~Cd§y R [Co NCO Other N\.B\.F\. Total 1\. Training 1\.46 1\.46 2\. Retraining (Voluntary Departees) 0\.20 0\.20 3\. Advisory Services/Studies 1\.65 1\.65 4\. Good-s 3 0\.77 0\.30 _ 4\.07 5\. Operational Costs _ _ 0\.22 0\.22 6\. Public Information Campaign 0\.10 0\.10 7\. Pre-Investmnent Studies 0\.20 0\.20 8\. PPF Financing _ 0\.20 0\.20 Total Costs 3 0\.77 4\.33 8\.10 - 24 - Annex 2 (cont'd) Table C\. Project Costs by Component (ActuallLatest Estimate) (US$ million equivalent) Procurement Method (ActuallLatest Estimate) Expenditure Category (US$ Ii-on equ alent) ICB NCB Other N\.B\.F\. Total Cost 1\. Training 1\.46 1\.46 2\. Retraining (Voluntary Departees) 0\.41 0\.41 3\. Advisory Services/Studies 1\.65 1\.65 4\. Goods 3 0\.77 0\.30 4\.07 (Equipment/vehicles/fumriture) 5\. Operational costs 0\.92 0\.92 6\. Pre-Investment Studies 0\.2 0\.2 7\. PPF Refinancing _ 0\.2 0\.2 Total Costs 3 0\.77 5\.14 8\.91 Table D\. Project Financing by Component (in US$ million equivalent) Projec-t Component Appraisal Estimate ActuaULatest Percent\. ofA raisal L________________________ Bank Govt\. Bank Govt Bank Govt\. Modermization of Civil Service 0\.30 0\.41 0\.55 2\.94 183\.3 717\.07 ReforI_ Decentralization & Municipal 1\.75 0\.25 2\.12 0\.13 121\.1 52\.00 Strengthening Economic Management Support 1\.65 0\.25 2\.35 0\.00 142\.4 0\.00 Legal Framework & Judicial 1\.55 0\.20 1\.41 0\.00 91\.0 0\.00 Reformn Public Procurement 0\.26 0\.08 0\.17 0\.00 65\.4 0\.00 Operations & Project 0\.30 0\.54 1\.43 1\.60 476\.7 296\.30 Implementation PPF Refinancing 0\.20 _ _ _ _ Contigencies 0\.94 0\.23 Total 6\.95 1\.96 8\.03 4\.67 - 25 - Annex 3\. Economic Costs and Benefits Not applicable for this project\. - 26 - Annex 4\. Bank Inputs (a) Missions: No\. Of P, sn an Apvv SCazhvw cy,f Ob,,d PrmneRaf a ~cn d U, I-FMS, sa) MonthNw Count 8poh kiNWai omp-n --~~~~~~~~~~~~~~~~~rm 2N!E s Identification/Preparation 03/1993 1 Task Team Leader S S 1 Economist 1 Training Specialist 1 Procurement Specialist 1 Private Sector Specialist Environment Specialist I Financial Analyst I Lawyer 3 Consultants Appraisal/Negotiation 07/1993 1 Task Team Leader S S I Economist 1 Training Specialist 2 Private Sector Specialist 1 Lawyer 1 Capacity Bldg Specialist I Procurement Specialist Supervision 09/1993 6 Task Team Leader, Private S HS Sector Specialist, consultants 06/94 5 Task Team Leader, Economist, HS HS Operations Analyst, Operations Officer, Res\. Representative, Consultant 11/94 4 Task Team Leader, Economist, HS HS Training Specialist, Operations Analyst 02/95 4 Task Team Leader, Economist, HS HS Training Specialist, Operations Analyst 10/95 5 Task Team Leader, Economist, HS HS Training Specialist, Projects Officer, Operations Analyst 06/96 2 Task Team Leader, Projects Officer S\. HS - 27 - Stageof Prject ycleNo\. of Permons and Specialty PromneRtn Stage of ProJect Cycle (e\.g\. 2 Economists, 1 FMS, etc\.) Prfomance Ring mplementation Development MonthNYear Count Specialty Progress Objective Mid-term Review 11196 7 Task Team Leader, Economist, S HS Projects Officer, Operations Analyst, Training Specialist, Operations Officer, Task Team Assistant 06/97 3 Task Team Leader, Projects S HS Officer, Task Team Assistant Annual Review & SPN 12/97 3 Task Team Leader, Projects S HS Officer, Task Team Assistant 06/98 3 Task Team Leader, Projects S HS Officer, Task Team Assistant Annual Review & SPN 11/98 2 Training Specialist, Projects S HS Officer 05/99 4 Economist, Training Specialist, S HS Projects Officer, Financial Management Specialist, Program Assistant Annual Review & SPN 11/99 2 Projects Officer, Program S HS Assistant 05/00 3 Projects Officer, Financial S HS Management Specialist, Program Assistant ICR 3 Task Team Leader, S HS Consultant, Program Assistant (b) Staff Stage of Project Cycle No\. ActualJLatest Estimate \._Stage_of_Project_Cycle No\. Staff weeks USS (,000) Identification/Preparation 43\.0 85\.0 Appraisal/Negotiation 27\.3 91\.8 Supervision 145\.9 555\.0 ICR 0 Total 216\.2 731\.8 - 28 - Annex 5\. Ratings for Achievement of Objectives/Outputs of Components (H=High, SU=Substantial, M=Modest, N=Negligible, NA=-Not Applicable) Rating Macro Policies SU Sector Policies SU Physical NA Financial SU Insitutional Development SU Environmental NA Social Poverty Reduction NA Gender NA Other (Please specify) NA Private Sector Development SU Public Sector Management SU Other (Please specify) NA - 29 - Annex 6\. Ratings of Bank and Borrower Performance (HS=Highly Satisfactory, S=Satisfactory, U=Unsatisfactory, HU=Highly Unsatisfactory) 6\.1 Bank performance Rating Lending S Supervision S Overall S 6\.2 Borrowerperformance Rating Preparation S Government implementation performance S Implementation agency performance S Overall S - 30 - Annex 7\. List of Supporting Documents Staff Appraisal Report (January 7, 1994) Mid-term review Project Status Report Final Mission Project Status Report Back-to-office report and Aide Memoire of the ICR mission Government of Cape Verde's ICR
REVIEW
P094146
 ICRR 12923 Report Number : ICRR12923 IEG ICR Review Independent Evaluation Group 1\. Project Data: Date Posted : 07/08/2008 PROJ ID : P094146 Appraisal Actual Project Name : NCO - Second US$M ): Project Costs (US$M): 100\.0 0\.0 Broad-based Growth Development Policy Loan Country : El Salvador Loan/ Loan /Credit (US$M ): US$M): 100\.0 0\.0 Sector Board : EP US$M ): Cofinancing (US$M): Sector (s): Central government administration (45%) General industry and trade sector (30%) General finance sector (20%) Capital markets (5%) Theme (s): Regulation and competition policy (29% - P) Public expenditure financial management and procurement (29% - P) Legal institutions for a market economy (14% - S) Tax policy and administration (14% - S) Export development and competitiveness (14% - S) L/C Number : L7348 Board Approval Date : 12/13/2005 Partners involved : Closing Date : 06/13/2007 06/13/2007 Evaluator : Panel Reviewer : Group Manager : Group : Fareed M\. A\. Hassan Ismail Arslan Ali Khadr IEGCR 2\. Project Objectives and Components: a\. Objectives: The operation was the second in a programmatic series of Development Policy Loans (DPLs) intended to support the Government's medium term development strategy to : (i) reignite growth mainly by promoting trade expansion and improving business climate; (ii) reinforce macroeconomic stability and fiscal sustainability by increasing tax revenues and reducing government debt; and (iii) improve public sector management by implementing policy reforms including e-government and procurement\. The DPL II was expected to build on the first operation and focus on further deepening fiscal reform and on strengthening the international trade and businesses environment \. However, the DPL II did not become effective and was cancelled \. As such this ICR Review also examines the overall DPL program and a summary of the ratings is given in Section 11\. b\.Were the project objectives/key associated outcome targets revised during implementation? No c\. Components (or Key Conditions in the case of DPLs, as appropriate): The DPL II contains the following actions /reforms\. (i) Actions aimed at reigniting growth include : Ratification of the US\. Central America-Dominican Republic Free Trade Agreement (DR-CAFTA)\. Approval of a new Consumer Protection Law \. Presentation of a national law for securitization \. (ii) Reforms supporting macroeconomic stability and fiscal consolidation include : Approval of a fiscal reform to increase excise taxes \. Formulation of 2006 budget consistent with medium term fiscal targets (i\.e\. consistent with Non-financial Public Sector (NFPS) deficit target of 2\.3% of GDP)\. Issuance of new rules on loan classification and provisioning for financial institutions consistent with international best practice\. (iii) Actions supporting public sector management include : Issuance of new procurement regulations \. Measures to implement the e-government strategy, including the launch of the payments portal \. Finalization of the project for internal control systems regulation by the Ministry of Finance \. While all of the above mentioned measures were met, a few number of regulations awaited the approval of the National Assembly of El Salvador, including the Financial Supervision Law and the Mutual Funds Law \. d\. Comments on Project Cost, Financing, Borrower Contribution, and Dates: The DPL II was approved by the Bank's Board on December 13, 2005, and was to be made effective within 18 months of Board approval\. El Salvador's approval process for foreign loans requires two steps : (i) "approval" of the loan occurs prior to Government signing of the loan agreement and requires a simple majority in the National Assembly (50% plus 1); (ii) "ratification" of the loan occurs after signing but prior to loan effectiveness, and requires a two-thirds majority in the National Assembly \. In the case of the DPL II, the first step was achieved but the second step was not\. After the mid-term congressional election in March 2006, political polarization increased rapidly \. The main opposition party exercised its veto power over decisions requiring a two -thirds majority, adversely affecting the ratification of the loan\. As a result, the Bank terminated the Loan Agreement as of June 13, 2007 after reaching the 18-month effectiveness deadline \. 3\. Relevance of Objectives & Design: The objectives of this operation and of the overall program were relevant\. They were consistent with government requests for assistance in supporting key reforms, and with the Bank's Country Assistance Strategy (CAS) covering the FY05-08 period\. The operation intended to support the CAS pillars of broad - based growth; macroeconomic stability and fiscal consolidation; and public sector management and governance \. The DPLs were the backbone of the CAS base case scenario \. Of the US$485 million base case CAS lending envelope, US$ 300 million were envisioned for a series of three DPLs, each amounting to US$ 100 million\. The DPL II was a high-risk operation because of the unstable domestic political environment as well as other external and fiscal risks\. However, these risks had been identified in the project documents and mitigating strategies had been included\. 4\. Achievement of Objectives (Efficacy): The DPL II did not become effective \. 5\. Efficiency (not applicable to DPLs): ERR )/Financial Rate of Return (FRR) a\. If available, enter the Economic Rate of Return (ERR) FRR ) at appraisal and the re- re -estimated value at evaluation : Rate Available? Point Value Coverage/Scope* Appraisal % % ICR estimate % % * Refers to percent of total project cost for which ERR/FRR was calculated\. 6\. Outcome: Outcome is not rated for projects which do not become effective \. a\. Outcome Rating : Not Rated 7\. Rationale for Risk to Development Outcome Rating: Rated non-evaluable because the operation did not reach effectiveness \. a\. Risk to Development Outcome Rating : Non-evaluable 8\. Assessment of Bank Performance: The Bank prepared the project in close collaboration with the government, and quality at entry was satisfactory \. The operation drew on a number of analytical work, including the CEM, the PER, and the Investment Climate Assessment\. The risks of delayed effectiveness and division in the National Assembly were recognized, but underestimated \. The Bank attempted to mitigate these risks through pro -active communication with members of the relevant committees in the National Assembly, and with other stakeholders \. The Bank provided technical information to make the case for ratification of the loan, including estimates of the loan's impact on achieving and accelerating El Salvador's poverty reduction goals \. Top Bank management missions visited El Salvador to make the case for loan ratification, including the Regional Vice President and the Country Director \. However, the risks of political polarization and lack of consensus in the National Assembly were underestimated by the Bank, and in the end the efforts of Bank management to make a convincing case for ratification failed \. Despite the cancellation of the loan, the Bank has continued its engagement via non -lending technical assistance to pursue reforms (e\.g\. the Bank supported the Government with a PHRD technical assistant grant )\. Furthermore, the Bank adjusted its engagement strategy by leveraging non -lending, minimizing lending targets, mobilizing grant funds, and strengthening partnership /collaboration ( see 2008 CAS Progress Report)\. at -Entry :Satisfactory a\. Ensuring Quality -at- b\. Quality of Supervision :Not Applicable c\. Overall Bank Performance :Satisfactory 9\. Assessment of Borrower Performance: The Government was not able to secure ratification of the loan \. Political polarization seriously limited Government's capacity to reach consensus, despite negotiations \. The main opposition party, Farabundo Marti National Liberation Font (FMLN), with 38 percent of Congress, exercised its veto power affecting five Bank loans (including the DPL II), as well as other multilateral loans from Inter American Development Bank (IADB), International Fund for Agricultural Development (IFAD) and Central American Bank for Economic Integration (CABEI) for a total of US$500 million in cancelled multilateral loans\. However, the Government mobilization of alternative funding sources that did not require approval of a qualified majority in Congress are positive developments \. For example, the Government issued local bonds through the recently created Pension Trust to replace DPL borrowing, and bilateral grants were raised to fund social programs, though the sustainability of bilateral grants is unclear \. a\. Government Performance :Moderately Satisfactory b\. Implementing Agency Performance :Not Applicable c\. Overall Borrower Performance :Moderately Satisfactory 10\. M&E Design, Implementation, & Utilization: The project documents show that M&E arrangements were put in place \. Since the project was not implemented, the M&E was not utilized\. a\. M&E Quality Rating : Non-evaluable 11\. Other Issues (Safeguards, Fiduciary, Unintended Positive and Negative Impacts): The following is a summary of the ratings for all two programmatic loans (DPL I and the cancelled II )\. DPL II)\. Ratings ICR IEG Review Reason for Disagreement /Comments Outcome : DPL I Satisfactory Satisfactory DPL II Not Rated Not Rated Not rated because the operation did not become effective\. The NCO rating is "not applicable\." Risk to Development Outcome : DPL I Moderate Moderate DPL II Non-evaluable Non-evaluable Non-evaluable because the operation did not become effective\. The NCO rating is "not applicable\." Bank Performance : DPL I Highly Satisfactory Highly Satisfactory DPL II Satisfactory Satisfactory Borrower Performance : DPL I Satisfactory Satisfactory DPL II Moderately Moderately Satisfactory Satisfactory ICR Quality : DPL I Satisfactory DPL II Satisfactory 12\. 12\. Ratings : ICR IEG Review Reason for Disagreement /Comments Outcome : Not Rated Not Rated Not rated because the operation did not become effective\. The NCO rating is "not applicable\." Risk to Development Non-evaluable Non-evaluable Non-evaluable because the operation Outcome : did not became effective\. The NCO rating is "not applicable\." Bank Performance : Satisfactory Satisfactory Borrower Performance : Moderately Moderately Satisfactory Satisfactory Quality of ICR : Satisfactory NOTES: NOTES - When insufficient information is provided by the Bank for IEG to arrive at a clear rating, IEG will downgrade the relevant ratings as warranted beginning July 1, 2006\. - The "Reason for Disagreement/Comments" column could cross-reference other sections of the ICR Review, as appropriate \. 13\. Lessons: The Note on Cancelled Operation contains numerous lessons, including : During project preparation, the Bank consultation process needs to be extended beyond the executive branch of government in order to engage with the country's legislative branch and other stakeholders \. Information, education and communication strategies are key risk mitigation components in highly politicized environment\. Project management in volatile political environments requires Bank staff to have skills in negotiation, conflict resolution, and alliance building \. The changing socioeconomic environment in many Latin American countries requires the Bank to define a strategy to work with clients throughout the political and ideological spectrum, as well as the appropriate mix of lending and non-lending assistance\. 14\. Assessment Recommended? Yes No 15\. Comments on Quality of ICR: The Note on Cancelled Operation (NCO) is of good quality, providing a complete and frank explanation of the reasons for loan cancellation, and a balanced assessment of Bank and Borrower Performance \. The lessons learned section covers broader strategic issues for the Bank with respect to the mix of lending and non -lending services, particularly in the Latin America Region \. a\.Quality of ICR Rating : Satisfactory
REVIEW
P062991
Document of The World Bank FOR OFFICIAL USE ONLY Report No: 22619 IMPLEMENTATION COMPLETION REPORT (SCL-44050) ONA SPECIAL STRUCTURAL ADJUSTMENT LOAN IN THE AMOUNT OF US$2\.52525 BILLION TO THE ARGENTINE REPUBLIC FOR A SPECIAL STRUCTURAL ADJUSTMENT LOAN (SSAL) 07/30/2002 Argentina, Chile, Paraguay and Uruguay Country Management Unit Poverty Reduction and Economic Management Latin America and the Caribbean Region This document has a restricted distribution and may be used by recipients only in the performance of their official duties\. Its contents may not otherwise be disclosed without World Bank authorization\. CURRENCY EQUIVALENTS (Exchange Rate Effective as of July 30, 2002) Currency Unit = Argentine Peso (Arg $) Arg $3\.6 = US$ 1 FISCAL YEAR January I - December 31 ABBREVIATIONS AND ACRONYMS BHN Housing Mortgage Bank BNA Federal Bank CAS Country Assistance Strategy ESW Economic Sector Work FSAP Financial Sector Assessment Program GDP Gross Domestic Product ICR Implementation Completion Report IDB Interamerican Development Bank IFI Intemational Finance Institutions IMF International Monetary Fund INSSJP National Health Institute for Retirees IPO Initial Public Offering LIBOR London Interbank Offer Rate MERCOSUR Common Market of the South OPS Operation Policy Strategy QAG Quality Assurance Group REPO Repurchase Facility Support Loan SAL Structural Adjustment Loan SSAL Special Structural Adjustment Loan SSN Insurance Suprintendent USA United States of America VAT Value Added Tax Vice President: David de Ferranti Country Director: Myrna Alexander Sector Director: Emesto May Task Team Leader/Task Manager: Paul Levy ARGENTINA AR SPECIAL SAL (SSAL) CONTENTS Page No\. 1\. Project Data 1 2\. Principal Performance Ratings 1 3\. Assessment of Development Objective and Design, and of Quality at Entry 2 4\. Achievement of Objective and Outputs 8 5\. Major Factors Affecting Implementation and Outcome 17 6\. Sustainability 19 7\. Bank and Borrower Performance 20 8\. Lessons Learned 24 9\. Partner Comments 26 10\. Additional Information 27 Annex 1\. Key Performance Indicators/Log Frame Matrix 28 Annex 2\. Project Costs and Financing 36 Annex 3\. Economic Costs and Benefits 37 Annex 4\. Bank Inputs 38 Annex 5\. Ratings for Achievement of Objectives/Outputs of Components 40 Annex 6\. Ratings of Bank and Borrower Performance 41 Annex 7\. List of Supporting Documents 42 Project ID: P062991 |Project Name: AR SPECIAL SAL (SSAL) Team Leader: Paul Levy TL Unit: LCC7A ICR Type: Core ICR Report Date: September 19, 2002 1\. Project Data Name: AR SPECIAL SAL (SSAL) LUC/TF Number: SCL-44050 Country/Departmenit: ARGENTINA Region: Latin America and Caribbean Region Sector/stubsector: Banking (28%); Central government administration (28%); General finance sector (17%); Compulsory pension and unemployment insurance (15%); Other social services (12%) KEY DATES Original Revised/Actual PCD: 09/12/1998 Effective: 11/03/1998 Appraisal: 09/10/1998 MTR: Approval: 11/10/1998 Closing: 12/31/1999 10/31/2000 Borrower/lmplenmenting Agency: GOVERNMENT OF ARGENTINA/Agencies Other Partners: IDB & IMF STAFF Current At Appraisal Vice President: David De Ferranti Shahid Javed Burki Country Manager: Myrna L\. Alexander Myrna Alexander Sector Manager: Emesto May Guillermo Perry Team Leader at ICR: Paul Levy Paul Levy ICR Primarv Author: Desmond McCarthy; Herman J\. Nissenbaum; David Rosenblatt 2\. Principal Performance Ratings (HS=Highly Satisfactory, S=Satisfactory, U=Unsatisfactory, HL-Highly Likely, L=Likely, UN=Unlikely, HUN=Highly Unlikely, HU=Highly Unsatisfactory, H=High, SU=Substantial, M=Modest, N=Negligible) Outcome: U Susrainabilitj': UN Institutional Development Impact: M Bank Performance: S Borrower Performance: S QAG (if available) ICR Quality at Entry: HS S Project at Risk at Any Time: No 3\. Assessment of Development Objective and Design, and of Quality at Entry 3\.1 Or-iginal Objective: Background Following two decades of economic stagnation, hyperinflation in the late 1980s and a poverty rate that had reached 40 percent of the population, Argentina embarked in 1991 on a set of economic policies collectively known as the Convertibility Plan\. The name derives from the currency board arrangement that established full convertibility of the peso with dollar backing\. The currency board itself provided for fiscal discipline, since government deficits could no longer be financed by borrowing from the Central Bank\. But the Convertibility Plan encompassed much more than just this monetary arrangement\. Trade barriers were lowered, capital controls were eliminated, state enterprises were privatized, the tax agency was revitalized and government expenditure programs were refocused\. The results during the early 1990s were dramatic\. The poverty rate that had reached 40 percent in 1990 was reduced to 22 percent in 1994\. Economic growth averaged 7\.9 percent over the 1991-1994 period\. Following Mexico's devaluation in late 1994, Argentina's commitment to the Convertibility Plan was tested\. Many local and foreign investors expected the currency board to be abandoned, capital began to flee the country and, by March 1995, the banicing system was at serious risk of a systemic crisis\. Argentina's renewed commitment to the Convertibility Plan, a strong program of multilateral financial support and President Menem's reelection in 1995 all helped renew consumer and investor confidence\. The economy suffered a contraction of 2\.8 percent that year\. Nevertheless, this crisis was also an opportunity and structural reforms at the provincial level began to accelerate, as did regulatory reforms and restructuring of the financial system\. By the second quarter of 1996, the economy began to recover strongly - eventually registering growth of 5\.5 percent and 8\.1 percent during 1996 and 1997, respectively\. During the first half of 1998, growth continued at a 6 to 7 percent pace\. At the time of the Annual Meetings in 1998, Argentina was at a turning point in its recent economic development\. Growth had been restored following the 1995 crisis; however, social conditions (including poverty and unemployment rates) had not fully recovered\. The reforms of the early 1990s that had unleashed strong productivity gains needed to be supplemented by additional "second generation" reforms\. Indeed, Argentina had entered into a period of consolidating reforms, especially at the provincial level, at a more measured pace as compared to the early 1990s\. Meanwhile, the external environment had deteriorated dramatically with a reduction in international capital flows following the Asian crisis in 1997 and the Russian crises that hit in August 1998\. These shocks resulted in a decline in international commodity prices and sharp increases in risk premiums for emnerging markets\. Furthermore, there were fears of contagion with growing concerns that a crisis could unfold in neighboring Brazil - an event that did in fact occur within two months after Board approval of the SSAL\. As a result, by the second part of 1998, Argentina's economy began to slip into distress\. External capital flows dropped dramatically, jeopardizing the country's capacity to roll over its -2- debt and finance its fiscal deficit\. The latter increased as revenues began to fall during 1998 with the decline in economic activity, the trade balance and service accounts deteriorated, credit expansion slowed, employment and the stock market fell, leading to a rapid deterioration in the economy\. As one indication of the deteriorating 1998 conditions, urban poverty in Buenos Aires increased to 29\.4 percent\. The Government had been preparing for such possible shocks, and there was heightened awareness among the IFIs of the risks facing Argentina (See the Bank's CAS Progress Report, dated February 1998)\. as well as other emerging market economies\. The Government had already set up the Repurchase Facility with private banks to help the banking system face possible liquidity shocks and established a practice of accumulating substantial cash reserves, with advanced borrowings in the markets by approximately one-quarter of its annual needs\. The Government has also converted its IMF stand-by arrangement (approved in February 1998) into a US$2\.8 billion Extended Fund Facility which it had treated as precautionary and began to increase its primary surplus\. But it also recognized the need for far more help in order to avoid a deflation comparable to that of the 1995 Tequila crisis\. Typically, the Fund would have been the first one to be called upon to bolster defenses and strengthen market confidence but it was facing a potential liquidity problem because of other demands on IMF resources and the projected US$90 billion capital increase it sought had not yet been approved\. Thus, at the juncture of the September 1998 Annual Meetings, there was considerable concern that the crisis affecting emerging markets that had started in Asia in 1997, and was exacerbated by the events in Russia (as well as the failure of an important hedging financial institution in the USA), could spread uncontrollably to other countries, especially those in Latin America known to be highly dependent on international capital flows\. Argentina was one of those countries\. Moreover, the Argentine authorities had publicly indicated that the Fund's support was precautionary and that its use could be taken by the markets as a sign of weakness\. Facing these circumstances, the Bank, in collaboration with the IMF and together with the IDB, was asked by Argentina to be partners to mitigate the impact of market closure resulting from this series of external shocks, taking advantage of the new instrument-the Special Structural Adjustment loan-that was being especially designed as a key part of the Bank's arsenal in the face of global market shocks facing emerging markets\. This support package was predicated on the macroeconomic framework, with the currency board in place, agreed with the Fund as part of its series of programs\. Since the late 1980s, Argentina had almost continuously operated under a Fund-supported program and there was a history during the 1990s of the Bank setting its support for Argentina within the context of such a Fund program\. With the Convertibility plan in place, there were several sine qua non to sustain that program: one was fiscal discipline since the Government could not rely on printing money, and another was productivity increases, since it was not possible to alter relative prices in the economy other than through productivity changes\. Fiscal discipline thus had to be at the core of Argentina's macro-program and the focus of Fund support\. Given Argentina's history-with fiscal deficits that had averaged about 8 percent of GDP during the 1980s-there had been admirable progress in reducing the overall fiscal deficit even -3- though weaknesses persisted\. Only in 1993 did the public sector reach a consolidated fiscal surplus, helped considerably by privatization proceeds\. The Tequila crisis in 1995 set back fiscal performance further as the economy declined sharply and interest costs rose\. During the recovery years of 1996 and 1997, the Government continued to pursue a relatively expansionary fiscal stance-with deficits in the order of 1-2 percent, reflecting both the need to address the continuing high unemployment (in the range of 15 percent) and the structurl deficit created by the pension reform in 1994 (estimated at 1-1\.5 percent of GDP)\. By 1998, the federal fiscal deficit had been reduced to 1\.4 percent of GDP, down from 2\.2 percent in 1996, and the provincial deficit had declined to 0\.8 percent of GDP\. With an IMF program in place, further progress was thus expected in fiscal management as well as those elements of the remaining reform agenda that Argentina was facing\. This included among other things reform of labor regulations, reform of federal-provincial fiscal relations, deepening of reforms in the social sectors that had begun only a few years back, as well as entering into the new areas of governance, anti-corruption, justice, and public sector efficiency and effectiveness\. These latter actions were broadly part of the second generation reforms Argentina had yet to undertake or needed to reinforce\. Equally important were continuing reforms in the financial sector and the deepening capital market development, as an essential ingredient of sound macro-economic management and a key vulnerability in the context of the Convertibility plan\. Thus, when the full impact of the Russia crisis hit Argentina-and other emerging markets--in August 1998, the Government turned to the Bank and the IDB for extra-ordinary support\. Looking back at that period, it was clear that the overwhelming concern globally was to prevent contagion if possible and to respond favorably to those countries-other things being equal-that had been following policies that were conducive to sustainable development\. Such borrowers had to have had a solid track record on past reforms and a sustainable debt position over the medium term\. But it was also understood that such lending could entail heightened risks for the Bank and as such there were special terms and conditions, consisting of a significantly higher spread for the Bank and a much shorter amortization period\. Argentina, followed by Brazil, were the first two countries to benefit from this new kind of support from the Bank\. Original Objectives The objectives of the Special Structural Adjustment Loan (SSAL) and accompanying Special Repurchase Facility Support (Repo) Loan were clearly stated in the President's Report (paragraph 107) \. In general, the goal was to reduce Argentina's "vulnerability to extemal financial shocks" while simultaneously "increasing (Argentina's) capacity for sustainable and equitable growth\." The more specific objectives were to: (i) facilitate the reentry of Argentina to the intemational capital markets and avoid the social and economic costs of forced adjustment to the closure of market access; (ii) protect vulnerable groups during a period of high uncertainty; (iii) add to the lines of defense of the banking system against potential liquidity shocks; and (iv) continue Argentina's successful reform program in several key sectors, described in more detail in section 4\.2\. The REPO specifically was to contribute to meeting objective (iii) above\. -4 - These objectives were fully consistent with the 1997 CAS\. That document recognized that Argentina continued to be vulnerable to a reversal of capital flows and included the possibility of higher levels of lending under a shock scenario, foreshadowing the SSAL\. The February 1998 CAS Progress Report further noted the increase in risks to Argentina after the East Asia crisis and again indicated the possibility of additional support in the event of an external shock\. The Bank approved the Special Structural Adjustment Loan (SSAL) and Repurchase Facility Support Loan ("REPO") in November 1998, barely three months after the Russia crisis, in keeping with the nature of the crisis and the intended purpose of the instrument\. A recently completed Financial Sector Review, the accumulation of country knowledge built up by years of ESW and operational activities in the areas of provincial finances, labor markets and poverty analysis, and ongoing policy dialogue in health and social sectors provided a sound knowledge base for designing the reform program supported by the SSAL\. The knowledge base was critical in facilitating a rapid response to the Government's request for special assistance: the SSAL and its companion Special Repurchase Facility Support Loan were prepared, appraised and negotiated in approximately two months\. The SSAL was to provide financing to the Government during what was perceived to be a temporary disruption in international capital flows, aggravated by the Russia crisis that occurred in August 1998\. The financing by the IFIs would permit continued servicing of existing debt (that would have normally been rolled over in the international capital market) and meeting of the cash flows of the normal operation of the state during this period of temporary closure\. Argentina at the time had to meet financing needs of some US$ 1-1\.5 billion per month, and was facing particularly large debt repayments at the end of 1998 and early 1999\. Thus, timing was critical\. Moreover, support would allow the Government to focus on the remaining reform agenda during its last five quarters in office\. With key social programs protected and a set of reforms moving forward, it was expected that the social and economic impact of the intemational financial crisis could be ameliorated\. The SSAL was part of a broad intemational package\. The $2\.5 billion SSAL was designed as a three-tranche loan, originally to be drawn over an about 14-month period\. The companion $505 million "REPO" Loan was a contingent loan, intended to be drawn only if the Central Bank required additional resources mainly to meet margin calls on a repurchase agreement with commercial banks\. The IDB co-financed these two operations with its $2\.0 billion Special Structural Adjustment Program Loan and an accompanying $0\.5 billion "REPO" facility loan\. The Fund's support first comprised $2\.8 billion, approved at the start of 1998, as a precautionary package\. Over time, however, as conditions changed, the Fund's support for Argentina was later expanded to $8\.3 billion and further increased to $15\.5 billion with the approval of new Fund Stand-by Arrangements in March 2000 and January 2001\. The private sector's contribution was essentially via the participation of private banks in the REPO facility, roughly US$ 7 billion, followed later in the period with several voluntary debt swaps as part of the expanded Fund program\. Because of the program's emergency nature, the operation focused on incremental steps that would advance the on-going policy dialogue and keep the reform program on track, - 5- addressing the next measure required in a sequence of medium term reforms of considerable breadth, building on the body of knowledge in diverse sectors already accumulated on Argentina\. As outlined in the prior CASes, Argentina was seen as a country in the consolidation phase of reforms, moving at a more measured pace than in the early 1990s, and requiring more time and consensus building\. It was acknowledged that embarking on reforms in totally new areas would not have been consistent with the timing and nature of the proposed operation, nor would reforms that necessarily required considerable consensus building ex ante\. Fortunately, the Bank's years of experience in Argentina and the breadth of the Bank's activities in the country were amenable to such an approach\. (One of the differences with the other emergency type operations considered in this same period and under similar circumstances--- notably those for Korea and Thailand-did not have this same advantage, a point raised in the QAG reviews of these operations)\. Government officials interviewed report that the program represented a high degree of consensus between Bank staff and government staff in terms of priorities, realism for enactment given the time period and political schedule, as well as specific policy design\. Nevertheless, these limitations also meant that the reform package would only be partial in several instances, especially those of an institutional nature that could take years to develop and internalize fully\. Thus, many of these reforms involved complex stepwise processes, involving a combination of legislative action and institutional development\. They also built on prior experiences in the various sectors-each one moving ahead in a process that would take more time and effort to complete in its entirety\. (The inherent difficulties in these second generation reforms and the step-wise process of these reforms were highlighted in the 1997 CAS and again in the 2000 CAS)\. An example is the insurance sector\. It was apparent that future private sector development would be affected by inefficiencies in the insurance sector\. Prior to the SSAL, with the support of the Bank under a previous adjustment operation, the Government had already reduced its direct production role in the sector by privatizing the largest insurance company and closing the state-run reinsurance company\. In addition, new capital requirements and other regulatory reforms had been initiated\. However, much remained to be done and, taking advantage of the SSAL, additional measures to deepen the existing reform program were undertaken: for example, new laws for separating life and non-life businesses, strengthening of the resolution process and consumer protection norms\. In addition, the Superintendency of Insurance needed to adapt an early warning detection system for identifying firms in trouble, as well as effectively implement the new capital requirements\. This example illustrates the complexity of the process and the SSAL's role in promoting the continuation of the reform process\. It further highlights the operation's technical complexities and the political uncertainties, heightened by the short time span that the administration had to work: November 1998 to December 1999 when a new Government would take office\. All these factors escalated the operation's risks and its complexity\. Under more normal circumstances, one might have argued for a smaller, longer phased or otherwise different kind of Bank-supported effort, or even perhaps awaiting the next administration\. Programmatic lending might have been considered if the approach had been developed at that time\. However, there were compelling concerns about the possible international as well as domestic consequences of a lack of prompt multilateral intervention, in view of the difficulties which Argentina then faced, and the risks of further deterioration in the region, more notably Brazil\. These and the scale of Argentina's needs well justified the inclusion of this operation as the first of the Special Structural -6- Adjustment operations approved by the Bank and launched to help mitigate the global crisis' effects\. 3\.2 Revised Objective: N/A 3\.3 Original Conmponents: Paras\. 4\.1- 4\.2 describe the components of the project and its rating\. 3\.4 Revised Components: N/A 3\.5 Quality at Entrv: The quality at entry of this operation is judged as satisfactory\. As noted above, it responded well to the concerns at that time, reflected and was well founded in prior ESW and country knowledge, was consistent with the Bank's policies and objectives, and was highly relevant\. The problems which the operation sought to address may be summarized as those of a highly indebted country facing a liquidity constraint and\.fiscal deficit, all set in a rather complex political milieu\. In the face of these factors, the Bank appropriately selected the SSAL instrument to help Argentina deal with the problem\. The latter clearly met the criteria for SSALs: exceptional support for a client with a good track record that was facing a potential or real crisis so as to help them meet extraordinary external financing requirements\. (This was discussed in greater detail in the May 7, 2001 note to the Board on this instrument\.) The above assessment is consistent with the conclusions of the Quality Assurance Review carried out by QAG after the SSAL's approval and while it was being implemented, which the QAG panel had judged as "highly satisfactory"\. The QAG panel had also carried out a review of comparable operations in Korea, Malaysia and Russia, and the operation for Argentina was considered as superior to these other similar operations\. This panel applauded the operation's quick preparation\. It also said that its technical due diligence had been good, with which the ICR evaluation generally concurs\. In addition, the panel considered the operation's preparation to have been commendable in its selection of the relative priorities of the projected reforms and to significant aspects of country performance, which this review endorses\. Further, the loan documentation reflected precise, well formulated criteria for judging the achievement of the envisaged objectives, along with reasonable assumptions about the SSAL's inherent risks\. In assessing quality at entry for the ICR, several dimensions were tested\. The most pertinent is the range of sectors covered and the number of specific conditions addressing the concern that the breadth of the operation may have distracted from the main objectives\. An alternative might have been to select only a few sectors and reduce the number of conditions\. However, the risk of this alternative would be not to maintain momentum and perhaps lose the opportunity to advance the policy dialogue in those areas not selected\. Moreover, since the loan amount was substantial, the task team rightly felt that the loan conditions should be wide ranging and engage diverse actors in the Government's program\. In retrospect, one of the loan's advantages was to engage a broad set of actors and to have clear steps across a broad front in order to guide the administration in its final months\. This helped the authorities in ensuring that - 7 - policy makers were moving along the agreed paths and ultimately did provide continuity with the in-coming administration at the end of 1999\. Inevitably this requires judgment on how best to balance between "broad" and "specific" targets and between moving ahead a process, while searching for high impact on the short run\. This process required that the team use its understanding of the country constraints, especially political and social\. Such judgments were particularly evident in the case of the condition on labor modernization\. The long term goal was to secure a complete modernization of labor regulations; however, this has been tried in 1995 and had failed to secure congressional approval, while equivalent measures by the executive had been declared unconstitutional\. Thus the SSAL focused on only one dimension-severance payments-rather than the more contentious issues of collective bargaining\. Even the effort on converting severance payments from lump-sum to individual employee saving "unemployment" accounts was difficult\. As it developed however, by reviving the previous draft law on collective bargaining in early 2002, the new authorities were able to secure its passage\. Thus they were actually able to achieve much more than the SSAL called for\. Consequently a waiver was granted on the condition on converting severance payments\. At the same time, the team judged during preparation that it did not have sufficient understanding of some potential public sector reforms, and so decided to drop them from the loan\. In one area--judicial reform--it was clear that the Argentine counterparts were ill-prepared and their conviction to undertake genuine reform was dubious\. The second main dimension, given the eventual negative outcome of Argentina's macro-economic policies by the end of 2001 and early 2002, is whether or not the task team should have predicted such an outcome at the time the SSAL package was put together in mid- 1998 and if so, should a different package have been supported, notably one which involved Argentina's exit from the Convertibility regime\. There continue to be differing views on the causes of the crisis and if, when and how it might have been avoided\. But, there continues to be consensus that the circumstances faced in 1998 justified the kind of support provided by the Bank and the other IFIs\. The Bank's approach under the SSAL was consistent with the Concordat between the Bank and the IMF and the stance taken by the Fund on key macro-economic questions; there were no obvious early warning signs at that time; due diligence was undertaken to cross-check and to seek external opinions on the appropriate economic policy package for Argentina; and there was a viable range of policy options for Argentina to pursue that were considered to be sufficient at that time to overcome the difficulties then faced\. Indeed, some economists indicate that the current crisis could have been avoided as late as mid 2001 with the appropriate policy responses by the Argentine authorities\. While this may continue to be one of the more controversial aspects of this implementation completion report, the conclusion of this ICR is that the many intervening events-some external and some internal to Argentina-could not have been predicted at the time the SSAL was developed\. 4\. Achievement of Objective and Outputs 4\.1 Outcome/achievement of objective: The ICR considers that the SSAL's overall objectives were not met even though the specific outputs were all achieved\. It is clear, in retrospect, that the package of policy reforms - 8- supported by the SSAL were necessary but ultimately insufficient to redress the cumulative impact of the series of shocks that confronted Argentina in 1999 and 2000\. Designed for largely what were expected to be the transitory effects of an external shock stemming from Russia's devaluatiorn and default in August 1998 (akin to the Tequila crisis), the SSAL eventually was the main instrument used by the Bank to redress: (i) the devaluation of the Brazilian real in January 1999; (ii) the negative impacts of adverse campaign rhetoric by the leading presidential candidates in July 1999; (iii) the appreciation of the US dollar vis a vis the Euro; (iv) market nervousness because of Y2K towards the end of 1999; (iv) the increasingly weak executive capacity of the governing Alliance party that took over in December 1999; and (v) allegations of corruption and the resignation of the Vice President in October 2000\. All of these events occurred while general market trends deteriorated: country risk premiums for all emerging markets were rising and commodity prices fell\. As is well known, the economic, political and social situation in Argentina deteriorated dramatically during the course of 2001, after the SSAL was fully disbursed, leading to a new international support package, called the blindaje\. This time, the IMF took the lead in providing resources, eventually disbursing US$16 billion between January 2001 and September 2001, with the Bank's support concentrated on provincial reform and a new SAL of $400 million in August 2001\. There were three Ministers of Economy in quick succession in March 2001, with the final economic team resorting to increasingly risky and debilitating economic measures in an attempt to restore confidence\. Even the injection of substantial resources in September 2001, when the Repo was activated and the Bank's financing for that program disbursed along with that by the IDB and IMF, could not restore confidence in the banking system\. This ultimately led to the imposition of banking controls, a popular backlash, and the change of government in December 2001\. At the end of 2001, default was declared on Argentine public debt (except for that with the IFIs) and in early 2002 the peso was allowed to float\. In the meantime, the country continued to be in a deep recession with poverty reaching 50 percent of the population by July 2002\. A recent retrospective on Argentina suggests that the current economic crisis resulted from the interaction of the country's vulnerabilities with inadequate policy responses, the result of weak institutions and political impasse that worsened as time went by (particularly in the period following the last disbursement under the SSAL)\. The retrospective points out that while external shocks may have been the root of the problems at the end of the 1990s, Argentina-specific factors became increasingly important by the end of 2000, notably with the resignation of the Vice President in October 2000, the two resignations of the Economy Ministers in quick succession in March 2001, the resignation of the President of the Central Bank in April 2001, and other events, combined with the Government's inability to deal with the situation ultimately proved to be the downfall\. It may have been possible to avoid the crisis, or at least to reduce its costs, if the authorities had the political backing to act in a more timely and consistent fashion\. Unfortunately, the retrospective concludes that it is not likely that anyone outside of Argentina could have effectively prevented the crisis from happening\. Despite the overall outcome, a number of the SSAL's accomplishments were highly relevant\. The loan, along with the Repo, facilitated the Government's access to international capital funds for the period 1999-2000, and bolstered the banking system's defenses to deal with -9- volatile global markets until such time that poorly conceived domestic policies reversed the many hard fought reforms of the banking sector in late 2001\. The SSAL's achievements were also important from a sector perspective\. The proposed assistance was significant in keeping up the momentum of reforms that had been initiated under previous operations and were still part of the Bank's policy dialogue with Argentina, thus seeking to enable the Govenmment to remain focused on its reform agenda even while attending to pressing financing difficulties and the coming electoral campaign (with national elections held in October 1999)\. The SSAL agenda, furthermore, constituted the bridge from one administration to another, thus facilitating the transition of power at the end of 1999 and gave impetus to reforms by the new Administration\. Although the SSAL was originally conceived to be disbursed within the remaining period of the Menem administration (that is by end 1999), there were delays in realizing third tranche conditions\. Thus, when it became apparent that the new government would likely be formed by the Alliance party, the Bank sought to confirm ownership of the remaining measures with the new Administration\. This was done starting as early as September 1999 and continued into 2000 when a new CAS was prepared\. Following an extensive review of priorities, the new authorities endorsed the program and the SSAL served as a vehicle for maintaining a policy dialogue and providing the new officials with the instruments for addressing their reform priorities\. It is important to highlight that the new Administration was committed to maintaining all important facets of Argentina's economic policy framework including the exchange rate regime\. The beginning of the SSAL's implementation was auspicious and Argentina was the first emerging market to return to the international capital markets after the Russian devaluation and default\. In late February 1999, Argentina successfully transacted a 20-year billion dollar issue, despite the Brazilian devaluation in January 1999 and the continuing impact of the Russian crisis on intemational capital flows\. Access was expensive and somewhat restricted, however, in part, due to the extemal circumstances just described\. During 1999, the Argentine federal government raised nearly $12 billion (about 4 percent of GDP) in intemational capital markets\. Of this amount, the SSAL's second-tranche played a direct role in the issuing of $1\.5 billion in intemational bonds in September 1999, when $250 million of the second tranche was converted into a Policy-Based Guarantee (Report No\. P-7331-AR)\. Such market access lasted until October 2000, when country risk premiums rose once again to unsustainable levels following the resignation of the Vice-President\. On the other hand, the shock created by Brazil's devaluation had a significant negative impact on Argentina's economy\. Mercosur trade collapsed in all directions, with Mercosur countries the destination of about one-third of Argentine exports in preceding years\. While Argentina's trade balance with Brazil continued to register a surplus, both imports and exports with Brazil declined sharply (exports to Brazil fell by 28 percent and imports from Brazil fell by 21 percent in 1999)\. A similar result occurred with the smaller partners of Mercosur\. The appreciation of the dollar, weak international commodity prices and growing domestic concerns over the outcome of upcoming presidential elections added to the country's difficulties\. In this environment, an economic contraction was extremely difficult to avoid, and real GDP fell by 3\.4 percent in 1999\. -10- A decline in GDP of this magnitude imposes inevitable social consequences\. Therefore, establishing a list of effective social programs to be protected in the 1999 and 2000 budget, the SSAL helped to at least preserve key social services during the downturn\. However, the need to convince markets of progress on the fiscal front made it impossible to significantly increase social support programs during the recession\. Due to some improvements in labor market distortions, unemployment in 1999 did not rise as substantially as during the aftermath of the Tequila crisis, despite the more severe GDP contraction experienced in 1999\. The unemployment rate rose from an average of 12\.4 percent in 1998 to an average of 13\.8 percent in 1999\. While the early part of 2000 showed signs of recovery, these were not sustained and the economy continued in recession during 2000 and 2001 before collapsing in early 2002\. Social indicators have progressively worsened, necessitating a more concerted approach to income support for unemployed heads of households with children\. The continuing financial sector reform effort under the SSAL, along with the financing itself and the accompanying Special "REPO" loan probably played a significant role in the relatively strong performance of the banking system during 1999 through to mid 2001\. Despite the recession, deposits in the banking system expanded by 2\.9 percent during 1999 - continuing the re-intermediation of the economy that began with the onset of the Convertibility Plan\. Domestic credit grew by 1\.1 percent, reflecting a cautious use of the expanded deposit base\. International reserves of the financial system grew by nearly five percent\. Thus, in many respects, it is likely that the reforms supported by the SSAL and Repo, building on previous SALs and FSALS, all contributed to maintaining confidence in Argentina's banking system for a longer period than might have been expected\. It was not until early July 2001 that depositors began to withdraw their funds from the system and there were no major bank closings or disruptions to the payments system until the end of 2001, although a number of small banks were closed as part of the consolidation of the banling system that had been occurring in previous years\. The present collapse of the banking system reflects the cumulative impact of measures taken during 2001 that reversed the earlier reforms by lowering reserve requirements, capturing banking credit by the public sector, imposing deposit restrictions, and converting dollar loans and deposits to pesos at different rates in early 2002\. There were advances in certain other sectors\. In general, advances were made in rationalizing social programs, improving health sector regulation, advancing the dialogue and understanding of provincial finance reforms, and advancing regulatory reforms\. As is the case of the financial sector, some of these have now been reversed by intervening policy decisions but others continue in force\. As acknowledged at the outset, some reforms remain only partial, reflecting the incremental approach to reform adopted in several areas\. Some accomplishments consisted of the completion of reports, guidelines and plans which may or may not be pursued in the future\. Others resulted in the preparation of legislative proposals without any immediate assurances of their subsequent adoption by the Congress Details are summarized in section 4\.2 and elaborated on in Annex I\. To be sure, the SSAL involved numerous instances in which the Bank sought to push the envelope and to lay the basis for reforms in the future as part of a continuing, evolving process\. - 1 1 - Thus, in many areas the ultimate achievements may only be realized if the Bank and the Government continue to be engaged\. Given the nature of the Bank's relationship with Argentina, there is every expectation that this will be the case\. While the immediate impacts may not yet be felt, some authorities believe that the various measures-including some of those which have not so far had an obvious impact--have created a cultural change that could prove to set the stage for valuable long lasting effects\. 4\.2 Outputs by conmponents: Human Development Sector Actions The labor reform objectives sought under the SSAL were successfully achieved and went beyond the initial targets set under the SSAL\. These reforms should have long lasting impact even though implementation of the new legislation has been slow\. During loan preparation, as in past attempts at labor reform, the pervasive and rising joblessness plus strong union resistance appeared to crimp the prospects for transforming the rigid, tightly regulated labor regime, especially rectifying the way in which collective bargaining is conducted\. Thus, the Bank accepted a commitment to study possible options for creating a fully capitalized unemployment insurance scheme to replace the costly and outdated system of severance payments\. However, the new administration in 2000 set its sights on bringing about an actual, direct and more comprehensive reform and resurrected an earlier reform package that had been developed by the previous administration with the Bank's support\. This time, the measures won Congressional approval, along with legislation providing for the trimming of labor taxes and easing of restrictions on new workers\. In the process, the specific target of developing proposal for lowering severance payment costs and creating individual worker accounts-a reform that has not yet been fully debated-was substituted via a waiver with the more comprehensive reform that had previously been sought\. In mid-2001, the Labor Ministry established regulations that would lead to renegotiating the many contracts involved, according to the new, more flexible labor legislation\. Once the reform is fully implemented, these new contracts could increase labor mobility substantially, easing the re-absorption of displaced workers in the market, and boosting productivity\. In the health insurance sphere, the Government sought to extend its previous reforms for the liberalization of the market under the Health Insurance Reform Loan\. That loan had opened competition among union-run health insurers, set up a mandatory package of health services and established a health superintendency\. Building on these reforms, the SSAL called for the National Health Institute for Retirees (INSSJP) to outsource its services and improve its cost effectiveness\. While this condition was technically met, this approach suffered a legal setback\. Consequently, the new authorities recast the goal to aim at substantially expanding the number of providers and engaging them through far more transparent procurement procedures than had previously prevailed\. This was achieved\. Early on, INSSJP signed 75, mainly new, contracts covering the vast majority of eligible services\. These were initially reported to be generating savings exceeding $17 million monthly, thereby helping to reduce the Institute's serious budget deficit (although under current crisis conditions the situation appears to be worsening)\. In the process also, some beneficiaries obtained freer choices of providers\. Meanwhile, the Government verified the implementation of the new prudential and consumer protection norms set to govern beneficiary services, regulation of medical programs, marketing, etc\. Likewise, it fixed suitable standards for - 12 - the union-run carriers' public performance reporting, and triggered more open, frequent publication of the results\. These actions were constructive but much more basic improvements are needed for the development of a competitive health care market and to make the Government's program cost effective\. Three federal nutrition programs were consolidated into a single entity while steps were also taken to better target their services in order to cut duplication and overlap\. To the same end, the Government prepared new eligibility criteria for recipients of pensions granted by the legislative and executive branches in order to raise this program's efficiency and its curb abuses\. It called for their better auditing and cross-checking of beneficiaries, while also extending improved poverty measurement criteria to a new total of 14 social programs\. Several well intended proposals were introduced which could signal the directions for significant higher education system changes-but they gained little standing\. A plan was set out, with active Bank assistance, for improving the equity and efficiency of public university finance\. Its implementation could provide badly needed improvements: greater opportunities for low income students, expanded cost recovery, and stronger weight in student selection on merit and transparency\. While budget cuts have curtailed the use of this formula, it is currently being applied during 2002 as a way of rationalizing the distribution of at least some resources to public universities with the prospect for more general application over time\. In addition, the Government issued a resolution to create a national fund which would help initiate actions to these ends\. Nevertheless, these initiatives are not assured of sustained backing, and the constituency for changing education funding is not very powerful so far\. The hope is that these initiatives will lead to a broad debate on how to finance the tertiary education system more generally\. The Government also arranged for aptitude testing of all third year secondary school students and for distribution of its findings to schools, parents and the public\. The resulting data could be useful for meeting Argentina's need to demonstrate the school system's accountability for its performance to the public, as well as increasing the skilled labor supply and better aligning the system with changes in the economy\. But so far there is not a "culture" of using such standardized test results, and the ultimate use rests on the Federal authorities' success in persuading their provincial counterparts (who bear the sector responsibility) to pursue this effort more actively\. The authorities undertook several direct poverty alleviation measures in addition to the aforementioned improvements in social protection activities for better targeting and effectiveness\. The action with immediate consequences was to provide some protection of adequate spending levels for effectively targeted, high quality social programs against the 1999 budget cutbacks, and give them further support in 2000\. This broke with tradition since Argentina's social expenditure pattern has been one of declining spending on priority programs when economic activity fell and poverty increased\. The Government moreover enlarged the list of these programs agreed in the SSAL targets with added health and employment assistance\. It also put in place a better methodology for calculating " basic needs" indices and moved to apply it starting in 2000\. The authorities expanded the usage of this methodology to install proxy means testing in fourteen social programs and the same number of provinces, which should help to eliminate inappropriate beneficiaries\. These measures should likewise lend more transparency to these programs\. - 13- Financial Sector Actions After the Tequila crisis, the banking sector was strengthened through improvements mainly in regulation and supervision, together with privatization\. However, the mid-1990s' experience had also demonstrated a need for further reductions in the public banks' role in the sector\. One of the SSAL's goals accordingly called for bringing the Government's second-tier housing mortgage bank (BHN) to the point of sale to private enterprise\. In the event actually, the Government surpassed the target and sold commercial investors a controlling interest in the bank\. On the other hand, national sentiment continued to oppose the privatization of the remaining federal bank (BNA)\. It was decided therefore to only seek a more transparent accounting of BNA's financial condition\. This was obtained: BNA was comprehensively audited; its operations and guarantees were documented more openly; its accounts are published in Stock Exchange reports; and its condition is shown in BNA's "website\." These have lifted some of the "veil of secrecy" regarding the institution--but not altered its problematic status\. The current banking crisis leaves the role of the public banks unresolved and will no doubt have to be the focus of a renewed reform effort\. The SSAL assisted in enhancing the private banks' regulatory framework\. With its assistance, a new "Permanent Commission on the Evaluation of Financial Regulation" began to engage in better coordinated surveillance of, and attempts to resolve, banking system problems\. It produced recommendations on liquidity management which led to rule changes\. It also proposed changes regarding security markets and insurance from which legislative proposals were prepared\. A parallel temporary inter-agency committee reviewed bank failure and closure procedures in order to assess the adequacy of the mechanisms for resolving problems in these fields\. It produced recommendations that could improve existing laws and regulations by upgrading the legal security of assets, deposit carve-outs and transfers\. Further, the committee and a consultant examined the Central Bank's governance regulations, which they found adequate\. Also, proposals were drafted to amend the Central Bank charter so as to tighten bank licensing and other governance requirements\. These so far have not won Congressional approval for political reasons\. In complementary activity, the Government and Central Bank jointly reviewed the criteria being used for supervising public banks vis a vis private banks, as well as their enforcement\. They found these criteria compatible\. Further, the authorities submitted to the Congress proposals for protecting banking regulators and supervisors from personal liability for good faith actions\. These failed to obtain a favorable reaction, reportedly because of differences over the immunity provisions\. (This action was also politically inopportune since the Central Bank President then faced Congressional investigation, and so the proposed law appeared to be self-serving\.) This recommendation was followed up in the 2001 FSAP, jointly undertaken between the Bank and the IMF\. This proposal continues to be debated in mid-2002 for Congressional consideration\. Separately, the Central Bank established a special unit dealing with "money laundering" that reviews suspicious transactions in line with Argentina's newly revised legislation (which is consistent with the international Financial Action Task Force recommendations)\. -14 - In order to deepen the capital market, the Government won Congressional approval of new laws for facilitating the growth of leasing finance and permitting mutual fund investments outside the MERCOSUR area\. It also requested, but has not yet won comparable approval of legislation which would promote the use of secured transactions in credit contracts\. Under the SSAL as well, there was a study of the tax treatment of different financial instruments to determine whether corrective legislation was needed to achieve greater tax neutrality\. This concluded that there was not any but it found the prevailing framework unclear and inconsistent\. The Government therefore created a commission which addressed these problems and a March 2000 decree resolved issues of differential treatment of repurchase agreements versus pledges or guarantees\. These findings were followed up through an IDB operation\. Further, the Government reviewed, and then prepared an action plan to reform, the ratings industry\. This would eliminate obligatory ratings on IPOs, debt instruments and equities while lessening the Securities Commission's reviews\. Similarly, it sent the Congress high quality proposals to modernize the insurance market's framework, regulation and practices\. Neither of these efforts have so far progressed to the accomplishments desired but there already have been some commendable improvements in the insurance area\. Under the SSAL's influence, "best practice" concepts of solvency monitoring and early warning systems, along with greater attention to consumer protection concerns, are beginning to enter the industry\. Meanwhile, the Insurance Superintendency constructively tightened life insurance companies' compliance with minimum capital requirements\. And its more rigorous enforcement policies led to orders to over 40 companies to cease operations over the subsequent two years\. Intergovernmental Fiscal Sector Actions The Federal and provincial authorities reached a long sought accord in principle on revising Argentina's complex way of financing sub-national governments and revenue sharing, a significant advance\. The 1994 Constitutional Reform had called for Congressional enactment of changes in the system by the end of 1996, given the widespread appreciation of its inadequacies\. But such changes had been hard to realize, even after several rounds of difficult negotiations with the provincial governments\. Accordingly, the SSAL addressed the issues, taking into account the large sums involved (just under 6 percent of GDP in 1997) and their contribution to Argentina's public finance problems\. It called for measures to help advance the dialogue, particularly about simplifying intergovernmental transfers and changing the formula for their allocation among the provinces\. Under the program, intergovernmental proposals were prepared which would substantially change the rules and procedures governing transfers to the provinces\. Their creation plus subsequent Congressional approval of the "Federal Commitment" document affecting the system presaged important changes\. In fact, the reform proposals already influenced the adoption of a moving average provincial share of transfers for 2001-05 as part of a Federal-provincial agreement reached in November 2000\. This was considered to constitute an agreement to simplify the system and to include social security finances in the primary distribution package\. Moreover, arrangements were made for Federal-provincial negotiations on propositions for simplifying the revenue distribution formula to make it more transparent, equitable and more capable of motivating stronger provincial accountability and efficiency\. At least, these major issues are now on the table and are the basis for ongoing negotiations in the design of a new -15- federal provincial fiscal agreement\. Correspondingly, there are also proposals for decentralizing the tax system, which would provide the provinces new instruments and greater revenue-generating authority\. Infrastructure Sector Regulatory Actions The extensive restructuring of and participation of new players in infrastructure services by the late 1990s have made it necessary to rationalize the myriad changes\. This coincided with greater recognition that Argentina's high transport costs and poorly integrated modes were causing costly economic difficulties\. In response, the SSAL supported an effort to improve the institutional framework\. It supported the preparation of proposals for the creation of an integrated freight transport regulatory agency keyed to encouraging multi-modal services\. In addition, the Government designed a plan to increase the autonomy and independence of sector regulatory agencies through advancing the implementation of improvements in regulators' selections and tenure, as well as in these entities' funding sources\. A draft law previously submitted to the Congress for harmonizing regulatory standards was revised to tighten some elements but it has not yet been passed\. Meanwhile, the Attorney General sanctioned the abstention of traditional executive branch agencies from technical and economic issues in regulatory disputes, thereby fortifying regulatory entities' independence in these matters\. 4\.3 Net Present Value/Economic rate of return: N/A 4\.4 Financial rate of return: N/A 4\.5 Institutional development impact: There were constructive advances made, including some of long term importance, such as placing the housing mortgage bank under commercial management\. The consolidation of responsibilities for nutrition programs and the further strengthening of banking supervision and regulation mechanisms figure as well\. The Insurance Superintendency progressed, although it still needed to be fortified\. In general, the supervision and regulation of the financial system served as strong points during the prolonged recession/stagnation of 1999-2001\. Clearly, the bank run of late 2001 - due to macroeconomic considerations and concerns about the currency regime - along with the devaluation of 2002, led to tremendous stress on the financial system, perhaps permanently destroying some of the institutional achievements gained during SSAL implementation\. Institutional improvements could accrue from the emerging consensus with the provinces on intergovernmental finances\. The process of preparing high quality technical analysis of the reform of provincial taxes and transfers, along with the debate engaged with the provincial authorities, advanced the policy dialogue significantly\. The ideas developed and presented at that time continue to serve the basis of discussions in Argentina on this complicated and politically difficult reform\. -16- All these are judged to more than balance the unsuccessful efforts to rationalize the National Health Institute (INSSJP) and the so far unpromising development of the transport regulatory agency\. On these grounds, the SSAL's institutional development impact is rated "Modest" for the period covered during the project implementation\. Sustainability of these institutional reforms will be discussed in Section 6\. 5\. Major Factors Affecting Implementation and Outcome 5\.1 Factors outside the control of government or implementing agency: Argentina confronted severe external shocks that affected its economic performance, and the implementation of this loan\. After growing by 3\.9 percent in 1998, the economy suffered a contraction of 3\.1 percent in 1999\. A recession begun in the fourth quarter of 1998, following the Russian crisis and subsequent turbulence in international financial markets\. These financial factors initiated the recession, but then the Brazilian devaluation of early 1999 (Argentina's largest trading partner), falling commodity prices (terms of trade fell by over 10% in 1998/99), the appreciation of the US dollar vis a vis the Euro, and unfavorable weather conditions for the agricultural sector contributed to the downturn\. In the second half of 1999, uncertainty over the presidential elections further complicated the panorama\. So did the market fears about the costs and disruptions of Y2K in developing economies\. As a consequence of external developments in 1999, part of that year's second tranche release was diverted to a policy based guarantee operation, enabling the authorities to strengthen the liquidity position of the government, and facilitate the transition to the new administration\. Tracing the evolution of country risk ratings reveals the sensitivity of the markets to the impact of both external and internal events\. Argentina's country risk ratings rose sharply when first Russia and then Brazil devalued\. There was a jump again when statements were made by leading political figures about the desirability of defaulting the country's external debt in July 1999 during the presidential campaign\. These jumps reflected increases in sovereign spreads, domestic interest rates with an impact on economic activity, and Argentina's ability to access the international markets and its pattern of capital flows\. A pronounced contraction in capital flows became evident starting in 1998, which was accentuated in 2000\. The electoral campaign period and the presidential transition had a significant impact on the conduct of economic policy, and slowed the loan's implementation\. The other source of adverse real shocks was the global growth decline that started in 2000\. Various parties involved in this operation likewise affected its outcome\. For one, the SSAL's preparation and subsequent implementation benefited to a very large extent from the aforementioned earlier sizeable Bank investment in economic and sector work, as well as its intensive Government dialogue\. There was also close coordination with the IMF, especially in the development and review of the Government's program and preparation of the Loans\. The EFF in place provided an essential element for the underlying macroeconomic program, and there were frequent consultations on Argentina's conditions and prospects; The IDB participated comprehensively as well\. The two banks' loans were well coordinated during identification and preparation through joint missions, followed by continuous - 17 - dialogue in the course of implementation\. The closely parallel conditionality of the Loans and working cooperation helped keep the Government focused on the shared reform program\. The IDB made a special contribution in seeking to strengthen the quality of social services, for example in co-supervising the extension of irnproved poverty measurement methodology to additional Argentine programs\. It also aided the activity in the education sector\. 5\.2 Factors generallv subject to governnent control: The implementation of the SSAL was affected considerably by the change in the Borrower's counterparts following the late 1999 elections, impacting the pace of reforms and the disbursement of the third tranche\. The short timeframe planned for the three tranches imposed a tight schedule for complying with conditionality\. The change in Government affected the timetable of meeting the SSAL's conditions in order to give the new administration the time to intemalize and commit to the remaining reforms\. Ultimately, one waiver was granted at the time of the third tranche release concerning the labor reform condition (mentioned in section 4\.2)\. This waiver, however, was largely technical\. While the specific action was not completed, the Government secured legislative approval of a much broader labor reform than was originally established in the legal agreement\. The advent of the new administration furthermore necessitated an initial extension of the Loan's Closing Date\. The Bank worked with the new administration to take time and assess the SSAL's consistency with its own policy objectives, and to confirm its commitment to them\. This led in tum to a further delay subsequently in order to help ensure Government's compliance with all Loan conditions and the solution of some procedural problems\. In August 2000, a final extension was approved in order to enable the administration to complete the administrative processes required for submitting legislation to the Congress\. The severity of Argentina's macro problems helped to shape the outcome\. This was judged to have aided in pushing the reform agenda more forcefully than would have occurred without that impetus\. This might have contributed to the Govenmment's exceeding some SSAL targets and its especially strong support of reforms under the direct purview of the Ministry of Economy\. The fiscal situation remains a weak spot, as it did earlier when it led the Government to sponsor a Law of Fiscal Responsibility, passed in July 1999\. This law laid out the path to a balanced fiscal budget by 2003, and the creation of a "rainy day" fund\. Albeit well intended, this law never had teeth\. The Govemment did not meet the fiscal targets included under the accompanying Fund program and there was a considerable overshooting of public spending in 1999, an election year\. The lack of fiscal discipline-at a time when it was needed to generate confidence in the Government's ability to adhere to its commitments-proved to be one of the factors that affected the market's perceptions of Argentina's ability to stick to underlying tenets of the Convertibility plan\. The new government, moreover, addressed its larger than expected fiscal deficit with new taxes in early 2000, as part of the expansion of the Fund's program\. Again, while well intended, the negative impact of these measures on consumer confidence (as they mainly increased taxes on the middle class) and on the market's perception of the Government's ability to address the underlying fiscal issues more than offset the positive impact on tax revenues\. Thus, once again, the lack of a real effort to tackle Argentina's fiscal imbalances continues to drag down confidence\. -18 - By late 2000, the continuing concerns over fiscal performance were compounded by a political crisis that eventually divided the two-party alliance governing Argentina\. Economic activity, which had been largely flat during the first three quarters of the year, turned sharply negative during the fourth quarter\. Access to international capital markets became restricted, and the Government sought a new international financial package at the end of 2000\. Thus, when the SSAL had fully disbursed in September 2000, the Government soon faced an even worse crisis of confidence that ultimately led to another international support package led by the IMF\. However, despite this new much more substantial international financial package, political tensions and an unfavorable external environment contributed to continuing economic difficulties during 2001\. A greater crisis of confidence unfolded as Argentines began to withdraw deposits from banks, and capital flight followed starting in July 2001\. By the end of the year, in the midst of a full-fledged bank run, capital controls were imposed, as well as restrictions on the withdrawal of cash from banks\. President De la Rua was forced to resign, and during a period of a week, five interim Presidents passed through the Presidential palace\. 5\.3 Factors generally subject to implementing agency control: N/A 5\.4 Costs andfinancing: During the implementation of the SSAL, Government financing needs surpassed expectations due to the depth and persistence of the economic downturn\. Part of the Bank's response to this situation was to leverage the second tranche, canceling $250 million and allocating this amount to a Policy-Based Guarantee that raised about US$1\.1 billion in the capital markets in October 1999\. As noted above, the SSAL program, once disbursed, was subsequently followed by an even larger program, amounting to about US$ 40 billion, including the voluntary participation of private banks in public debt swaps\. 6\. Sustainability 6\.1 Rationale\.for sustainability rating: The events that followed the closing of the loan demonstrated that the reforms supported by the SSAL and the accompanying and subsequent Fund programs were not sufficient to sustain Argentina's economic policy framework\. Moreover, the collapse of the banking sector is a clear case of past efforts to strengthen the system being undermined\. Nevertheless, a number of specific actions from the SSAL reform program may still prove to be sustainable\. For example, the Mortgage Bank (BUN) is still in private sector hands; however, the banking system is in dire straits and suffers from a variety of governmental restrictions\. Other examples include the proposals for intergovernmental fiscal reform prepared under the SSAL, which remnain in the center of discussions between the federal government and the provinces, and will likely have its impact when a new revenue sharing agreement will need to be approved by the end of 2002\. Some of the health sector reforms advanced somewhat over the last year, but they may face an uncertain future\. Further consolidation of social programs, initiated under the SSAL, is now more necessary than ever\. Efforts to provide legal protection to Central Bank managers in the - 19- execution of their lawful duties, a proposal tabled to Congress in the context of this loan, continues being debated today in Argentina\. Currently, the authorities are contemplating a stabilization and reform effort that would bolster credibility in national institutions and renew confidence among domestic and international investors towards the recovery of economic activity and reduction in unemployment and poverty\. The SSAL established a framework for a number of operations which could be activated by the Bank and the IDB in such renewal efforts\. As part of the Bank's contribution to the subsequent international package, the focus was on intensifying reforms in the social sectors, public sector institutional reforms, and intergovernmental fiscal relations\. The IDB meanwhile also moved to follow up on some of the SSAL social sector, insurance, and capital markets initiatives\. Currently, the consolidation of the social sectors, protection of social expenditures, reform of federal provincial and federal fiscal relations, reforms in public administration, financial sector reform, and private sector development, all having roots in the SSAL operation, are under consideration by the authorities for a renewed multilateral support effort\. On balance, the overriding factor in rating sustainability as "unlikely" is that the general political and economic environment does not bode well for continuing some of the specific fiscal, regulatory and social sector reforms that had advanced well during the SSAL implementation\. However, the continued implementation of such reforms remain an integral part of the new agenda for the current Administration in the context of an ongoing stabilization and reform effort\. 6\.2 Transition arrangement to regular operations: N/A 7\. Bank and Borrower Performance Bank 7\.) Lending: The Bank's performance during lending is judged to have been satisfactory\. It was especially notable in providing timely and atypical assistance to a borrower impaired by exceptional and unanticipated financing needs\. In particular, the time it took to proceed from the agreement to consider the Borrower's urgent loan request and bring it to fruition was exemplary\. The Government requested the Bank support in August 1998; it was agreed to at the Annual Meetings, and the SSAL was prepared in about three months\. It bears noting that a QAG sub-panel did not consider the Bank's work in preparing the SSAL fully adequate in terms of the treatment of fiduciary concerns regarding accounting and auditing\. But the overall QAG report differed from the sub-panel's finding on the grounds of lack of clarity of the Bank's expectations in these areas with respect to adjustment operations\. Since the sub-panel's criticism appears to have related more to IBRD adjustment operations generally rather thain this SSAL, it will not be fully addressed here\. Nonetheless, it merits attention that the Bank met two of the overall QAG report's recommendations before the SSAL's approval\. These were that a preliminary assessment be made of the adequacy of accounting and auditing arrangements relating to the Government's use of the funds, and general consideration be given to their institutional framework\. The Bank had already assessed the Government's audit agency and found its practices and standards with project audits, acceptable\. -20- 7\.2 Supenrision: The Bank's performance during supervision is judged to have been highly satisfactory, particularly in light of the operation's complexity and broad coverage\. This necessitated the management of specialized teams in numerous sectors, including highly qualified external and internal experts on issues such as tax laws, regulation, banking supervision, health insurance, poverty measurement, and so on\. This generated some high quality Bank and Bank-supervised analytic work done during the SSAL's execution, e\.g\., in drafting the proposed legislation on insurance sector policies and secured transactions\. Bank supervision also is reported to have helped bridge divergent interests of the two Governnent teams responsible for conducting the program without substantial slippage on policy grounds\. This was deftly done, considering that the second administration was faced with satisfying the conditionality for the final tranche, some of whose provisions they had disagreed with when they were in the opposition\. In this connection, a former Economy Ministry Undersecretary commended the Bank's team for helping to overcome "public choice" difficulties and resolving differences among Government officials\. The Bank supervision team also displayed constructive flexibility in meeting some requests for modification of the original conditionality from some of the second administration's officials, for which the latter praised the Bank\. The record shows intensive, sharply focused, sustained, highly responsive attentiveness to program implementation and high level problem solving, abetted by heavy Bank staff inputs\. While only 7\.4 staffweeks were expended on lending through December 1998 leveraged by substantial and relevant ESW available at the time of the request for such operation\. this multiplied to over 47 sw by end FY99, and, ultimately to over 128 sw by FYO1 for supervision\. A request for an inspection by the Bank's independent Panel was received during the course of implementation\. This request, focusing on the budgetary protection provided to the targeted social programs, was considered to be without foundation by the Panel based on a preliminary review of the Bank's supervision efforts\. The Bank supervision also took special precautions on the fiduciary side\. In addition to supplementing the safeguard checks the measures on the fiduciary side taken before approval, the Bank requested an external audit of the disbursements which generated an unqualified satisfactory opinion on the Special Account\. The Bank undertook a special review of this Account covering later transactions associated with the policy-based guarantee\. Its conclusion was also satisfactory\. The only area in which one might reflect upon is whether or not there was adequate assessment of the impact of the very rapidly changing conditions as the successive external and domestic shocks hit Argentina during implementation and whether these changing conditions should have triggered a different stance by the Bank as it proceeded with the SSAL\. This question could be raised for example, when Brazil devalued in early 1999 in terms of what impact this had on the sustainability of Argentina's overall economic program\. While in many dimensions the answer to this question goes beyond the SSAL program itself and goes to the heart of the reflection by the IFIs on whether or not the Argentine crisis could have been avoided, if alternative policy options had been pursued earlier\. The general - 21 - response provided in the Region's retrospective on Argentina is no\. Many leading economist consider that Argentina's economic program remained viable until mid-2001 or later\. Even with the exchange rate shock of the 1999 Brazil devaluation, there were reasonable prospects that Argentina could have regained competitiveness\. This was borne out by ESW carried out in August 1999, assessing Argentina's competitiveness vis a vis Chile, Uruguay and Brazil, and was consistent with the Fund's calculations of Argentina's effective exchange rate at the time, even though more recent calculations by the Bank may show that the real exchange rate had appreciated considerably by 1999\. More broadly, the Bank was cognizant of the additional effort-going beyond the SSAL--that Argentina would have to had undertaken to sustain its economic program and the risks of alternative exchange rate regimes, particularly if such a change were to be done under crisis conditions\. On the fiscal side, the Bank's concerns were borne out by the risk assessment carried out in February 2000 that identified issues of debt sustainability if the persistent fiscal problems were not addressed while the Fund continued to insist on fiscal targets as part of its continuing support\. Equally, the Bank had diagnosed and formulated an agenda to enhance productivity as well as strengthen the social safety net, all underpinning the Convertibility plan\. Thus, the need for more intensive reformns in the public sector-particularly public expenditure management - and competitiveness was clearly laid out in the May 2000 CAS (see paragraphs 52 and 53)\. 7\.3 Overall Bank performance: Overall the Bank's performance is considered satisfactory\. Nevertheless, this operation flags the issue of the appropriateness of the IFIs - particularly the Bank--helping countries prevent or mitigate vulnerability to economic shocks, or cope with volatile capital market access\. However, such questions appear to have been resolved when the Board approved assistance to such countries as Korea in response to the 1997/98 crisis, per the "Financial Crisis and Structural Reform: The Bank's Role and Instruments" paper ( ref\. SecM98-743)\. These issues were moreover debated during the EDs' discussion on the SSAL/"REPO" in November 1998\. And the EDs' approval in April 1999 of the extension of the Bank's credit guarantee program to encompass sovereign borrowings is considered to have augmented Bank sanction of the SSAL's approach (ref\. "World Bank Policy-Based Guarantees," R99-53)\. In addition, this operation raised the question of the proper price and fee structure for program lending that is large, unexpected, and has strong liquidity features\. The incremental financial risk to the Bank and discouraging the abuse of an incremental financing option justified a higher charge\. The formula set provided that these loans would have five-year maturity periods, including three years of grace, and interest rates of LIBOR plus 400 basis points, in addition to a one percent front end fee and a commitment charge of 75 basis points over LIBOR\. These conditions were judged adequate to compensate the Bank for its extra risk\. On their face, these terms provided considerable price differentiation between IBRD products\. They also took into account the SSAL's differential costs and attractiveness to the Borrower (especially after the Board approved more austere conditions for such lending in October 1998 than had applied to the first Korean emergency loan)\. It is believed therefore that they were appropriate for the -22 - circumstances\. But a more specialized, extensive assessment than this review can provide would be needed to definitively determine whether or not these terms fully reflected the costs to the Bank, as well as efficiently rationed the Bank's constrained capital and covered all relevant risks including those to cash flow\. Additionally, in the context of the current crisis, the use of special terms with their significantly shorter than customary repayment needs, bears reexamination\. Borrower 7\.4 Preparation: Ref para\. 7\.7 7\.5 Government inmplementation performance: Ref para\. 7\.7 7\.6 Iniplementing Agency: N/A 7\.7 Overall Borr7ower peifoirnance: The Borrower entered into the commitments under the SSAL with the understandable imperative of obtaining its resources\. But despite this, the Government generally pursued the reforms satisfactorily\. To this extent, the SSAL accomplishments derived from and reflected a considerable degree of "broad ownership" of the thrust of the proposed changes, especially from the more reformist-minded officials\. This was evident at the outset\. Moreover, some of the second administration's leaders provided fresh momentum and desire for reforms which proved useful, especially on the labor regime\. Certainly, there were mixed Government views on many of the planned actions, as well as (with the benefit of hindsight) what was ultimately achieved\. But there was a reasonable consensus, even among differing government groups, on the issues for which new directions were needed, and those were reflected in the SSAL\. Further, there was often good professional accord with the Government and partner institutions on the appropriate policy responses\. However, this sometimes tended to be truer in dealing with technical rather than top Argentine policy-making levels, particularly with the waning enthusiasm and political capital of the outgoing officials towards the end of the Menem Administration\. The Ministry of Economy, Central Bank, and the Chief of Cabinet's Office, in addition to the Attorney Generl's Office, made especially helpful contributions in the implementation of this loan\. Conversely, others manifested less avid backing, especially those concemed with the education and health system reforms, with outright dissent in some instances\. Even the forceful support of Economy Ministry officers was sometimes insufficient to persuade their colleagues, some of whom appeared hesitant about the political costs and benefits of the proposed changes\. And several had to contend with strong vested interest groups, whose powers stood to be possibly jeopardized\. The officials responsible for these sectors are also understood to have resisted some proposals on the grounds that they were asked (during strong fiscal restraint) to perform difficult tasks without adequate incentives such as compensation from the Loan\. Furthermore, quite a few proposals also encountered opposition from the Congress\. These problems indicate that stronger Executive Branch control and backing for the proposals were needed\. -23 - Overall, the extent of the Borrower's collaboration in the preparation and implementation of the operation is judged to have been suitable under the circumstances\. 8\. Lessons Learned An OPS review of experiences with the first SSALs aptly drew the following lessons, with which this ICR concurs: (a) The Bank had developed a "rapid response capability" to help borrowers deal quickly and effectively with unexpected, turbulent international financial and economic difficulties\. (b) The Bank could successfully adapt its instruments to emerging, unforeseen needs-in this case, to help overcome the severely limited ability of developing nations to access private capital markets\. It confirmed that it could offer loans and guarantees to finance the attendant requirements to retrieve long-term stabilization, including financial system reconstruction\. This does not indicate that the Bank should become a short-term crisis lender\. Nor does it deal with whether the Bank has adequate flexibility for rapidly managing its risk profile or raising additional risk capital\. But the new instruments demonstrated that the Bank can provide an important element of long term finance when it is not available for timely support of urgent reforms\. (c) These lessons also point that for recent or possible IBRD "graduates", graduation does not mean that the Bank could not return quickly to support them during a crisis, even middle income countries with prior access to private capital markets\. This SSAL allowed the Bank to respond flexibly and in an exceptional manner to the special circumstances of Argentina's 1998 crisis\. This experience however raises some questions about this new instrument, which bear review\. - (a) This SSAL was prepared with the intention of sustaining a reform effort under restricted financial conditions\. It also played a role in assuring a dynamic reform trajectory leading up to elections that would occur approximately one year after the loan's approval\. This, however, begs the question of whether local political institutions would be strong enough to carry on the reform agenda following the political transition\. While intensive supervision efforts contributed to the new Government's eventual compliance with third tranche conditions (with one notable technical exception discussed above), these efforts did not prove sufficient\. Although the Bank recognized the risks of the political transition, it may not have been in a position to predict, based on previous experience, that political institutions would later fail under a new administration, leading to serious doubts about the sustainability of the reform program\. Nevertheless, the trade off between the desire to sustain a reform effort under tight financial constraints, and institutional capacity to implement it during unpredictable political transitions, remains an issue of concern in other operations; (b) There may be a potential conflict in the concept of SSALs advancing structural reforms simultaneous while meeting urgent liquidity objectives\. The Argentine experience illustrates the practical limitations of attempting this approach in a country with a potential to enter into a crisis\. In this circumstance, it took a prodigious effort in the limited time available to -24- define and fix the reform package with the desirable detail\. Fortunately as noted, the requisite analytical background was largely available thanks to a reservoir of several years' ESW studies supported by local competence\. But it is questionable if this would normally prevail in most circumstances\. (c) An inherent conflict/moral hazard may be created, on the government side, between the commitment to enact structural reforms of sufficient depth, and the desire to circumvent difficult external financing problems\. Implementation of structural reforms entail laborious, time-consuming efforts within the broad government spectrum\. Not all parts of the Government may have a similar incentive to support such an effort\. As a result, the need to solve such problems in a SSAL situation can create undesirable tensions between activities to mobilize funds while pressing for definitive reform measures\. It may not therefore be always true that such emergency-type circumstances as trying to manage grave external finance shortages afford good "windows of opportunity for reforms that might otherwise have remained closed\." (d) The failure to achieve legislative approval for many of the proposed laws under the SSAL indicates a continuing lack of effectiveness of this form of conditionality and may point to the need to reassess when and how such conditionality is applied\. This ICR did not address the issues of whether there might be better ways of addressing liquidity crises, and whether this could be done in a more efficient and less costly way\. The Bank might devote some effort to analyzing whether alternate instruments might be more appropriate in various circumstances, as well as whether the Bank needs to have a more comprehensive arsenal of instruments available\. In particular, in terms of financial conditions, this SSAL points to the risks inherent in providing short-term financing that complicates, rather than alleviates the medium-term financing requirements\. In the case of Argentina, "special terms" resulted in a loan maturity that was significantly below the average maturity of Argentine public sector debt at that time\. We also need to look at which types of structural reforms may be best combined with liquidity support operations\. The experience under this SSAL offers lessons about ways of seeking good structural adjustment results\. In this instance, those were obtained where three conditions were satisfied: (i) conditions need to be based on a good understanding of the country situation; (ii) all government counterparts need to have commitment to, and the authority to carry out, the desired changes; and (iii) the incentive structure needed to be sufficiently supportive for both the individuals in charge and those likely to be impacted, possibly requiring a large effort to inform and win over these parties\. It is also important to ensure that the aforementioned good understanding of the country situation is readily available at the design stage\. The Bank therefore needs to retain a minimum level of pertinent knowledge of each of its client countries, which has to be updated on a regular -25- basis\. This could be somewhat along the lines of the periodic Fund updates but putting emphasis on those areas of most interest to the Bank\. In addition to traditional economic information, it is also essential to have at least a basic understanding of the political, social and cultural dimensions\. Ultimately, however, even this knowledge base in this case was not sufficient to foresee the unfortunate events of 2001 and early 2002\. An understanding of political, economic, social and cultural dimensions may not be sufficient in predicting the institutional collapse that ensued\. 9\. Partner Comments (a) Borrotver/i,nplententing agency: (b) Cojinanciers: IMF\. The IMF official concerned commended the Borrower for its successful fiscal adjustment performance in 1996-98\. But the program began to go off the track towards the end of that period\. He said that the Asian and Russian crises and the hedge fund debacle in the US were substantially involved\. He noted that Argentina had pioneered borrowing in advance, since 1996\. As a result, he said, when the global contagion spread, there was an immediate possibility that the Government would run out of funds by December 1999\. Against that backdrop, he considered that the program supported by the SSAL and the confinanciers to help the country was successful\. He underscored its contribution in assisting the Government to regain access to the markets\. In this connection, he questioned whether the accompanying "REPO" loan was the most suitable method for providing Argentina's Central Bank the guarantee it entailed\. Perhaps a better vehicle might have involved a direct IBRD loan to that Bank, and for the latter to have established an escrow account for the purpose\. He agreed with the SSAL's provisions, especially in addressing what the Fund considered to be the right issues\. He felt that the targets relating to Federal-provincial revenue/sharing were particularly important\. He hoped that the new intergovernmental pacts would be fully implemented, which would be quite beneficial\. He commended the Bank's support of these efforts, including the envisaged replacement of the tumover tax\. EDB\. An IDB official judged that the SSAL along with the complementary assistance from the IDB and the Fund had been well justified in the light of Argentina's difficult circumstances in 1998\. He said that the IDB had also been concerned about the potential dangers of the spillage of Argentina's crisis to affect other Latin American economies\. In retrospect, the aforementioned assistance had been salutary in helping to stem the country's immediate liquidity shortage\. The IDB is currently evaluating the performance and impact of the program which the SSAL and IDB's parallel loans supported\. He added that the two banks' collaboration, had been positive and beneficial\. (c) Other partners (NGOs/private sector): -26- 10\. Additional Information The individuals interviewed in the course of this preparation of this Report included: Marcelo Acuna Myrna Alexander Miguel Angel Broda Guillermo Collich Daniel Cotlear Ariel Fiszbein Rogelio Frigerio Ricardo Garcioffi Jose Luis Guasch Pablo Guidotti Norman Hicks Anjali Kumar Miguel Kiguel Paul Levy Moises Lichtmajer Roberto Garcia Lopez Luis Lucione Jose Luis Machinea Donald McIsaac Margaret Miller Ferenc Molnar Ronald Myers John Page Carola Pessino Thomas Reichmann David Rosenblatt Maria Cristina Uehara Rene Vandenvries Walter Zunic -27- Annex 1\. Key Performance Indicators/Log Frame Matrix Outcome /Impact Indicators: |Indcator lat :\.-x ProjectedrlnlasltPSR - Achta1Labtst EsUnmate INTERGOVERNMENTAL FISCAL None of the Indicators shown in the left hand RELATIONS oolumn were amended a\. Reform of the "copartidpation system' to a\. An agreement (the 'Federal improve Federal revenue transfers to Commitrent") now exists to move towards a Argentina's provinces and to simplify the new system for the divison of revenues systern between the Federal and provincial levels\. It constituted a de facto simplification of the system for 2001-03 (which was later extended to 2005)\. A second inter-governmental accord calls for a further simplification under which all federal taxes to be shared would enter a general pool\. b\. Rationalization of the distribution of b\. Under the Government proposals, Federal revenues provinces with srnaller tax bases would receive larger transfers per capRta than those wih larger tax bases (application of the "equalization" formula)\. The proposals would strengthen the use of needs-based crteria in revenue allocations\. The present five-fold disparity in per capita revenues between the highest and lowest provincial recipients would be reduced\. -Improvement of data bases as a -Better tax bases should facilitate more foundation for determining per capita tax aocurate fund distributlon bases \. Consolidabon of numerous special c\. Under the Govemment proposals, all c\. Consolidation of numerous spearal revenue tansfers would follow a single sector programs for whIch earmarked taxes formula\. The sector programs induded In the are now levied pool would no longer obtain "automatic" resources\. Govemrnent spending would become more transparent d\. Strengthening the provinoes abiltimes to raise greater revenues on their own d\. A proposed provincial VAT would be superior to the present gross receipts tax\. Its administrative costs should be less than the combined costs of the current gross receipts tax and federal VAT\. A dual VAT should fadlitate cross-checking between Federal and Provincial agendes, and facilitate more automatic complance\. The proposed provision that provindal residents pay the VAT where they lve could help link tax payments with the corresponding services taxpayers receive\. FINANCIAL SECTOR a\. Neutralizing the impact of tax policies on a\.-The Govemments decree on the tax -28 - financial instruments so that they better treatrent of repurchase agreements and respond to market forces pledges/guarantees brought Argentina in line with intemational practices on these instruments\. However, the decree only affects a relatively small set of these instruments\. Greater activity was limited by the need to ensure neutral fiscal effects\. In this connection, the Govemment created a commission to pursue the fiscal neutrality of financial instruments\. It is working to reduce or eliminate distortions\. b\. Greater protection of sector regulatory officers b\. The Govemments proposal to increase these officers' liability protection was not approved by the Congress, partly because of opposition to the immunities recommended\. c\. Coordination of financial sector regulabon c\. A new permanent commission on and supervision regulatory coordination recommended new rules for banks' liquidity management, which were changed, It also provided the basis for draft laws on security markets and insurance\. Studies on the consistency of regulatory practices showed that the criteria for and regulabtion of public and private banks are essentialy similar, as are supervision and enforcement procedures\. No additional actons for achieving greater homogeneity were found to be needed\. The Commission's acUvities have encouraged greater cooperation and coordinaton among financial entifies\. It is reported to be contributing to the solution of sector issues\. BANKING SECTOR a\. Reduced public sector role in the banking a\. The sale of the Govemmenrs housing system mortgage bank (BHN) to private investors resuled in their obtaining control of its board\. BHN's sale reduces the Govemmenrs fiscal burden\. It also lessens possible systerric risk In the event of associated financial and fiscal crises\. -The Central Banks audit of the Banco de la Nacion (BNA) and the publication of its Govemment guarantees and data on its accounts provided a clearer, more transparent picture of its financial condition than existed before\. The extent of this information is limited though\. Meanwhile, BNAs problematic status is unchanged\. b\. Facilitate weak banks' departures from the system b\. An inter-agency committee's review of bank closure mechanisms led to some proposals which were not implemented\. \. The committees review of aspects of bank govemance found the Central Bank's c\. Enhance the marketability of residual bank regulations generally adequate\. -29- portfoios c\. The new authorization to sell loan ACCESS TO CREDIT portfolios from liquidated public banks could stimulate future prnvatiztions a\. Providing small businesses greater access to non-bank finance a\. The new lasing law would eliminat barrlers to the growth of lasing finance\. It b\. Overcome constraints to the use of could produce more flexible term finance than movable collateral (secured transctions) in traditional loan contracts\. The law is credit conbacts considered to represent a substantial improvement over its predecessors\. CAPITAL MARKETS b\. The proposed secured transactions law was not approved by the Congress\. a\. Diversify financial instruments a\. The amendment of the Fund Law to b Improve the rating lndusts quality and remove restrIctions on intemational competitiveness Investments of mutual funds could Improve the diversification of portfolios b\. The acton plan produced after review of the rating Industry was not implemented because of strong opposition\. c\. Modemize the insurance indusbys c\. The legislative proposals on the framework insurance industry incorporated some 'best practie concepts, e\.g\., "early waming, solvency monitoring\. " However, the Congress failed to pass them\. -Secure more adequate captalizaton of the insurance companies Greater industry competition is not yet forthcoming\. But there are advances towards greater consumer protectbon and the new capltal requirements are being enforced well\. -Strengthen preventive supervision of the Quarterly reporting to the Insurance Industry Superintendent (SSN) is now the practice\. The new data SSN received and its more rigorous monitoring led to the suspension of 40 oompanies in the past two years\. HUMAN DEVELOPMENT a\. Improved targeting and efficiency of a\. The new methodology for measurng poverty-reducing social programs\. poverty eliminates some deficiencies of the previous index, i\.e\., the absence of a health indicator and excessive relianoe on housing yardstcks\. The expanded application of improved beneficary Identification (to 14 more programs) pefmits cross-checidng among programs\. It could help limit duplicatory b\. Improved efficiency of overlapping, poorly servbes\. targeted programs\. b\. The establishment of an integrated nutrition program with coordination arrangements unified the three previous operations under the Social Develpment Secretariat\. Collateral actions produced a unified registry of beneficaries, which could help - 30 - control duplication and overlapping of food and nutrition assistance activites\. c\. Improved targeUng of the program of c\. Review of the program showed that, save non-contributory pensions (granted at the for pensions issued at legislators discretion, discretion of the legislative and executive the remainder generally followed reasonable branches) needs-based criteria The Govemments acton plan for improvements includes better guidelines, beneficiary cross-checking, limits on pension transfers, and auditing\. Its effective implementation could cut the number of d\. Safeguarding the social programs critical non-elgibles\. for the poor frorn budget cuts d\. The Govemments commitments to 1999-2000 expenditure levels for agreed programs protected the maternal and child health and nutrftion services, AIDS, small farmers' extension services, primary schools upgrading and community garden activities which were IBRD/IDB-supported\. The Govemment subsequently added employment programs and activifles to Improve indigenous peoples' health to the protected list\. e\. Improved system of unemployment e\. The Govemments proposal for insurance and lower non-wage labor costs decentralized collective bargaining was more comprehensive and surpassed the policy Impact of the original SSAL goal (a fully funded capitalized Insurance scheme)\. The decentralization: -gives lower level unions more jurisdiction in negotiations; -permits more choices on negotiations levels; -phases out the systems which kept lapsed oontracts valid; and -provides incentives for resolving conflicts through mediation and arbitration\. The Congress approval of a complmentary law provides for simplifying registration of new workers, lengthening their probationary period, and reducing taxes on them\. Additional cuts in labor costs and strengthening the safety net for the unemployed, along with other improvements, still await changes in the severance payments and unemployment Insurance systems\. f\. Improved equity and efficency In public f\. The Govemments strategy plan on higher spending on higher education education financing signalled efforts to make appropriate policy changes\. However, the plan failed to receive high level, widespread support and was not Implemented\. A parallel proposal to launch a "national fund for university equity' recommends cost recovery measures, merit-based scholarships, consolidated university budgeting\. It was not implemented and, In any event, would not apply to the 85% of - 31 - public funding for tertiary education that the Congress allocates\. 9\. Improved secondary education g\. The standardized aptitude testng of 5th year public secondary students produced useful data on their achievements and on the education evaluation system\. However, the attempt to distribute the test results was poorly received and Implemented\. Consequenty, public accountability to parents and students is unlikely to have been increased\. h\. Strengthened regulatory framework of h\. The Govemmenfs implementation of new health insurance\. prudential and consumer protection norms for the union-run health plans (Obras Sociales-OS) provides a basis for improved govemance of beneficiary services and their marketing and regulation\. It also fixed suitable standards for OS' public -Better public information on OS perfornance reportng\. performance and consumer satisfaction\. -The Health Insurance Superintendent began issuing annual reports on benefidaries' services, medical program regulabtion, marketing and treatment of complaints\. Consumer satisfaction polls were launched and their findings publicized\. I\. Development of a competitive mansged I\. The scheme for the Health Institut for care market for providing health services to Retirees (INSSJP) to out-source its services pensioners was replaced by measures to contract many more providers to meet pensioners' health care needs\. Initially some 23 (now 75) providers were contracted through more transparent bidding procedures than previously employed\. A limited number of beneficiaries gained freer choices of providers\. These acUons however do not consttute substantial strides towards the competitive health care market goal REGULATORY REFORMS a\. More efficient regulation of Infrastructure a\. The approval of the Executive Branch's services abstention from regulatory disputes on technical and economic issues could make the regulatory agendes more independent The proposed new law on harmonizing regulatory practices, r passed, could: -strengthen the division of responsibilites between the executive and legislatve branches; -limit legislators oversight of regulatory agendes in the process; -stabilize operating conditions for presidents of regulatory commissions\. but Congressional support for the proposal has been limited b\. Integration of transport regulaton b\. The creation of a multi-modal transport directorate provides a potential mechanism for seeking consistency among different freight carriers and possible rationalization of - 32- roads, ports and railways\. It has been slow however In moving towards that goal\. Output Indicators: v \. IndlcatorlMatrix Projected In last PSR Actla/Latest Estimate INTERGOVERNMENTAL FISCAL RELATIONS a\. Proposal of new system of inter a\. Prepare a proposal for putting all major a\. Develped policies to revise the present govemmental financial transfers federal taxes to be distributed Into a single methods of dividing federal tax proceeds pool, and otherwise simplify the system between the Federal and provincial levels -Obtain agreement with the provincial -Intergovernmental agreement endorsed by authorities on the proposal the Congress, changes the amounts to be transferred, moving to a fixed sum -Consensus has been reached with provincial authorities to discuss further changes b\. Rationalization of the distribution of funds b\. Prepare proposals for future funds b\. Designed "equalization-oriented" formula distribution in line with an "equalization" and disswsed it with the provincial formula authorities c\. Improvement of data bases as a c\. Improved data on provincial consumpton, foundabtion for determining per capita tax autormrobile and property values bases d\. Consolidation of special sector programs d\. Prepare proposal for incorporation of d\. Designed and advanced the proposal with for which earmarked taxes are now levied special programs In the Federal budget as the provinces line items or including them in the general e\. Strengthening the provinces capabilities co-participabon pool to raise more revenues on their own e\. Design proposals for decentralized tax e\. Prepared proposal for new provinial tax powers\. Instrument to replace present distortUonary powers\. taxes\. It calls for a provincial VAT whose rates would be set kxlally\. FINANCIAL SECTOR a\. Neutralizing the Impact of tax policies on a\. Review tax treatment of financial a\. Review perfomed did not Indicate any financial instruments Intem ediation and propose measures to need for corrective legisltion\. Govemment achieve neutrality established a commission aimed at Improving tax rules and guidelines b, Improving the protecton of financial b\. Design proposals to strengthen bank b\. Preparation of a draft law aimed at sector regulators regulators' and supervisors' protection Increasing Iability protection\. against legal actions affecting them c\. Coordinating financial sector regulation c\. Establish and make operational an c\. Creation and activation of a Permanent and supervision inter-agency committee of financial regulatory Commission on the Evaluation of Financial agencies Regulation BANKING SECTOR a\. Reducing public sector role in the a\. Bring the second Uer housing mortgage a\. The Govemment sold its controlling banking system bank (BHN) to the point of sale interest In the BHN to private investors b\. Facilitating weak banks' departure from b\. Creaton of an inter-agency mechanism to b\. A temporary inter-agency commission the system improve the resolution of bank failure reviewed bank falure mechanisms and problems and govemance guidelines, and govemance provisions propose remedial measures c\. Enhancing the marketability of residual c\. Authorization of federal banks to sell loan c\. Authoriation provided - 33 - bank portfolios portfoltos from liquidated banks ACCESS TO CREDIT a\. Developing competitive leasing industiy a\. Submission of revised leasing law to the a\. Draft revision submitted to the legislature Congress b\. Overcoming legal Impediments to the b\. Submission of new legislative proposals b\. New proposals given to the Congress use of secured transactions CAPITAL MARKETS a\. DiversIfying financial hstruments a\. Presentaton to the Congress of draft bw a\. Government submitted such proposals to remove the restriction on mutual funds Investments intemationally b\. Increasing compettiveness in the ratng b\. Contract a review of the Industry and b\. Govermment review and plans completed Industry Implement proposals based on Its findings and recommendations c\. Proposals submitted for revised legislation c\. Modemizing the insurance industry's c\. Present revised laws to Congress framework, supervision and regulation incorporating more advanced concepts and greater attentiveness to consumer protection -Draet pegislatin calls fr early waming interests detKon practkes -Strengthen preventive supervision -Install early waming detection system in - Stricter SSN enforcement launched Insurance Superintendent (SSN) -Securing more edequate industry capitalization -Adoption of SSN plan to enforce new capItl requirements HUMAN DEVELOPMENT a\. Improved targeting of poverty-reducing a\. Proposal of new poverty line and a\. Definition of new methodology for social programs methodology for measuring unsatisfied measuring poverty 'basic needs' -Expanded coverage of beneficiary - Application of improved information -Extension to 14 more social programs identification systems systems to more social programs b\. Trm cetainsocil prgmms b\. esig andimplnion proosal fbr b\. Merger under the Social Development b\. Trim certain social programs' b\. Dtesign and implement proposals for Secretariat of food and nubtition programs overlapping and poor targting Integrating food and nutrition programs Into an Integrated acvtivty\. -Review the distribution of -Review was conducted and plan non-contributory pensions programs and prepared for improved distribution propose new eligibility criteria c\. Safeguarding spending levels for key \. \. c\. crttsraa social programs against budget cuts c\. Obtain commitments for 1999 spending c\. Commitments obtained on key programs d\. Improving unemployment insurance d\. Examine options for installing fully d\. The study was carried out\. it was then system and lowering non-wage labor costs capitalized unemployment insurance scheme replced by a Govemment proposal for, and and prepare the instruments needed Congressional ratification of, the decentralIation of collective bargaining\. e\. Preparation of funding policy changes and Addition of complementary supportive law\. e\. Achieving greater equiy and efgiency in resolution for Education Ministry fntroduction e\. Plan prepared and Government of incentives for greater cost recovery, announcement of intention to establish merit-based scholarships and consolidated national fund for university equity releding university budgets those principles f\. Improving secondary education f\. Aptitude testing of all 1998 fifth year secondary education students, and f\. Testing perfomied and resutts provided to certifcation of the resuling grades Federal Council education officers for public -34 - distribution g\. Strengthenirg health insurance's g\. The Health Supenintendents g\. SHSs reports attesting to satisfactory regulatory tramework implementation of prudental and consumer implementation provided protecion norms, and reportng on the union-run health programs' performance -2\.500 beneficdaies were surveyed under consumer polls, comparing services of restructured union-sponsored providers with those not restructured\. h\. Development of more competitive heft h\. INSSP (GovemmenVs health p ISJPcotatigrxenernmero car prvelogoramst for more compensionersfor the retired) out-souring servces to major care providers with some provisions for providers greater transparency and service choices REGULATORY REFORMS a\. Rationalizfaon of infrastructure regulation a\. Reducfion of Executive Branch's role in a\. Verification that Executve Branch regulatory disputes organizations need not hear appeals of regulatory agendes' decisions on technical and analytical matters\. Govemment prepared plan for increasing b\. Integraton of transport servie regulation regulatory agendies autonomy b\. Preparafton of design and implementaton plan for an integrated Federal agency on \. freiht ranpor b\. Proposed agency established\. ,fr3ight transport End of project - 35 - Annex 2\. Project Costs and Financing N/A N/A N/A N/A - 36- Annex 3\. Economic Costs and Benefits SSAL operations do not lend themselves to conventional rates or return or equivalent calculations of economic costs and benefits\. - 37 - Annex 4\. Bank Inputs (a) Missions: Stage of Project Cycle No\. of Persons and Specialty Performance Rating (e\.g\. 2 Economists, I FMS, etc\.) Implementation Development Month/Year Count Specialty Progress Objective Identiflcation/Preparation September 1998 13 Mission Leader, Fiscal Sector, Financial Sector, Human Capital, Regulatory Issues, Public Sector Supervision December 1998 11 Mission Leader, S S Sub-national Issues, Financial Sector, Labor Regulation, Health Sector, Education Sector, Social Sectors, Regulation, Insurance May 1999 9 Mission Leader, Financial S S Sector, Health Sector, Social Sector, Regulation, Labor Regulation, Sub-National Issues, Education November 1999 9 Mission Leader, Social Sector, S S Sub-National Finances, Labor & regulatory, Social Sector, Financial Sector, Education Sector, Health Sector February 2000 10 Mission Leader, Social Sector, S S Labor & Regulatory, Sub-National Finances, Transport, Health Sector, Insurance, Financial Sector, Education Sector March 2000 3 Mission Leader, Sub-National S S Finance Labor & Regulatory July 2000 8 Mission Leader, Labor & S S Regulatory, Sub-National & Finance, Finance, Health ICR June 2001 1 Consultant -38 - (b) Staff: Stage of Project Cycle Actual/Latest Estimate No\. Staff weeks US$ (000) Identification/Preparation 33\.92 231\.90 Supervision 128\.11 740\.60 ICR 9\.00 40\.32 Total 171\.03 1012\.82 Costs include travel and consultant fees\. - 39 - Annex 5\. Ratings for Achievement of Objectives/Outputs of Components (H=High, SU=Substantial, M=Modest, N=Negligible, NA=Not Applicable) Rating O Macro policies O H OSUOM * N O NA OI Sector Policies O H *SUOM O N O NA OI Physical O H OSUOM O N * NA L] Financial OH *SUOM ON ONA 3I Institutional Development 0 H O SU 0 M 0 N 0 NA F Environmental OH OSUOM O N * NA Social O Poverty Reduction O H *SUOM O N O NA L Gender O H OSUOM O N * NA LI Other (Please specify) O H OSUOM O N * NA Ol Private sector development 0 H * SU O M 0 N 0 NA OI Public sector management 0 H O SU * M 0 N 0 NA l Other (Please specify) O H OSUOM O N * NA -40- Annex 6\. Ratings of Bank and Borrower Performance (HS=Highly Satisfactory, S=Satisfactory, U=Unsatisfactory, HU=Highly Unsatisfactory) 6\.1 Bankperformance Rating D Lending OHS OS OU OHU El Supervision OHS OS O U O HU O Overall OHS OS O u O HU 6\.2 Borrowerperformance Rating O Preparation OHS OS O u O HU rl Government implementation performance O HS O s 0 U 0 HU El Implementation agencyperformance OHS OS O U O HU Ol Overall OHS OS O U O HU -41 - Annex 7\. List of Supporting documents Argentina: A Retrospective Review -42 - Report No\.: 22619 Type: ICR
REVIEW
P114042
Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) Report Number: ICRR0022064 1\. Project Data Project ID Project Name P114042 PNG - Urban Youth Employment Project Country Practice Area(Lead) Papua New Guinea Social L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA-48540,TF-94791,TF-A1282 30-Apr-2016 26,304,141\.42 Bank Approval Date Closing Date (Actual) 11-Jan-2011 31-Jul-2019 IBRD/IDA (USD) Grants (USD) Original Commitment 15,800,000\.00 11,400,000\.00 Revised Commitment 27,130,262\.74 11,330,262\.74 Actual 26,304,141\.42 11,330,262\.74 Prepared by Reviewed by ICR Review Coordinator Group Cynthia Nunez-Ollero Fernando Manibog Christopher David Nelson IEGSD (Unit 4) P154412_TBL Project ID Project Name P154412 PNG Urban Youth Employment Project AF ( P154412 ) L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) 0 Bank Approval Date Closing Date (Actual) 18-Nov-2015 Page 1 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) IBRD/IDA (USD) Grants (USD) Original Commitment 0\.00 0\.00 Revised Commitment 0\.00 0\.00 Actual 0\.00 0\.00 2\. Project Objectives and Components DEVOBJ_TBL a\. Objectives According to the Financing Agreement (FA, p\. 5), and the Project Appraisal Document (PAD, paragraph 12), the Project Development Objective was "to provide urban youth with income from temporary employment opportunities and to increase their employability\." This review will assess the achievement against the following objectives: ï‚ to provide urban youth with income from temporary employment opportunities, and ï‚ to increase the employability of urban youth The PDO was not revised even when the Papua New Guinea (PNG) Strategic Partnerships Multi Donor Trust Fund provided Additional Financing (AF, see Financing below)\. According to Bank guidelines, AF may increase outcome target indicators and change project ambition\. However, in this case, the additional resources increased the value of the outcome targets but did not raise the project’s ambition\. Hence, the AF did not trigger a split rating\. This project used a workfare program to provide welfare benefits or social safety net services to its target constituents\. Workfare programs provided eligible social welfare benefits to unemployed or underemployed constituents in exchange for some work or job training\. b\. Were the project objectives/key associated outcome targets revised during implementation? No c\. Will a split evaluation be undertaken? No d\. Components 1\. Youth Job Corps (YJC) (US$ 6\.9 million at appraisal, US$4\.2 million in AF for a total of US$11\.1 million, US$11\.1 million, actual)\. This component financed community awareness and information campaigns to reach target youth participants; selecting disadvantaged, unemployed youth from the National Capital District target area; and training them in basic life skills for employment and the work environment\. Training Page 2 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) included appropriate on-the-job behavior, personal presentation, health and hygiene, and working as a team\. This component also financed a two-month short term placement in maintenance of public works such as road maintenance, landscaping, drainage clearing, vegetation control, and refuse collection\. 2\. Skills Development and Employment Scheme (SDES) (US$ 5\.4 million at appraisal, US$4\.2 million in AF for a total of US$9\.6 million,US$9\.6 million, actual)\. This component financed the participation of the target youth in (i) two Pre-Employment Training (PET) programs equivalent to entry level vocational training programs delivered by local vocational training organizations; (ii) on-the-job training (OJT); and (iii) work experience\. One PET program covered trade, industrial and commerce-related employment\. A second PET program covered basic bookkeeping, data entry, business practices, and information technology\. PET training would be followed by five months of OJT work placement\. OJT host employers could retain trainees as full- or part-time, or released to other prospective employers\. 3\. Project Management (US$ 4\.4 million at appraisal, US$2\.4 million in AF for a total of US$6\.8 million, US$6\.8 million, actual) This component financed the operating costs of the Project Management Unit (PMU), training of key personnel, technical assistance to the PMU, and other support costs\. e\. Comments on Project Cost, Financing, Borrower Contribution, and Dates Project Cost: The total project cost reached a total of US$27\.2 million consisting of US$15\.80 million (excluding US$1\.2 million in contingency costs), original commitment, US$0\.6 million in grants, and US$10\.8 million in AF (see below)\. US$26\.3 million was disbursed at closing\. The balance of US$0\.8 million was due to exchange rate losses (SDR to US$)\. Financing: The project was financed by a credit from the International Development Association (IDA)\. The Republic of Korea provided an initial grant for project preparation\. The Papua New Guinea (PNG) Strategic Partnerships Multi-Donor Trust Fund provided AF\. Borrower Contribution: The Government committed US$1\.58 million in counterpart financing and disbursed US$3\.89 million\. Dates: The project was approved on January 11, 2011 and became effective on November 2, 2011\. The Mid Term Review (MTR) was conducted on March 31, 2014\. The project was originally scheduled to close on April 30, 2016 but was extended by 39 months to July 31, 2019\. There were three restructurings: ï‚ on August 29, 2013 to make the following changes: o adjusted the age of eligible urban youth from 16-25 to 16-35 years old\. By PNG law, 16 years old was the minimum employment age\. Youth was defined as unmarried, unemployed, and economically dependent on their families or others for financial support between 16 - 35 years\. Older participants in leadership roles would benefit the project (ICR, footnote 18)\. o reduced the target of YJC workfare days from 480,000 to 300,000 days\. The target was reduced because of higher than expected attrition rates (youth working an average of 26 of the 40 days offered, resulting in cost and placement inefficiencies), delays in the award and implementation of works because of insufficient market response, escalation of costs in procuring contracts and the appreciation of the PNG Kina, and suboptimal levels of wage efficiency (average higher ratio of labor to labor inputs)\. Page 3 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) o reduced the percentage of youth in the bottom 40 percent of household income levels from 70 to 50 percent\. This target was reduced because the heterogenous project area included households above and below the targeted income levels\. A lower percentage of youth self- identified as being in the bottom 40 percent of the target population\. ï‚ on November 18, 2015, provided AF and extended the closing date by 30 months to October 31, 2018\. The following indicators were revised to better measure outcome: o Total target workfare days completed increased (from 300,000 to 660,000 days) disaggregated into YJC (420,000 days) and OJT (240,000 days) o Target percentage of OJT graduates with an offer of a paid job (30 percent)\. o Target percentage of trainees with a job (salaried or otherwise) three months after graduating (10 percentage points higher than comparable controls) o Two new outcome indicators were introduced: (i) direct beneficiaries (target 11,500); direct female beneficiaries (target 40 percent); and (ii) percentage of grievances addressed by the project (target 90 percent) as a new core indicator to track citizen engagement (see Section 9, Monitoring and Evaluation below)\. Other intermediate outcome indicators were added (see Section 4, Efficacy below)\. ï‚ on September 25, 2018 extended the closing date by nine months to July 31, 2019 and help the Project Management Unit (PMU) to transition to the follow-on project and complete the impact evaluation\. 3\. Relevance of Objectives Rationale The PDO remained relevant to the country's various development plans including Vision 2050, Development Strategic Plan (2010-2030), National Youth Policy (2007-2017), and Medium Term Development Plan (2018-2022), which focused on the country's youth unemployment\. Vision 2050 focused on improving the country's human development\. One of its seven pillars focused on improving human capital development, gender, youth, and people empowerment\. The Development Strategic Plan (2010- 2030) called for secondary education for all, providing all those who leave school with employment opportunities, and halving the rate of youth crime\. The National Youth Policy (2007-2017) incorporated youth development in its national development planning\. The Medium-Term Development Plan (2018-2022) attributed the high levels of youth unemployment to high school drop out rates and lack of appropriate skills and knowledge for employability\. The PDO was also relevant to the World Bank's latest Country Partnership Strategy (CPS) for PNG (2013- 2016)\. This strategy was extended to remain valid to coincide with the country's latest Medium Term Development that began in 2018\. The PDO was relevant to two of the three pillars of the CPS\. The first pillar was aimed at increased and more gender equitable access to physical and financial infrastructure\. The second pillar was aimed at gender equitable improvements in lives and livelihoods\. The PDO closely supported the second pillar\. The PDO significantly contributed to the outcome that youth in urban areas had more access to improved training and job opportunities\. This outcome was reflected in specific targets that 300,000 workfare days were completed by beneficiaries and at least 50 percent of OJT beneficiaries gained Page 4 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) a 20 percent increase in incomes\. These targets coincided and were supported by the outcomes under this project\. Rating Relevance TBL Rating High 4\. Achievement of Objectives (Efficacy) EFFICACY_TBL OBJECTIVE 1 Objective - to provide urban youth with income from temporary employment opportunities Rationale The Theory of Change: Community awareness and information campaigns targeted 17,500 potential youth trainees in the poorer communities of the National Capital District (NCD)\. Each trainee would be offered 5 days or 40 hours in Basic Life Skills for Employment (BLS) training and an understanding of the working environment such as appropriate on-the-job behavior, personal presentation, health and hygiene, occupation, road safety management, and working as a team\. After receiving basic financial literacy training to set up their own bank accounts, trainees would be compensated for up to a maximum of 8 hours per day of the 5-day training\. After BLS training, youth facilitators would assess participants to match their socio-economic profile, skills, previous experience, and aspirations with work placement options\. Trainees would be offered two months of short-term employment in the public works sector\. The YJC's skill augmenting labor-based public works would proceed in two phases: ï‚ Phase 1 covered labor-intensive public works according to the maintenance needs of the NCD's and those implemented by the Parks and Gardens Unit and the Works Unit road network, feeder and community access roads that lead to poorer neighborhoods, and those not receiving routine maintenance\. The road maintenance activities included simple road maintenance, cleaning, and environmental protection such as vegetation control and drain cleaning\. The PMU would compensate trainees based on time and performance records for up to a maximum of six hours a day for 39 days using SMS banking platform\. ï‚ Phase 2 would expand eligible work activities after the first year of implementation (phase 1)\. Decision to expand would be based on (i) the satisfactory management and disbursements rates; (ii) satisfactory labor intensity rates of the activities; and (iii) a reasonable period of work was maintained\. These work activities included existing urban renewal and environmental and social protection programs, higher skilled activities, and minor works such as tree planting, brick making, market cleaning, rehabilitation of the city's footpaths using interlocking tiles, and other waste management or environmental protection activities\. Income from these temporary employment opportunities would achieve this objective\. Page 5 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) The Key Outcome Indicators were: ï‚ number of workfare days completed by beneficiaries (original target 480,000 revised target, 300,000, further revised to 660,000 and disaggregated into YJC (420,000 days) and OJT (240,000 days)\. ï‚ percent increase of OJT beneficiary incomes relative to control group (target 20% increase)\. This indicator was revised at restructuring to the percentage of trainees with a job (salaried or otherwise) three months after graduating (target 10 percentage points higher than comparable controls)\. OUTPUTS: ï‚ Participating youth completed 819,037 workfare days (original target 480,000, revised to 300,000, further revised to 600,000, target exceeded)\. The original target was reduced from 480,000 to 300,000 workfare days because the original NCD road length target was overestimated\. Labor intensive maintenance works covered 121 km of the reduced 600 to 700 km roads\. Reduced target was due to higher than expected attrition rates resulting in cost/placement inefficiencies where youth worked an average of 26 of the 40 days offered; slow implementation of works; and suboptimal levels of wage efficiency (average higher ratio of labor to labor inputs at 60/40)\. The AF increased the total target workfare days completed from 300,000 to 660,000 and disaggregated it into YJC (420,000 days) and OJT (240,000 days)\. ï‚ YJC participants completed 425,388 labor days (revised target 420,000, target exceeded) with 11,506 YJC participants (target 11,500, target achieved) ï‚ OJT participants completed 346,755 labor days (revised target 240,000, target exceeded) with 4,548 OJT beneficiaries (target 3,000, target exceeded) and 2,890 OJT graduates (original target 2,400, target exceeded) ï‚ 24,000 youth applicants were screened, with 18,497 or 77 percent meeting the basic eligibility criteria (original target 10,500, revised target 15,500, target exceeded); 7,584 (target 6,200, target exceeded) or 41 percent of those screened were female (original target, 40 percent, target achieved)\. ï‚ The project reached about 2,000 participants from each of the 12 wards or 17 neighborhoods of the project area (NCD), even those with security risks\. 12 percent of the participants were Indigenous Motu-Koita, the traditional landowners of Port Moresby (original target 10 percent, target exceeded)\. ï‚ 31\.8 percent (target 33 percent, target almost achieved) of beneficiaries who self-reported as being from the bottom two steps of the six-step economic welfare ladder\. This target indicator assessed the project's impact on poverty reduction but there was no available data\. OUTCOMES: The outcomes for increasing temporary employment opportunities due to the project were rated against two control groups\. The 2015 control group consisted of similar youth in NCD who did not participate in the project\. The 2017 control group consisted of participants who did not receive PET or OJT training but completed YJC training and were part of the FIFA volunteer work program\. Samples from both participants and from the control groups were re-interviewed in the 2015 and 2017 Follow-Up Surveys\. Income from the temporary employment opportunities delineated above indicates the achievement of this objective as discussed below\. ï‚ Incomes increased based on temporary employment opportunities\. Almost US$ 6 million in stipends were paid for training and work (original target, revised target, target reached)\. Income was used for basic household consumption, family support beyond the project area, and to start or expand small businesses\. Page 6 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) o 74 percent of the youth accepted to the project, of which 41 percent were female, never had a bank account prior to participating in the project (original target, 30 percent, revised target 40 percent, target achieved)\. The project increased financial literacy training; provided reference for identification; and its partner, the Bank of South Pacific (BSP) waived its required fee (PGK20) to open a bank account\. As a result, participating youth established 17,800 BSP accounts\. Of those trained, 33 percent reported never having attended high school while 70 percent reported never having a waged job\. o The 2015 Follow Up Survey results were offered as evidence of the increase in temporary employment opportunities:  36 percent of participants upon enrolment in the training programs reported friends involved in fights or robbery in the 3 months prior to the program, which decreased to 23 percent\. For the control youth, the numbers increased from 35 to 39 percent over the same period\.  Participants who reported using threat or force with somebody decreased from 16 to 7 percent after participating in the project\. For the control group, the number increased over the same period\.  During the ICR consultation, some of those interviewed indicated that the training created connections and positive friendships among diverse groups of young people\. ï‚ Stipends paid to YJC temporary employment were commensurate to the minimum wage (PGK3\.52 or US$1\.04 an hour) over a six-hour working day for 40 days for civil works and routine maintenance activities\. ï‚ Stipends paid to OJT participants placed in local firms equal to the minimum wage over an 8 hour working day for a period of 3 months\. ï‚ 31\.8 percent of beneficiaries self-reported as being in the bottom 2 of the economic welfare ladder (target 33 percent, almost achieved)\. According to the ICR, this indicator was to be expressed as 50 percent of participants from the bottom 33 percent of the economic welfare ladder\. Economic welfare was initially estimated as proxy indicators from Household Income and Expenditure Survey (HIES) data\. However, lack of data did not generate reliable estimates\. As an alternative, the Follow Up Surveys asked participants to self-report against a six step economic welfare ladder\. Fewer participants than expected identified themselves as being among the 33 percent of the poorest in the population compared to when they started with the project\. Data was collected from the baseline and eligibility screening surveys (ICR, Annex 1, p\. 37 of 64)\. In summary, both PDO outcome indicators (technically, outputs) were exceeded\. Incomes from temporary employment increased for the target youth (only summary figures were provided) resulting in a substantial achievement of the outcomes\. Rating Substantial OBJECTIVE 2 Objective to increase the employability of urban youth Page 7 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) Rationale Theory of Change: After completing training in basic life skills, numeracy and literacy, and pre-employment trainings (PETs) described above, targeted youth would be provided OJT and more permanent work placements\. Support would focus on how to compete in the existing job market by improving skills for workplace entry, build confidence in job seeking behavior, and linking directly with prospective employers and works contractors\. The project focused on increasing employability as evidenced by on going employment offers rather than on increasing employment opportunities by directly intervening in the job market through labor market insertion schemes\. The Key Outcome Indicator to reflect an increase in the urban youth's employability was: ï‚ percent of OJT beneficiaries with a job (salaried or otherwise) relative to comparable controls (target 10% increase)\. This target was revised at restructuring to percent of OJT graduates with an offer of a paid job (target 30 percent) OUTPUTS: ï‚ 2,890 OJT participants (original target 2,400, target exceeded) completed 346,755 labor days (target 240,000, target exceeded) ï‚ 1,148 or 41 percent reported that they were employed, full or part time, in the six months prior to the 2017 Follow Up Survey (target 30 percent, target exceeded)\. The control group reported a 15 percent employment rate)\. OUTCOMES: The employability of the urban youth was achieved using two impact evaluations or follow up surveys in 2015 and 2017, several community and employer surveys\. At the ICR workshop held in November 2019 (proxy beneficiary survey), participants confirmed that (i) proportions reported in the ICR were valid and significant in showing a positive mix of NCD population; and (ii) benefits were likely to spread beyond the NCD because some beneficiaries noted they sent funds back to their families in locations outside the project area (ICR, page 14 of 64)\. ï‚ About 100 employers consisting of private, public, and civil society organizations participated in the OJT activities\. They provided project trainees a "second chance," invested time and effort in orienting and mentoring participants, and followed procedures\. The project reported mobilizing US$1 million from Exxon Mobil to finance design and supervision of the first Follow Up Survey\. The project established a partnership with the Bank of South Pacific to deliver financial literacy training, waive fees to set up and maintain accounts for over 18,000 project participants\. Employers confirmed that they retained trainees after completing their OJT\. Some were given full time permanent positions, others as casual registers, and called to work part time when needed\. Numbers of retained OJT trainees were unspecified\. Employers expressed that PET trainees had unrealistic high expectations of securing full time employment and were unwilling to take on menial tasks because they were trained for skilled work\. Employers appreciated the availability of low-cost trainees, ready to be hired after their OJT, and screen those with positive attitudes\. ï‚ Employers and contractors of OJT participants who responded to the 2017 Employers Survey reported that 97 percent were satisfied with trainee performance and qualified for full time jobs (original target 60 percent, revised to 70 percent, target exceeded)\. During the ICR consultations, employers confirmed their high level of satisfaction with the project outcomes, that project participants displayed a willingness to work in a team and aimed for continuous improvement\. Employers surveyed Page 8 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) also reported that project participants were promoted within host employers with some reaching managerial or valued senior officer level\. (ICR, page 18 of 64, top of the page)\. ï‚ According to the 2015 community survey: o 36\.8 to 29\.6 percent of participants were less likely to hang out with friends late at night, and would be more selective of their social circle/friends o 23\.7 to 15\.7 percent reported incidence of having a best friend involved in crime in the last three months\. ï‚ According to the 2015 Follow Up Survey: o 32 percent of youth sought paid employment in the last three months (baseline 21 percent at start of project)\. OJT graduates reportedly sought formal sector jobs, increased confidence in finding such jobs, and were motivated to further their education\. o 19 percent of unemployed project participants who looked for a job compared to control group provided evidence of an increase in job seeking behavior (target 8 percent, target exceeded)\. Anecdotal feedback indicate that those who were more active in job searches were more successful in securing work, even if temporary\. Anecdotal information that participants who went for self-employment training started small businesses by selling small goods\. ï‚ According to the 2017 community survey, o 85 percent of community members (target 50 percent, target exceeded) reported positive impact of the project on the youth because of reduced crime, anti-social behavior: o 86 percent reported a reduction in crime and anti-social behavior\. o 77 percent of respondents also reported that project participants were less likely to be involved in crimes\. o 82 percent of respondents also reported positive character and behavioral changes in participating youth\. o 68 percent reported an increase in employment opportunities, o 55\.4 percent reported an increase in knowledge and skills of project participants\. o 76 percent found the program to be well organized\. ï‚ According to the 2017 Follow Up Survey: o 41 percent of OJT graduates received offers of a paid job (target, 30 percent, target exceeded)\. 2,890 OJT graduates (original target 2,400 graduates, target exceeded)\. o 26 percent were offered employment three months after completing training (target 10percent, target exceeded) compared to the control group\. Exceeding the target was evidence of increased employability\. o a statistically significant 19 percentage points of OJT youth were likely to seek formal sector jobs compared to youth in the control group who reported no change\. o Participants and employers appreciated work readiness skills\. 83\.2 percent of participants acknowledged that the project increased their knowledge, skills, and confidence to participate in the labor market (original target 60 percent, revised target 75 percent, target exceeded)\. ï‚ Participant youth were more likely to be employed in the formal sector\. According to the Project Completion Report prepared by the implementing agency, the OJT data showed that the top employing occupation was clerical and administrative workers (17 percent) followed by works, general labor, and maintenance (14 percent), retail customer services (13 percent) hospitality (12 percent) and catering (4 percent)\. The single highest place trade was carpentry (ICR, page 17 of 64, top of the page)\. ï‚ 26 percent of YJC participants and 36\.5 of OJT participants dropped out of their respective programs\. The higher OJT drop out rate was attributed to the longer commitment period (five months, compared Page 9 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) to 30-40 days under the YJC)\. The dropouts were due to competing family priorities (gardening for food, child care, illness)\. Incentives such as transport, more regular coaching, and follow up, were introduced to improve retention rates\. A moderate drop out rate was experienced even though the literature claims a high drop out rate was endemic in youth work readiness programs due to a lack of continuum of care that was meant to assist disadvantaged youth to address complex issues in their lives such as housing, young parenthood, family, relationships, involvement in criminal factions, low income, and adolescent health issues (ICR, page 14 of 64, bottom of the page)\. ï‚ 12 percent of project beneficiaries were Motu-Koitabuan (target 10 percent, target exceeded) In summary, employability was evidenced by the extent to which OJT participants were offered ongoing employment\. Employers surveyed indicated that an unspecified proportion of project trainees who became employed were retained, promoted, or made permanent\. The PDO outcome indicator - percent of OJT beneficiaries with a job (salaried or otherwise) relative to comparable controls (target 10% increase) - was revised at restructuring to percent of OJT graduates with an offer of a paid job (target 30 percent) and was exceeded at 41 percent\. These outcomes resulted in a substantial rating\. Rating Substantial OVERALL EFF TBL OBJ_TBL OVERALL EFFICACY Rationale The outcomes above show that objectives were met\. There was a modest increase in participant incomes\. Employment opportunities were provided\. Increasing employability of targeted youth was substantially achieved through the instituted workfare programs\. There was no beneficiary survey conducted after July 31, 2019 but feedback was generated at the ICR workshop held in November 2019\. The project achieved the PDO outcome indicators Overall efficacy was rated substantial\. Overall Efficacy Rating Substantial 5\. Efficiency Economic and Financial Efficiency: At appraisal, no cost benefit analysis was carried out because of a lack of baseline data and in country capacity for data collection and analysis (PAD, paragraph 58)\. No Economic Rate of Return (ERR) was established because (i) the project was not seeking to maximize private returns; (ii) the cost of capital was small because costs were a combination of IDA credit and a grant; and (iii) the project emphasized non-quantifiable social benefits\. Page 10 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) At closing, the project conducted a cost benefit analysis using two scenarios - a conservative scenario and a moderate one\. The moderate scenario served as the baseline for the best estimates for all possible benefits of the projects while the conservative scenario provided the absolute minimum benefit that the project would generate\. Annex 4 provided additional details to the cost-benefit analysis\. Under both scenarios, a cost-benefit ratio was determined over a 10 year time frame to indicate if benefits were larger than the costs\. Data was taken from project data and the 2017 and 2018 impact evaluations, all funded under the project\. The cost of capital was not specified\. Benefits from the public works program were assumed to be equal to the cost of materials for road maintenance and footpaths under both scenarios\. The same value for benefits from the YJC and the OJT stipends were used for both scenarios\. Under the moderate scenario, the following assumptions were used to arrive at the value of the 4 additional benefits: (i) actual BLST training stipends; (ii) actual PET training stipends; (iii) post YJC employment used a 24\.1 percent employment rate on minimum wage over the 10 year employment period\. and (iv) post SDES employment used a 15 percent employment rate on minimum wage over the same period\. Under the moderate scenario, the benefit cost ratio at closing was at 2\.90\. This meant that every US$1 spent on the project, generated US$2\.90 in benefits\. This ratio was due to the comprehensiveness of the project, its long-term training, support to job searches and matching trainees with jobs, and subsidizing work experience\. Under the conservative scenario, the following assumptions were used to arrive at the value of the 4 additional benefits: (i) no BLST benefits; (ii) no PET training benefits; (iii) post YJC benefits used a 12 percent employment rate on minimum wage with 60 percent on full time employment (240 days a year) and 40 percent on part time employment (120 days a year); and (iv) post SDES employment used a 12\.5 percent employment rate on minimum wage with 60 percent on full time employment and 40 percent on part time employment\. As a result, the benefit cost ratio under the conservative scenario at closing was at 1\.41\. Administrative and Operational Efficiency: The Bank team obtained a small grant financing to initially fund this project that was implemented over a 30-month period\. Before this grant was closed, the IDA credit was approved\. The initial grant was closed on time, the IDA credit was extended by 30 months, and the AF was extended by 9 months for a total of 39 months\. The project was implemented over nine years\. Substantial risks such as lack of capacity identified at appraisal were mitigated by community participation in decision making; civil society and private sector consultation; grievance redress mechanisms, technical assistance to strengthen financial management and procurement, independent audit, and regular guidance during implementation (PAD, paragraph 55)\. Restructuring and supervision adequately mitigated these risks\. Increased participatory processes were among the mitigating measures used to address implementation delays\. Evidence was derived on the number of youth who came to participate in the programs and were eventually screened as eligible\.Government commitment was evident in the disbursement of US$3\.9 million after originally committing US$1\.6 million\. By closing, the project disbursed all of the grant and 95 percent of the IDA credit\. The project operated in a complex sector\. Several entrenched providers and major stakeholders in the sector had limited coordination\. There was no sector leader on the side of the government\. At the start of the project, the implementing agency had limited capacity, leading to a series of delays in establishing the office and securing full staffing complement, which escalated overhead costs \. Additional staff were needed for effective operations and project extensions\. On balance, while noting the initial delays, higher costs, and project extensions, the benefit-cost ratios that have been achieved lead to an efficiency rating of substantial\. Efficiency Rating Page 11 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) Substantial a\. If available, enter the Economic Rate of Return (ERR) and/or Financial Rate of Return (FRR) at appraisal and the re-estimated value at evaluation: Rate Available? Point value (%) *Coverage/Scope (%) 0 Appraisal 0  Not Applicable 0 ICR Estimate 0  Not Applicable * Refers to percent of total project cost for which ERR/FRR was calculated\. 6\. Outcome The project's relevance of objectives was high, Efficacy of objectives 1 and 2, overall efficacy, and efficiency were all rated substantial, thus resulting in an overall outcome rating of Satisfactory\. a\. Outcome Rating Satisfactory 7\. Risk to Development Outcome The following pose risk to development outcome: ï‚ Financial risk: Competing budgetary priorities usually result in inadequate budget resources for social programs such as this project\. There was a lack of evidence with regard to the financial flows and continued viability of the project outcome\. Adequate data to support the impact of engaging the otherwise unemployed or underemployed labor force for their participation in productive economic activities would mitigate this risk\. A follow-on project would mitigate this risk as well (ICR, p\. 12 of 64)\. ï‚ Economic risk\. At the time of implementation, available jobs were already affected by the economic downturn in the National Capital District\. The outcome of the project is vulnerable to deteriorating economic conditions\. With the raging pandemic brought by Covid 19, economic uncertainty in sustaining the results from this project remain high\. ï‚ Social risk\. The rate of drop out was considered to be at par for the kind of assistance provided under this project\. Assistance in developing capacity may not be sustained over time and requires strengthened psycho-social support through cognitive behavioral interventions One evidence of negative social impact was the expressed opinion of trainee beneficiaries that even after achieving employability and earning income, they remained among the poorest in the city\. There was also the drop-out rate noted in the outcomes above (see Section 4, Efficacy above)\. Page 12 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) ï‚ Institutional support risk\. Mainstreaming the program would require strong partnering ties with other service delivery institutions through a referral service scheme, for example\. Continuing to explore partnerships and networks with other providers and other types of prospective employers would be useful\. Legislative frameworks to allow for educational services and predictability in funding safety net programs would enhance the sustainability of workfare programs such as the one generated by the project\. Leadership by the National Youth Development could help mitigate this risk\. They could also focus on nurturing partnerships and foster networks with other service providers\. ï‚ Government ownership/commitment risk\. The government's commitment to the results from this project could be provided by continuous budgetary support to the workfare programs\. Another evidence of government ownership would be expanding the project to other areas of the country\. ï‚ Other stakeholder ownership risk (for example, from private sector/civil society) The impact of the project could be broadcasted to a broad audience of prospective employers or other entities in the government who benefited from those trained under this project\. This effort could mitigate the risk that these entities continue to participate and welcome the target youth segment into the productive labor force\. 8\. Assessment of Bank Performance a\. Quality-at-Entry The project was strategically relevant to the government's poverty reduction programs aimed at its urban youth's employability and the negative economic consequence of unengaged young population According to the ICR, government-funded youth programs, by other development partners, and other non-state actors proved ineffective, ran for too short a period, or too fragmented to make a long term impact\. Education and vocational training programs did not meet the needs of out-of-school or out-of- work youth\. This was the first project in the social sector that the Bank was financing in 19 years\. The implementing entity had no prior experience in implementing a Bank social sector project\. Key line ministries of the Treasury and Planning had new staff who were also not familiar with Bank procedures\. A grant financed project preparation to address these issues at preparation\. A Quality Enhancement Review was undertaken at entry to ensure that potential risks were identified and provided mitigating measures\. Lessons learned from other workfare programs to augment low incomes and labor market insertion schemes that helped empower disadvantaged youths informed project design\. These included: (i) the need for clear objectives, tasks and simple implementation arrangements; (ii) building on existing services to facilitate project implementation; (iii) transparency and leveraging partnerships to delivery results by drawing on implementation capacity of the private sector and civil society organizations (CSOs); (iv) using demand driven skills development, market oriented job training to better integrate youth into the labor markets; and (v) bundling services such as skills training, life skills, on the job learning, and job search assistance (PAD, paragraph 37)\. In addition, the project benefited from the lessons of IEG's review of ICRs that focused on urban operations in Africa, Latin America and the Caribbean, and South Asia regions\. Page 13 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) Project design was complex\. New concepts such as a multi-sectoral approach and engaging the private sector to partner in offering workfare benefits to the target youth were introduced\. Design focused on securing strong political commitment from the government and development partners, maintaining close supervision and technical assistance during start up, and a robust M&E to disclose project results\. In summary, the design factored in the low capacity of the implementing agency and the first time that the country was borrowing for a social sector project in 19 years\. There were sufficient mitigating factors identified that were carried out at supervision (see below)\. Quality at entry was rated satisfactory\. Quality-at-Entry Rating Satisfactory b\. Quality of supervision The Bank team supervised the project adequately as evidenced by more than 15 missions over the 9-year implementation period\. Technical missions accompanied some of the supervisory missions to deliver training to the Project Management Unit (PMU)\. The focus on achieving the PDOs was evident in the 2 restructurings informed by the implementation progress and the 2014 MTR\. Initial delays were addressed successfully\. For example, the project hired local and international staff, and built a team-based approach to project management when there was an initial difficulty finding qualified and experienced staff\. The project found suitable office space for young people to contact staff and provide safe and productive working environments\. When a contracted training provider declared bankruptcy, the PMU implemented the activities instead\. Implementation problem areas were candidly discussed and addressed by additional funds and at restructuring\. Operations continued, additional time provided, design refined, and implementation adjusted to achieve a higher level of performance\. Risks identified at preparation were adequately mitigated during implementation\. Project beneficiaries were selected using transparent and inclusive processes\. A grievance mechanism was instituted and effectively utilized, reporting 100 percent resolution after 20 days, exceeding the 90 percent target\. Focus on the project's development impact was evident in the partnering with BSP and securing their commitments to achieve financial literacy and electronic banking\. Transition arrangements for the follow-on project were included in the last restructuring\. These included relocating the project office from privately rented facilities to NCDC's new City Hall annex\. Non-essential personnel contracts of the PMU were not renewed\. In summary, despite the venture into a new sector, the implementation strategy and the Bank team's support adequately mitigated identified risks, hence supervision was rated satisfactory\. Quality of Supervision Rating Satisfactory Overall Bank Performance Rating Page 14 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) Satisfactory 9\. M&E Design, Implementation, & Utilization a\. M&E Design The theory of change was sound\. The objectives were clear\. The two activities, YJC and SDES would generate trained and employable youth\. They would be matched to jobs\. They gain income from labor\. Experience made the trainees become employable\. The PMU would maintain a Monitoring and Information System (MIS) database linked to the Youth ID issued to each trainee\. The theory of change was reflected in the 4 key outcome indicators in the results framework\. These indicators were revised during restructuring\. Eleven new intermediate outcome indicators were introduced at restructuring\. All key outcome indicators supported the project outcomes\. The 11 Intermediate outcome indicators captured the contribution of the components and outputs to achieving the PDOs\. The indicators were specific, measurable, time bound although the outcomes were nearer to outputs in nature\. Baseline would be established during implementation\. Targets were well identified except for the employability outcomes\. The employability of the trainees, reflected in whether they remained employed three months after the OJT, could also have been reflected by whether they gained continuous employment or if unemployment was reduced in the target cohort, although the PDO was expressed with a more limited outcome\. The PMU was designated to implement the M&E design\. A communication campaign would be carried out throughout implementation to disseminate project results\. b\. M&E Implementation A Project Steering Committee (PSC) consisting of key government, private sector, and civil society stakeholders would oversee project implementation\. The PSC would provide guidance on policy measures, review progress, work programs, and budgets, and facilitate high level coordination among key stakeholders\. The project would be implemented by the National Capital District Commission (NCDC)'s Project Management Unit (PMU)\. The PMU implemented the M&E\. The project baseline was carried out as part of 2015 impact evaluation\. Impact evaluation was conducted as part of the continuous monitoring through surveys of participants, controls, employers, and communities\. These surveys were administered at regular intervals\. The conduct of the surveys was challenging to implement because of the fragile context (security, transient nature of youth trainees, etc\.) but nevertheless yielded important information for the project (ICR, page 26)\. The 2015 AF introduced two new outcome indicators to be monitored: (i) direct beneficiaries, and (ii) percentage of grievances addressed by the project, with the latter an indicator of citizen engagement, albeit with a negative connotation\. Data was regularly collected from participants and other stakeholders\. PMU reporting improved over time, actively discussing results, shortcomings, and corrective measures such as tracking female participants or drop-out rates\. Implementation difficulties with surveys were experienced when the team leader of the consulting firm passed away unexpectedly and was not replaced\. After that contract was terminated in 2017, enumerators and specialized researchers implemented the surveys\. The surveys informed project implementation and was also used by the government and other donors for their own Page 15 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) analyses\. One shortcoming was in capturing the success factors in OJY implementation in relation to engaging employers\. c\. M&E Utilization The project utilized the M&E outputs to inform project implementation\. The surveys informed the adjustment of project activities and worked toward achieving the PDOs\. Progress reports informed the NDC, Departments of Treasury, Planning, and others who were members of the Project Steering Committee, such as the National Youth and Development Agency\. The scope if the data collected was reported in the ICR as having exceeded those required under M&E design\. Data collected was used for cross sectional analysis and time comparisons\. Occasional delays in data input and analysis affected some of the data's usefulness (ICR, page 27)\. A final project impact evaluation was delivered in 2018, which considered all baseline analysis and surveys to reach overall impacts\. The results were posted online\. Relevant data were used to prepare the government's version of the completion report as well as the ICR\. Other donors and development partner reported used of the data for youth sector reports\. M&E Quality Rating Substantial 10\. Other Issues a\. Safeguards Environmental and Social Safeguards: The project was assigned an environmental assessment category of "B," requiring a partial environmental assessment (PAD, paragraph 68)\. The project triggered OP/BP 4\.01, Environmental Assessment, and OP/BP 4\.10 Indigenous Peoples\. An Environmental and Social Management Framework (ESMF) was prepared, approved, and disclosed\. Environmental Management Plans (EMPs) were included in civil works contracts to assure that small scale and low intensity adverse impacts were effectively managed\. A social assessment was completed in April 2010 outlining positive impacts from an increase in social capital of PNG's youth and a strengthened engagement between the government and civil society (PAD, paragraph 63)\. That same social assessment provided background information on the Motu-Koita peoples and assessed their support for the project\. The project area, the National Capital District (NCD) was urban but the Motu and Koita peoples were acknowledged to be the customary owners of the area\. To comply with OP/BP 4\.10, and reduce the risk of social conflict between ethnic groups in the project area, project's design did not include a separate Indigenous Peoples plan but adopted the following measures: (i) consultations to enjoin community support at preparation; (ii) consultation framework during implementation; (iii) targeted awareness raising campaigns to ensure culturally appropriate benefits; (iv) mitigating measures for culturally appropriate grievance redress mechanisms; and (v) disclosing key project documents in the local languages\. Page 16 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) b\. Fiduciary Compliance Financial Management: According to the ICR, financial management was satisfactory overall\. Timeliness and accuracy of financial reporting improved over time\. All financial compliance issues were addressed\. Financial audit statements up to December 31, 2018 were submitted and accepted, on time or one to two months overdue\. The first year's audit was late by 9 months\. All financial audit opinions were unqualified\. Findings and recommendations in the audit management letter were actioned and addressed\. There were no findings or recommendations in management letters from 2014 to 2018\. The final audited financial statements and management letter for the year ended December 31, 2019 would be due by June 30, 2020\. All Interim Unaudited Financial Reports have been submitted and accepted\. Timeliness of reporting improved in the second half of the project\. The final IFR was due on February 15, 2020\. Procurement: Initial procurement delays were due to need to recruit and train sufficiently experienced staff\. Contract works incurred were higher than designed due to escalating costs of materials and elapsed time since feasibility studies were completed\. Early on, insufficient market response delayed the award and implementation of management support services to supervise labor intensive workfare services\. This shortcoming was addressed at restructuring by allowing communities to identify suitable subprojects, form groups to supervise YJC activities and strengthen community participation\. All 46 targeted contracts were completed, 41 were commercial and 5 were community contracts\. Appreciation of the value of PNG currency during the project also negatively impacted the estimated costs of goods and services\. c\. Unintended impacts (Positive or Negative) --- d\. Other --- 11\. Ratings Reason for Ratings ICR IEG Disagreements/Comment Outcome Satisfactory Satisfactory Bank Performance Satisfactory Satisfactory Quality of M&E Substantial Substantial Quality of ICR --- Substantial 12\. Lessons The ICR offered the following four lessons from the operations that other task teams may find useful to consider for future similar projects: ï‚ Unemployed or underemployed youth, when given a second chance, could become productive participants in economic activities\. In this project, the training and curated Page 17 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) employability of trained youth led to considerable demand\. Its success was attributed to an urban target region with a sufficient number of large businesses and hence more employment options for OJT programs\. The YJC activities may be less sensitive to an urban setting and could be replicable in non-urban settings\. However, project expansion would be dependent on available staff to deliver the project arrangements used in this project\. The lesson from this project was that giving underprivileged youth a second chance allowed them to actively participate in the economic activity of their communities\. ï‚ Basic life skills and job readiness skills are significant foundations in structuring the Theory of Change to make young people compete in the job market\. An Active Labor Market Program like the one under the project was comprehensive and covered training, wage subsidies, and work placements\. This strategy matched the unemployed school dropouts to jobs and employers after receiving training\. The trainees secured on-going employment when they demonstrated workplace skills that employers valued more than technical skills\. Employers valued the investments in the BLS and PET because these prepared the youth to join the work force with the expected attitude\. The lesson from this operation was that equipping the target youth with basic life skills and job readiness are valued by employers for job security\. ï‚ A strong mentoring and coaching program, combined with soft and practical life skills facilitate a change in attitudes among at-risk youth\. In this project, the skills and coaching of the trainers and community facilitators influenced a change in understanding of at-risk youth on work responsibilities, diversity in the work place, gender equity, improving health and nutrition\. However, the data showed that the time was too short to achieve a turn around for young people with complex needs and contexts\. The lesson from this operation was that psycho-social support therapies were important to consider in supporting out-of- work youth to foster their labor force participation\. ï‚ At-risk youth need more time and a variety of paths to employment and employability\. In this project, employers expressed the need to go beyond the basic life skills and practical employability training and confidence boosting\. They noted the need to create a more varied cadre of employable youth with higher level skills\. This could be achieved by extending the time supporting trainees and introducing trade apprenticeships or technical vocational educational training (TVET)\. The lesson from this operation was that there are numerous ways to achieve employability of at-risk youth so that they could improve their condition and contribute to a wider economic activity\. 13\. Assessment Recommended? No 14\. Comments on Quality of ICR The ICR was concise and consistent with the guidelines\. It was results oriented, providing evidence from the various surveys that formed part of the project's impact evaluation to support claims regarding the achievement of objectives\. The report was candid and provided the factors that led to project inefficiencies\. Evidence was provided from credible sources such as project funded impact evaluations and surveys\. The annexes provided Page 18 of 19 Independent Evaluation Group (IEG) Implementation Completion Report (ICR) Review PNG - Urban Youth Employment Project (P114042) robust evidence to support the achievements reported\. The quality of analysis provided a concise summary of the results of the project\. Lessons were based on evidence and corresponded to the reported findings\. The report emphasized results and highlighted how the activities informed the outcomes and project impacts\. The report was internally consistent and the results were mutually reinforcing\. a\. Quality of ICR Rating Substantial Page 19 of 19
REVIEW
P049770
Document of The World Bank Report No: ICR0000910 IMPLEMENTATION COMPLETION AND RESULTS REPORT (Loan No 45710, 33960, GEF Grant No\. 20169) ON A IBRD LOAN IN THE AMOUNT OF US$ 80\.00 MILLION AND A IDA CREDIT IN THE AMOUNT OF SDR 37\.20 MILLION (US$ 50\.00 MILLION EQUIVALENT) AND A GLOBAL ENVIRONMENTAL FACILITY GRANT IN THE AMOUNT OF US$ 5\.00 MILLION TO THE REPUBLIC OF INDIA FOR A SECOND RENEWABLE ENERGY PROJECT September 30, 2008 Sustainable Development Department India Department South Asia Region i CURRENCY EQUIVALENTS (Exchange Rate Effective March 31, 2008) Currency Unit = INR INR 1\.00 = US$ 0\.025 US$ 1\.00 = INR 39\.97 FISCAL YEAR April 1 ­ March 31 ABBREVIATIONS AND ACRONYMS ADB Asian Development Bank BEE Bureau of Energy Efficiency CAS Country Assistance Strategy CER Certified Emission Reduction CUF Capacity Utilization Factor DNES Department of Non-Conventional Energy Sources DO Development Objectives DPR Detailed Project Report DSM Demand Side Management EE Energy Efficiency EEC Energy Efficiency and Conservation EIB European Investment Bank EIRR Economic Internal Rate of Return ESCO Energy Service Company FIRR Financial Internal Rate of Return FM Financial Management GEF Global Environment Facility GEO Global Environment Objectives GHG Greenhouse Gas GoI Government of India IBRD International Bank for Reconstruction and Development ICR Implementation Completion Report IDA International Development Association IREDA Indian Renewable Energy Development Agency Limited IPP Independent Power Producer KfW Kreditanstalt fur Wiederaufbau LoC Line of Credit MNES Ministry of Non- Conventional Energy Sources MNRE Ministry of New and Renewable Energy MoU Memorandum of Understanding M&E Monitoring & Evaluation M&V Measurement & Verification MPSEB Madhya Pradesh State Electricity Board MU Million Units NEAP National Environmental Action Plan NGO Non Governmental Organization NPA Non Performing Asset ii O&M Operations & Maintenance OTS One Time Settlement PAD Project Appraisal Document PCN Project Concept Note PDO Project Development Objective PFC Power Finance Corporation PMR Progress Management Report PPA Power Purchase Agreement PTC Power Trading Corporation PwC PricewaterhouseCoopers QPR Quarterly Progress Report RE Renewable Energy RFP Request For Proposal RoR Run of River SARFAESI Securitization and Reconstruction of Financial Assets and Enforcement of Security Interests SEB State Electricity Board SERC State Electricity Regulatory Commission SHP Small Hydropower SME Small and Medium Enterprise TA Technical Assistance TAP Technical Assistance Plan TF Trust Fund WB World Bank USAID U\. S\. Agency for International Development WHR Waste Heat Recovery Vice President: Isabel Guerrero Country Director (Acting): Rachid Benmessaoud Sector Manager: Salman Zaheer Project Team Leader: Mikul Bhatia ICR Team Leader: Jeremy Levin iii INDIA Second Renewable Energy Project CONTENTS Data Sheet A\. Basic Information B\. Key Dates C\. Ratings Summary D\. Sector and Theme Codes E\. Bank Staff F\. Results Framework Analysis G\. Ratings of Project Performance in ISRs H\. Restructuring I\. Disbursement Graph 1\. Project Context, Development Objectives and Design 2\. Key Factors Affecting Implementation and Outcomes 3\. Assessment of Outcomes 4\. Assessment of Risk to Development Outcome 5\. Assessment of Bank and Borrower Performance 6\. Lessons Learned 7\. Comments on Issues Raised by Borrower/Implementing Agencies/Partners Annex 1\. Project Costs and Financing Annex 2\. Outputs by Component Annex 3\. Economic and Financial Analysis Annex 4\. Bank Lending and Implementation Support/Supervision Processes Annex 5\. Beneficiary Survey Result Annex 6\. Stakeholder Workshop Report and Results Annex 7\. Summary of Borrower's ICR and/or Comments on Draft ICR Annex 8\. Comments of Cofinanciers and Other Partners/Stakeholders Annex 9\. List of Supporting Documents Annex 10\. Institutional Development of IREDA Annex 11\. Sample Energy Efficiency and Renewable Energy Investments Annex 12\. Map iv A\. Basic Information Country: India Project Name: Second Renewable Energy Project ID: P049770,P055906 L/C/TF Number(s): IBRD-45710,IDA-33960, ICR Date: 09/30/2008 ICR Type: Core ICR GOVERNMENT OF Lending Instrument: SIL,SIL Borrower: INDIA AND IREDA Original Total USD 130\.0M,USD 5\.0M Disbursed Amount: USD 107\.4M,USD 5\.0M Commitment: Environmental Category: B,C Focal Area: C Implementing Agencies: Indian Renewable Energy Development Agency Cofinanciers and Other External Partners: B\. Key Dates Second Renewable Energy - P049770 Process Date Process Original Date Revised / Actual Date(s) Concept Review: 01/17/1997 Effectiveness: 01/31/2001 01/31/2001 Appraisal: 07/14/1997 Restructuring(s): Approval: 06/27/2000 Mid-term Review: 07/14/2003 Closing: 03/31/2006 03/31/2008 ENERGY EFFICIENCY - P055906 Process Date Process Original Date Revised / Actual Date(s) Concept Review: 01/17/1997 Effectiveness: 11/11/2000 01/31/2001 Appraisal: 07/14/1997 Restructuring(s): Approval: 06/27/2000 Mid-term Review: 07/14/2003 Closing: 03/31/2006 03/31/2008 C\. Ratings Summary C\.1 Performance Rating by ICR Outcomes Satisfactory GEO Outcomes Satisfactory Risk to Development Outcome Low or Negligible Risk to GEO Outcome Low or Negligible v Bank Performance Satisfactory Borrower Performance Moderately Satisfactory C\.2 Detailed Ratings of Bank and Borrower Performance (by ICR) Bank Ratings Borrower Ratings Quality at Entry Satisfactory Government: Moderately Satisfactory Quality of Supervision: Satisfactory Implementing Agency/Agencies: Satisfactory Overall Bank Performance Satisfactory Overall Borrower Performance Moderately Satisfactory C\.3 Quality at Entry and Implementation Performance Indicators Second Renewable Energy - P049770 Implementation QAG Assessments (if Performance Indicators any) Rating: Potential Problem Project at any time (Yes/No): No Quality at Entry (QEA) None Problem Project at any time Quality of Supervision (Yes/No): Yes (QSA) None DO rating before Closing/Inactive status Satisfactory ENERGY EFFICIENCY - P055906 Implementation QAG Assessments (if Performance Indicators any) Rating: Potential Problem Project at any time (Yes/No): No Quality at Entry (QEA) None Problem Project at any time Quality of Supervision (Yes/No): Yes (QSA) None GEO rating before Closing/Inactive Status Satisfactory D\. Sector and Theme Codes Second Renewable Energy - P049770 Original Actual Sector Code (as % of total Bank financing) Central government administration 4 4 Power 96 96 vi Theme Code (Primary/Secondary) Climate change Primary Primary Other financial and private sector development Primary Primary Rural services and infrastructure Primary Secondary Water resource management Secondary Secondary ENERGY EFFICIENCY - P055906 Original Actual Sector Code (as % of total Bank financing) Renewable energy 100 100 Theme Code (Primary/Secondary) Climate change Primary Primary Infrastructure services for private sector development Primary Primary Other financial and private sector development Primary Primary Pollution management and environmental health Primary Primary Regulation and competition policy Secondary Secondary E\. Bank Staff Second Renewable Energy - P049770 Positions At ICR At Approval Vice President: Isabel M\. Guerrero Mieko Nishimizu Country Director: Rachid Benmessaoud Edwin R\. Lim Sector Manager: Salman Zaheer Alastair J\. McKechnie Project Team Leader: Mikul Bhatia Magdalena V\. Manzo ICR Team Leader: Jeremy Levin ICR Primary Author: Chandrasekar Govindarajalu ENERGY EFFICIENCY - P055906 Positions At ICR At Approval Vice President: Isabel M\. Guerrero Mieko Nishimizu Country Director: Rachid Benmessaoud Edwin R\. Lim Sector Manager: Salman Zaheer Alastair J\. McKechnie Project Team Leader: Mikul Bhatia Magdalena V\. Manzo ICR Team Leader: Jeremy Levin ICR Primary Author: Chandrasekar Govindarajalu vii F\. Results Framework Analysis Project Development Objectives (from Project Appraisal Document) The main project development objectives were to: a) augment power supply through environmentally sustainable small hydro investments; b) mobilize private sector investments in renewable energy projects; and c) promote energy efficiency and demand side management (DSM) investments\. Revised Project Development Objectives (as approved by original approving authority) The project development objectives were not revised\. Global Environment Objectives (from Project Appraisal Document) The GEF-supported global environmental objective was to enhance and sustain improved end-use energy efficiencies with consequent reduction in carbon emissions\. Revised Global Environment Objectives (as approved by original approving authority The project global environmental objectives were not revised\. (a) PDO Indicator(s) Original Target Formally Actual Value Indicator Baseline Value Values (from Achieved at approval Revised Target Completion or documents) Values Target Years Indicator 1 : Increase in small hydro installed capacity under the project and sectorwide IREDA project: IREDA project: 200 153 MW (TargetIREDA project: 95\.65 Value reduced in MW (commissioned (quantitative or IREDA project: 0 MW MW proportion to as of closing March Qualitative) Sectorwide: 1206 MW Sectorwide: Not 31 2008, out of 158\.25 defined reduction in loan/credit MW total) amount) Sectorwide: 2180 MW Date achieved 01/31/2001 01/31/2001 11/29/2006 03/31/2008 Comments The total capacity funded under the project when all schemes are commissioned will be (incl\. % 158\.25 MW\. (103%)\. It is expected that commissioning of all plants would be completed achievement) by March 2009\. Increased availability and utilization of energy efficient products and equipment and of Indicator 2 : ESCO services - measured as investme nt under Bank project and as equivalent generation capacity in MW Investments : USD Value Investments : USD 0 million 20 million Investments : USD (quantitative or Equiv\. Generation Capacity : Equiv\. Generation 16\.93 million Qualitative) 0 MW Capacity : Not Equiv\. Generation Defined Capacity : 48 MW Date achieved 01/31/2001 01/31/2001 03/31/2008 Comments Investments : 85% (incl\. % Equiv\. Generation Capacity : Not Applicable viii achievement) (b) GEO Indicator(s) Original Target Formally Actual Value Indicator Baseline Value Values (from Achieved at approval Revised Target Completion or documents) Values Target Years Indicator 1 : Number of ESCOs operating in the country 4-8 ESCOs in 2002 per "An Value International Survey of the There are more than (quantitative or Energy Service Company No target specified 25 ESCOs currently Qualitative) (ESCO) Industry", Edward L\. Vine, Lawrence Berke ley operating in India\. National Laborator Date achieved 01/31/2002 01/31/2002 03/31/2008 Comments (incl\. % The project provided technical assistance support for 8 ESCO sub-projects and a loan for achievement) one\. Indicator 2 : Avoidance of carbon emissions through energy effiociency investments under the project Carbon emission reductions from Value Carbon Emissions avoided: 0 No target was IREDA EE projects (quantitative or are estimated to Qualitative) MTCO2 specified\. exceed 9\.43 million tonnes (lifetime emission reductions)\. Date achieved 01/31/2001 01/31/2001 03/31/2008 Comments (incl\. % The presented figures are for IREDA's complete EE loan portfolio, including projects under achievement) implementation for which emi ssion reduction figures have been estimated\. (c) Intermediate Outcome Indicator(s) Original Target Formally Actual Value Indicator Baseline Value Values (from Achieved at approval Revised Target Completion or documents) Values Target Years Mobilization of Private Capital and management Resources into the Renewable Power Indicator 1 : Sector, measured as Promoter's Contrib ution to sub-projects, and number of promoters supported\. Promotor's Promotor's Value Promotor's Contribution : Contribution : No Contribution: USD (quantitative or USD 0 million target specified 117 million Qualitative) Number of Promoters Supported : 0 Number of Number of Promoters Promoters Supported Supported: 33 ix : No target specified Date achieved 01/31/2001 01/31/2001 03/31/2008 Comments This achievement measures promotor's contribution to renewable energy investments (incl\. % supported under the project, and not the broader sector investments, which also increased achievement) significantly during the project period\. Indicator 2 : IREDA is able to build up a sound and sustainable energy efficiency portfolio IREDA has funded 17 energy effiency Value investments during the (quantitative or No Energy Efficiency No targets were project - of which 12 Qualitative) projects in IREDA portfolio specified recieved reimbursement under the Bank line o f credit\. Date achieved 01/31/2001 01/31/2001 03/31/2008 Comments (incl\. % Not Applicable achievement) x G\. Ratings of Project Performance in ISRs - Actual Disbursements No\. Date ISR (USD millions) Archived DO GEO IP Project 1 Project 2 1 12/28/2000 S S S 0\.00 0\.00 2 06/26/2001 S S S 3\.00 0\.00 3 12/21/2001 S S S 4\.87 0\.00 4 06/20/2002 S S S 8\.54 0\.50 5 12/19/2002 S S S 12\.63 0\.83 6 06/24/2003 S S S 17\.50 1\.23 7 09/19/2003 S S S 18\.36 1\.23 8 03/30/2004 S S U 23\.17 1\.43 9 10/05/2004 S S U 45\.74 1\.61 10 05/19/2005 S S U 53\.33 2\.01 11 06/24/2005 S S S 53\.33 2\.01 12 12/07/2005 S S 64\.80 2\.54 13 06/25/2006 S S S 71\.77 2\.75 14 12/22/2006 S S S 81\.02 3\.14 15 06/19/2007 S S S 89\.71 3\.48 16 12/18/2007 S S S 95\.88 4\.20 17 12/20/2007 S S S 95\.88 4\.20 18 06/16/2008 S S S 107\.37 4\.85 H\. Restructuring (if any) Not Applicable xi I\. Disbursement Profile P049770 P055906 xii 1\. Project Context, Development and Global Environment Objectives and Design: 1\.1 Context at Appraisal (brief summary of country and sector background, rationale for Bank assistance): 1\.1\.1 Country Background By the second half of the 1990s, India's reforms in the areas of investment, trade, and finance, initiated in response to the 1991 crisis, had helped stimulate the economy\. During the period 1994- 1997, the country experienced high average rates of economic growth of 7 percent\. The 1997 Country Assistance Strategy (CAS) document proposed Bank group assistance in reducing infrastructure bottlenecks and promoting private sector participation across sectors\. The India Compact also called for the Bank to assist the Government to implement priorities identified in its National Environmental Action Plan (NEAP 1993), including development of the Alternative Energy Plan\. 1\.1\.2 Sector Background At the time of project design, India's power industry was characterized by inadequate and inefficient power supply with peak capacity and energy supply shortages exceeding 20 percent and 10 percent, respectively\. On the demand-side, inefficient pricing and a variety of market and non-market barriers contributed to the overall inefficient use of electricity and thermal energy, exacerbating the energy shortage and leaving a large unfulfilled market for financing investments in projects that could cost-effectively reduce energy costs in industrial units\. The Government of India's (GOI) response to the continuing power sector shortages was to provide additional support to states who were undertaking power sector reforms and to encourage entry of private sector investments in the sector\. These reforms included unbundling of previously integrated State Electricity Boards (SEBs) and the establishment of independent regulatory agencies who worked at creating appropriate enabling environments to encourage private sector investment in power generation\. The accelerated development of the country's renewable energy resources and of energy efficiency programs was a priority thrust area under India's NEAP, as the government was aware of the benefits of increased levels of environmentally sustainable energy investments\. At the national level, the government had a long record of support to Renewable Energy, including the establishment of a Department of Non-Conventional Energy Sources (DNES) and the establishment of the Indian Renewable Energy Development Agency Limited (IREDA) in 1987, under the administrative purview of the DNES\. IREDA was given the dual mandate of promoting renewable energy technologies and of providing financial support to investments in the sector\. The DNES was later elevated to the status of a ministry, the Ministry of New and Renewable Energy (MNRE), earlier called the Ministry of Non conventional Energy Sources (MNES), which has administered one of the largest renewable energy programs amongst developing countries\. As part of its efforts to promote renewable energy, the Ministry issued guidance on appropriate power purchase tariffs which could be adopted by the states which recognized the positive externalities from renewable energy\. At the state level, each state adopted its own policies, but central government guidance was a key factor in establishing a supportive enabling environment for private sector development of renewables\. Several Southern states adopted various policies in the early to mid 1990s to attract private sector development of small hydro and other small-scale renewable energy power facilities, including wheeling, banking, and third party sales arrangements\. In contrast, the regulations in the Northern states were not as supportive of renewables, and the level of private sector SHP development remained low despite relatively high resource potential figures\. Most of the small hydro projects in the Northern areas were primarily undertaken by public sector entities\. At the time of project appraisal, GOI support for energy efficiency was focused on provision of support for energy audits and information dissemination programs in the industrial sector by public sector institutions including the National Productivity Council, the Petroleum Conservation Research Association, the Industrial Development Bank of India (IDBI) and the Energy Management Center (EMC)\. These efforts 13 lacked a unified approach to overcome market barriers to energy efficiency, especially on financing identified efficiency investments\. The passage of the energy conservation act and the creation of the Bureau of Energy Efficiency (BEE) in 2001 was a major step forward by the Government in advancing its energy efficiency strategy and signified the beginning of a comprehensive approach to address this important topic\. The Government's emphasis on clean energy development including both efficiency and renewables has increased since the time of appraisal\. This is evidenced by the findings of the Planning Commission's Integrated Energy Policy Report (2006) and the renewable energy and energy efficiency missions presented as part of the National Climate Change Action Plan (2008)\. Rationale for Bank Involvement The first line of credit to IREDA under the India: Renewable Resources Development Project (CPL-35440; COFN-03220; TF-20339; TF-28633) successfully facilitated early private sector interest in renewable energy development\. A second line of credit to IREDA was considered appropriate for broadening the impact of the program and supporting the development of SHP in other areas of high potential throughout the country\. Additionally, a line of credit for energy efficiency was considered to be an appropriate complement to the renewable energy program given the unmet financing needs of industrial and commercial end-users who paid relatively high power prices but under-invested in energy efficiency\. While the technical and economic potential for improving energy efficiency and thereby reducing carbon emissions in India was sizeable, several market barriers prevented realization of these savings\. At the time of project appraisal, it was felt that IREDA could take a leadership role in implementing activities to overcome energy efficiency market barriers\. a\. Original Project Development Objectives (PDO) and Key Indicators [as approved]: Project Development Objectives Key Performance Indicators Augment power supply through Increase in SHP installed capacity under the project and environmentally sustainable SHP sector wide investments Mobilize private sector investments in Private sector promoter's contributions to renewable renewable energy power projects energy sub-projects and number of sub-projects supported Promote energy efficiency and demand- Increased availability and utilization of energy efficient side management (DSM) investments products and equipment and of ESCO services ­ measured as investments under the Bank project and as equivalent generation capacity IREDA builds up a sound and sustainable energy efficiency portfolio b\. Original Global Environmental Objectives (GEO) and Key Indicators [as approved]: Project Development Objectives Key Performance Indicators Enhance and sustain improved end-use Energy efficiency service providers are able to gain energy efficiencies with consequent market entry ­ measured as number of ESCOs operating reduction in carbon emissions in the country Avoidance of carbon emissions resulting from energy efficiency investments under the project 14 c\. Revised PDO (as approved by original approving authority) and Key Indicators, and reasons/justification: The Project Development Objectives were not revised\. d\. Revised GEO (as approved by original approving authority) and Key Indicators, and reasons/justification: The Global Objectives were not revised\. e\. Main Beneficiaries: Beneficiaries of Small Hydropower Component Private SHP developers were the direct beneficiaries of the Bank project in terms of funding for investments and building institutional capacities\. The project paved the way for emergence of a new breed of entrepreneurs engaged in generation of power from SHP facilities\. Many such developers in the southern states, who were introduced to the business through the first LoC to IREDA, expanded operations into some of the Northern states, notably Himachal Pradesh\. State power distribution utilities which purchased electricity from small-hydropower plants and electricity consumers at large were the indirect beneficiaries of the Bank project\. With augmentation of generation capacity (nearly 96 MW for 34 commissioned projects) and increased availability of power (estimated at 402 million units per annum ­ valued at over US$50 million annually at prevailing diesel-based generation costs - for 32 of these projects), the economy as a whole benefitted, especially in view of the prevailing acute power shortages\. By mobilizing private sector capital and management expertise into the power sector the project helped diversify energy sources and moderately reduce heavy reliance of the power sector on fossil fuels\. Beneficiaries of Energy Efficiency and DSM Component: The main project beneficiaries were the industries, commercial establishments, communities and other electricity consumers who realized energy cost savings and productivity gains as a result of energy efficiency and DSM investments\. The state distribution companies and the economy as a whole were the indirect beneficiaries of the reduced peak demand resulting from the implementation of the EE projects\. Beneficiaries of Technical Assistance: The project supported numerous training and capacity building activities for energy efficiency stakeholders including central and state government officials, commercial banks, EE consultants, businesses, universities and research institutions and non-governmental organization (NGO) groups\. The awareness building activities carried out under the project also impacted end-users and helped in raising energy efficiency awareness to a broad section of the population\. Institutional strengthening initiatives directly benefited IREDA which had no previous experience with lending for energy efficiency but is now well placed to continue providing finance for these types of investments\. f\. Original Components (as approved): Part A: The Small Hydro component built upon IREDA's experience with the first Renewable Resources Development Project\. It was designed to finance 200 MW of small hydro capacity developed by the private sector\. The target was revised to 153 MW after cancellation of US$26 million of IBRD proceeds which were unlikely to be utilized by the time of project closure\.1 The project was designed to support a range of eligible small hydro project types including (i) Canal-based and dam toe schemes; (ii) Run-of-river schemes; (iii) Rehabilitation and/or upgrading of old plants; (iv) Use of tail ends of cooling water systems of thermal power plants; and, (v) Stand alone micro-hydro sub-projects of up to 100kW each\. Over 80 1Partial cancellation of funding was undertaken twice during project implementation ­ US$ 18 million in June 2005, and US$ 8 million in November 2006\. The closing date of the project was extended by one year on each occasion\. 15 percent of the sub-projects were expected to be categories (i) and (ii) projects, ranging in sizes from 1 MW to 25 MW\. It was recognized during project preparation that some of these categories represented greater risks and would be less economically attractive to developers, but the experience gained would be an important input in mapping out future strategies for promotion of decentralized generation of power\. Part B: The Energy Efficiency/DSM component was designed to provide financing for energy efficiency as a new line of lending business that would complement IREDA's renewable energy financing activities\. The component would cover a wide array of approaches including: (i) design, development and implementation of integrated energy management services operated by ESCOs and end-users on a performance guarantee basis; (ii) end user purchase and installation of energy efficiency and/or load management devices and systems; (iii) production of energy efficient equipment; and, (iv) end-user participation in SEB and other utility-sponsored DSM programs\. Part C: The Technical Assistance component was designed to support IREDA's efforts in the new area of energy efficiency by financing: (i) pre-investment activities to develop a sustainable pipeline of energy efficiency investments, preparation of standard bidding documents for procuring ESCO services, operational and business development modules and information dissemination; (ii) establishing in-house capacity within IREDA to appraise, supervise and promote energy efficiency services and schemes; (iii) assisting participating states in promoting end-use efficiency including development of appropriate policy incentives; and, (iv) training of public and private sector energy and industry officials and staff on energy conservation and DSM\. g\. Revised Components: The components were not revised\. h\. Other significant changes (in design, scope and scale, implementation arrangements and schedule, and funding allocations): There were no significant changes in project design during implementation\. However, the scale of the project was reduced following cancellation of a part of the IBRD loan\. The project closing date was extended by two years\. b) Key Factors Affecting Implementation and Outcomes a\. Project Preparation, Design, and Quality at Entry Soundness of Background Analysis This project was prepared as a follow-up to the India: Renewable Resources Development Project which was instrumental in initiating private sector investments in renewable energy development and in strengthening IREDA's capacity\. The second renewable energy project was specifically focused on providing continued support to the nascent private sector market for small scale power generation, particularly in the Northern states, and to build capacity within IREDA to finance energy efficiency projects\. The prevailing situation where industrial and commercial end-users paid high electricity prices but were unaware or unconvinced of the potential savings through investments in energy efficiency was correctly diagnosed at appraisal\. Accordingly, a key project component was to catalyze an energy efficiency services industry in India by addressing market development barriers and helping develop entrepreneurial initiatives including support for the formation of Energy Service Companies (ESCOs)\. Background analysis also correctly identified the need for overcoming market barriers by strengthening institutional capacities, creating awareness and conducting appropriate studies to support pilot interventions in the area of energy 16 efficiency\. Accordingly, these activities were supported through a Global Environment Facility (GEF) grant\. Assessment of Project Design The project design incorporated lessons from the implementation experience of the first Bank project with IREDA, such as development of a sufficient sub-project pipeline upfront and better estimation of civil works and interconnection costs\. The project also incorporated lessons from the Bank's EE DSM experience as part of the power sector reform loans which identified the need to develop capacity in an Indian financial institution to appraise and finance energy efficiency investments\. The design of all the three components was found to be adequate\. First, the small hydro component allowed IREDA an opportunity to enhance private sector project development capacities, develop new small-hydro project models and diversify its geographical outreach by reaching to the Northern and Eastern states\. Second, the decision to include energy efficiency as a component was appropriate as many of the market barriers to energy efficiency are similar to those for renewable energy\. The flexibility adopted for types of energy efficiency interventions eligible for support proved to be a crucial factor in allowing for implementation of approaches that worked in the Indian context\. Third, the TA design was appropriate for enabling greater awareness about energy efficiency in the Indian industry, examining/testing different approaches for financing efficiency investments, and in creating and strengthening capacities in the market at large and in IREDA to finance efficiency investments\. The TA design was revised at mid-term review to focus on near term market opportunities and reduced its emphasis on certain policy aspects, given the creation of the Bureau of Energy Efficiency (BEE) who assumed the lead role in Indian Energy Efficiency Policy work\. Adequacy of Client Commitment at Entry At the time of appraisal, IREDA had already built a large pipeline of sanctioned loans to be financed under the project\. IREDA had also started building an energy efficiency pipeline in anticipation of a 1998 start date\. This early start in project preparation allowed IREDA extra time in building a portfolio of loans in the new field of energy efficiency\. Assessment of Risks The assessment of risks at the time of appraisal was moderately satisfactory\. While the risk from changes in government policy incentives for renewables was seen as low at appraisal, its actual impact during several years of project implementation was substantial with the lapse of the MNES tariff and the passage of the Electricity Act of 2003\. Additionally, the risks emanating from multi-year variations in hydrology were not envisaged at appraisal, though such risks had a significant financial impact on loans for the sub-projects in Andhra Pradesh\. The assessment of risk was appropriate regarding the nascent stage of ESCO based energy efficiency models and in the case where the demand for energy- efficiency investments did not materialize (or did not translate into bankable projects)\. Indeed, the project was seen as mechanism which could adequately assess and address the risks inherent in implementing such approaches\. b\. Implementation (including any project changes/restructuring, mid-term review, Project at Risk status, and actions taken, as applicable): Initial Delays: The project was initially prepared in 1997-98 but the Board presentation was delayed due to prevailing international sanctions against India\. The project was finally approved by the Board in June 2000 and became effective in January 2001\. In the interim period, some of the identified sub-projects were funded through IREDA resources and the ongoing first World Bank line of credit\. However, disbursements under this second project were slow until the first line closed in December 2001\. The slow initial off-take combined with factors mentioned below affected implementation and eventually led to cancellation of part of the proceeds\. 17 Impact of Change in Policy and Regulatory Environment: The lapse of prevailing government guidelines1 for renewable power purchase tariffs created significant challenges for SHP developers\. Under the Electricity Act 2003 which was adopted several years after project effectiveness, the mandate for Renewable Energy tariff policies was given to state electricity regulatory commissions (SERCs)\. However, in the absence of clear central policy guidelines and inadequate tools to determine the economic cost of renewable energy vis-à-vis conventional power, most states could not swiftly issue new policies, leading to significant regulatory uncertainty for new project developers who were unable to get approval for proposed power purchase agreements (PPAs) for their potential plants\. Several states took this opportunity to terminate and renegotiate existing PPAs to lower levels\. This situation represented significant risk for SHP developers and lending institutions such as IREDA\. Investment decisions and requests for disbursement against previously approved loans were frequently delayed until the regulatory uncertainty was removed\. This problem was slowly resolved on a state-by-state basis over the course of the following three years\. Project development and consequent disbursement by IREDA against the WB LoC increased once future revenue streams, as determined by state-specific regulatory PPA policies, became more secure\. Competition from Commercial Banks ­ Development of a Wider Market: During implementation IREDA faced increasing competition from commercial banks which were now more interested in financing small hydro and energy efficiency projects\. At the time of project appraisal, commercial bank interest, experience, and comfort in these types of investments was quite low, but the demonstrated financial viability of the IREDA investments changed this perception\. The credibility of IREDA's expertise in appraising potential projects became increasingly recognized by the financial sector over the course of the project, and several project developers who had initially applied for IREDA loans were able to obtain financing from other commercial sources with loan applications made stronger by the fact that IREDA sanctioning approval had been obtained\. A total of thirty five sanctioned small hydro and energy efficiency projects representing loans of more than US$ 136 million were dropped from the IREDA sanctioned portfolio during implementation\. Most of these projects obtained financing from other sources and have since been commissioned\. This is evident from a sample analysis undertaken as part of the final evaluation of the project, which revealed that 15 out of 19 of these projects were commissioned, with one additional SHP project currently under construction\. Additionally, several loans were prepaid by project sponsors who were able to obtain lower cost financing than could be provided by IREDA\. While this clearly signaled the "success" of the project in achieving overall goals of lowering barriers for private sector development of EE and RE and in mainstreaming financing for such projects in local commercial banks, it negatively impacted the disbursement of IDA/IBRD funds under the LoC, ultimately leading to partial cancellation of US$ 26 million of the IBRD proceeds which were not likely to be used by the time of project close\. IREDA increasingly lost market share of a growing total market for RE and EE to other competing financial institutions who were able to offer more flexible products and services from local branch offices and who were not bound by many of IREDA's procedural processes\. These processes were criticized by some developers as too cumbersome and bureaucratic\. This experience tested IREDA as an institution, and proved ultimately useful by forcing IREDA to take several steps to improve the attractiveness of its loan offerings, such as revising loan terms and conditions, implementing several actions to streamline its business procedures and reducing documentation requirements\. Institutional and Governance Challenges: For a significant part of the project duration (about two and a half years) the position of Managing Director (MD) of IREDA was vacant\. This affected the overall governance arrangements at IREDA, hampering institutional responsiveness in an increasingly competitive market\. However, in June 2007 the MD post was elevated to that of Chairman and Managing Director (CMD) and the acting MD was formally appointed to this post\. Soon after, the vacant post of Director (Technical) was also filled, and three Independent Directors were appointed to the IREDA board which was 1The MNES guidelines were issued in 1994 and recommended a set rate of Rs\. 2\.25 per unit with a provision for escalation of 5% per annum for 10 years\. 18 a positive step in increasing IREDA operational independence from the Ministry of New and Renewable Resources, which continues to be the principle shareholder of IREDA\. With these changes IREDA governance structure is much improved and oriented in a more commercial fashion\. Impact of Natural Causes: Natural causes also had a negative impact on the project\. Six hydro sub projects were implemented in AP, a state which faced drought conditions for three years from 2001-02 to 2003-04\. Consequently, these projects experienced a severe decrease in available discharge levels, leading to severely reduced opportunities to generate power, earn revenue and service debt\. Not surprisingly, all of these projects were soon classified as non-performing assets (NPAs)\. In 2001-02, IREDA funded interest requirements and added the interest funded to the principal outstanding for these projects and revised their loan repayment schedules\. The drought conditions persisted through 2002-03 and 2003-04\. As a result of all of these events, IREDA came up with a restructuring package for these projects in 2005/6, and now all of the project sponsors are now servicing their loans in a timely manner\. This temporal concentration of NPAs is a not unexpected outcome for a non-banking financial institution which is insufficiently diversified across sectors and geographic locations\. While increased IREDA lending in other states and for other types of projects such as wind and energy efficiency will help mitigate future portfolio risk, IREDA will always carry higher levels of exposure to natural disasters due to the composition of its lending portfolio which supports its mission\. Implementation of the GEF TA Program (TAP): The GEF Technical Assistance Program (TAP) was closely monitored and modified to respond to changing conditions, most notably the formation of the BEE and the reduced prospects for utility-led DSM\. With the establishment of the BEE, initial TAP work was undertaken to support BEE policy activities such as technical support for issuance of new codes and standards\. As the BEE become more established, this policy support was no longer identified as a priority, and TAP activities were refocused on other EE market and pipeline development tasks, including an increased focus on increasing financial sector capacity to lend for EE\. The GEF TAP also provided support to IREDA for a package of strategic assignments in the areas of new business development for IREDA, resource mobilization and organizational restructuring to enable better response to increasing competition in the Indian market for clean energy financing\. c\. Monitoring and Evaluation (M&E) Design, Implementation and Utilization: M&E Design The M&E plan for the project comprised of targets that were linked to achievements of different project outputs\. This included a capacity addition target of 200MW of small hydro sub-projects (revised to 153 MW); commissioning energy efficiency sub-projects that had measurable energy and capacity savings; and developing a sustainable energy efficiency portfolio and institutional capacity through the TAP\. This plan focused on monitoring and regular reporting of the progress in achieving the PDOs and project outputs through quarterly progress reports (QPRs) from IREDA, annual reports, energy audits, and direct feedback from relevant stakeholders\. During the mid-term review and in subsequent missions the M&E design was further strengthened to include additional key indicators, as targets were not specified for some of the key project objectives\. Measurable indicators for the TA component were designed and an accompanying implementation plan with expected outputs and timeframes was agreed on\. In addition, it was agreed to strengthen and streamline the information provided in the QPRs by adding an analysis of the critical areas of concern and a detailed implementation plan to address these\. IREDA built and strengthened its overall M&E systems during the course of the project\. M&E Implementation: Targets for some of the project outcomes were not clearly defined at the beginning of the project\. This was addressed by laying out action plans with timeframes\. Corrective actions were taken when needed to revise action plans and timeframes for delivery\. 19 M&E Utilization: QPR formats were revised during implementation to improve their effectiveness and identify the need for corrective action\. M&E information from QPRs was used to provide feedback to IREDA on issues pertaining to project implementation, sectoral performance, contribution of the projects to the installed capacity of hydro projects, development of capacity in the energy efficiency sector, and to review outcomes of the project\. This information helped IREDA/GoI and the Bank team maintain focus on key outstanding issues and their timely resolution, which enabled successful achievement of project development objectives\. d\. Safeguard and Fiduciary Compliance (focusing on issues and their resolution, as applicable): Environmental Safeguards: The primary focus of safeguard compliance for the small hydropower (SHP) sub-projects was managing adverse impacts on the water environment and sensitive areas such as forests\. The potential negative impacts on air quality was the key issue to be addressed for the energy efficiency projects\. Another common theme during implementation of subprojects in both types of projects related to ensuring sufficient worker and site safety\. IREDA sub-projects were fully compliant with environmental safeguards and it is noted that IREDA proactively improved its internal systems to ensure compliance\. A separate environmental audit of the small hydro projects was undertaken during implementation and key recommendations of the audit were adopted by IREDA through the development of a more streamlined project appraisal process\. Though this system could not be used on any of the sub-projects under the operation as they were developed before the audit was completed, the system will be a very useful tool for IREDA in the future especially as larger hydropower projects are pursued as part of the new business strategy\. Pre-disbursement (post-sanction) inspections were used to encourage the project developers to improve on-site environmental management\. In several small hydro locations, good practices on environmental management were noted indicating sensitized project developers\. Some of the observed developer practices included tree plantations within the project sites, innovative arrangements for debris disposal, and changing design of intake weir to have better control on minimum downstream flow requirement\. Common shortcomings included limited attention to workers' safety during implementation and delays in obtaining regulatory clearances, especially from pollution control boards\. Social Development aspects: Overall, the approach of SHP developers in encouraging effective community involvement has been positive\. Provision of employment opportunities for local people, tree planting, provision of education, and support for recreational activities have been undertaken by several SHP developers as part of their business practices\. Proactive efforts to enter into active partnerships with local communities fully respecting their needs is noted as a positive attribute of several of the SHP developers\. Land acquisition for SHP involving common lands has been a bottleneck issue, particularly in states like Himachal Pradesh, and has been highlighted as an area requiring policy level attention\. Financial Management: FM arrangements from a fiduciary perspective under the project were implemented in a satisfactory manner\. The project management report (PMR) formats designed at the appraisal stage were found to be cumbersome during implementation and were therefore refined in the second year\. Thereafter, these were submitted on a regular basis, albeit a little delayed in a few instances\. Entity audits were regular and did not contain any major accountability issues\. Project audits for the IDA credit, GEF grant and IBRD loan were also submitted in time\. Consolidated reporting for the three funding sources (IBRD, IDA, GEF) was done for the financial statements from 2006-07 onwards\. Procurement: Procurement undertaken by IREDA and its borrowers under the project was largely satisfactory\. Procurement of TA services and goods under GEF funding was also satisfactory, although several activities experienced long procurement-related delays\. There was considerable delay in awarding the contract for the installation of an improved FM system and loan accounting system for IREDA\. This 20 was due to several reasons cited in the aide memoires, and at the end of the project this activity still remains incomplete\. e\. Post-completion Operation/Next Phase (including transition arrangement to post- completion operation of investments financed by present operation, Operation & Maintenance arrangements, sustaining reforms and institutional capacity, and next phase/follow-up operation, if applicable) Sustainability of sub-projects funded under the project: Of the 44 SHP sub-projects funded under the World Bank LoC, 34 have already been commissioned and the remaining 11 are expected to be commissioned by March 2009\. Of the 12 energy efficiency sub-projects supported, 11 have been commissioned and the remaining one sub-project is expected to be commissioned by December 2008\. Despite the cost and time escalations in several cases, and lower capacity utilization factors due to vagaries of hydrology in hydro sub-projects, it is seen that financial rates of return based on actual cost and generation data is higher than the cost of capital\. The private developers have an adequate incentive to ensure appropriate operations and maintenance of these sub-projects\. As a result, no significant post- completion operational issues are anticipated\. Institutional and Financial Sustainability of IREDA: IREDA has matured as a financial institution during the course of implementation of the two Bank projects, having financed over 200 projects in renewable energy and energy efficiency\. IREDA is the lead "green energy" financial institution in the country and has won both regional and international recognition\. IREDA's institutional capabilities have been enhanced significantly during this period in resource mobilization, disbursement and maintaining portfolio quality (as further detailed in Annex 10)\. As a result of the strategic change consultancy studies, IREDA has a clear business development strategy which has been approved by the IREDA Board which, if successfully implemented, will allow IREDA to continue its leadership role in promotion and development of the RE and EE sectors\. In additional to expanding lending in familiar areas such as small hydro and wind, IREDA will also pursue financing opportunities for medium sized renewable energy projects, supply-side efficiency, niche end-use energy efficiency projects (such as waste heat recovery), biomass gasification for thermal applications in industries, and solar photo voltaic projects\. As recommended in the strategic change studies, IREDA is also engaging with other financial institutions for consortium financing of larger projects\. Increased outreach to other specialized financial institutions such as Power Finance Corporation (PFC) has helped forge new partnerships\. While IREDA was not successful in sourcing additional low cost funds from the domestic market, new resources are being mobilized from international sources, including Asian Development Bank (ADB), European Investment Bank (EIB), KfW and others\. As a result, the institutional gains over the course of the Bank-financed project are expected to sustain and expand going forward\. Next Phase / Follow-up Operation: Rising global and local environmental concerns together with recent rapidly escalating fossil fuel prices have led to increased support for energy efficiency and renewable energy development and consequent increased demand for financing of these investments\. The Government of India has also made a clear and strong commitment to support scaling-up of renewable energy and energy efficiency, most recently as part of the special missions under the National Climate Change Action Plan (2008)\. In this context, the enabling policy and implementation environment for clean energy is likely to become increasingly stronger, further supporting IREDA's future prospects for lending\. As a market leader in renewable energy financing, IREDA has built a unique capacity in this growing market that sets it apart from other financial institutions now entering the field\. IREDA has also built up its capacity in energy efficiency financing and is also developing in-house carbon financing knowledge and 21 skills\. IREDA has recently signed partnership agreements with larger institutions such as the Power Trading Corporation (PTC), Power Finance Corporation (PFC) and the Infrastructure Development Finance Company (IDFC) to structure and co-finance projects, which represents further evidence of the value these institutions place on IREDA's capacity and experience\. IREDA had previously focused on financing smaller sized projects (1-10 MW) but is now focusing its attention on larger projects as well, as was suggested by the outputs of the WB-supported strategic change TA provided under this project\. Among the recent new flagship projects is the loan for the 100 MW Tata Power Wind Project, co-financed by IREDA and the private sector operations arm of the ADB\. There is a need for further financial support to IREDA at this critical juncture as it forges new partnerships and pursues larger projects, which could be an opportunity for a new engagement between the World Bank and IREDA\. While the Indian market for commercial finance of clean energy investments has experienced rapid expansion, there remain several areas which are not being served by the commercial finance market\. These areas including geographic zones such as in the Northeast where the level of private sector investment in RE and EE is low, new business models that have the potential to become commercial, and more complex project and financial structures\. The ICR team recommends that the Bank engage with IREDA and the Government to discuss and develop possible options for a new operation aligned to the new IREDA business strategy and changing investment climate for clean energy\. This recommendation is consistent with recent CAS discussions on the sustainable growth pillar, whereby the Bank has stated that it will assist the GOI to access additional funding for measures that further reduce GHG emissions\. c) Assessment of Outcomes a\. Relevance of Objectives, Design and Implementation (to current country and global priorities, and Bank assistance strategy): The project objectives and design are considered to be highly relevant to the current national priorities and the Bank assistance strategy\. The Government of India has placed a strong emphasis on clean energy development and climate change as evident from the passage of the Energy Conservation act of 2001 and the recently announced "National Action Plan on Climate Change\." The objectives of the project are fully consistent with Bank's 2004 CAS that supports partnerships for Global Environment and promotes private sector led growth by provision of infrastructure\. The project also supports Millennium Development Goal 7: Ensuring Environmental Sustainability\. b\. Achievement of Project Development Objectives and Global Environmental Objectives (including brief discussion of causal linkages between outputs and outcomes, with details on outputs in Annex 4): PDO-(a): Augment power supply through environmentally sustainable small hydro investments The project was successful in augmenting power supply through environmentally sustainable small hydro investments and mobilizing private sector investments in renewable energy power projects\. The World Bank has supported 45 sub projects with an installed capacity of 158\.25 MW through the second line of credit\. Of these, 34 sub projects have been commissioned with installed capacity of 95\.65 MW and 11 sub projects with installed capacity of 62\.60 MW are expected to be commissioned by March 2009\. During the project a number of regulatory developments at the central and state levels occurred that now provide a good enabling environment for the development of SHP\. Nineteen states have specific policies for SHP, 10 states have notified feed-in tariff orders for SHP, and MNRE has announced a new capital subsidy scheme to further support SHP\. The total SHP capacity in the country exceeds 2100 MW as of March, 2008 and the target for capacity addition of SHP for the Eleventh plan is 1400 MW\. 22 Out of the total capacity of 536\.7 MW installed during the Tenth plan, this project directly supported 95\.65 MW\. Sub-projects that dropped out of the project but were completed with financing from other sources contributed another 38 MW\. Hence, the project supported about 25 percent of the planned SHP additions during this period\. PDO-(b): Mobilize private sector investments in renewable energy power projects Emergence of a Strong Segment of Private Sector SHP Developers: The project provided lending to 23 SHP entrepreneurs at a time when funding from other sources was not readily available\. The successful implementation of these projects has led to some of these entrepreneurs leveraging their initial success to then set up multiple projects in the same location\. It has also instilled confidence by certain developers previously only focused on local prospects to implement projects in new states, as was demonstrated when entrepreneurs from Andhra Pradesh successfully set up SHP plants in Northern states\. In some cases large SHP players have also used the second LoC to develop expertise in project implementation and plant management\. Increased Development of SHP sub-projects by Private Sector: Initially, all most SHP projects were in the public sector in India\. IREDA was a pioneer in fostering private sector based hydro development and, at present almost all such projects are developed by private sector developers\. Increased Financing of SHP sub-projects by Commercial Banks: The sub-projects funded under Bank line of credit took loans from IREDA at commercial terms or higher, and did not crowd out financing from the commercial market\. In fact, the success of World Bank-IREDA funded schemes aroused greater interest from commercial banks, leading to the gradual emergence of a more competitive market for funding SHP schemes\. As noted earlier, some of the project developers originally assisted by IREDA took up additional schemes with funding from other commercial sources\. IREDA, however, is still widely recognized for its strength in appraising SHP sub-projects and a number of the commercial banks do not have the required expertise\. Therefore, larger financial institutions have started partnering with IREDA through consortium financing to utilize IREDA's expertise in evaluation of projects which combines well with their larger loan limits and lower costs of funds\. This has allowed IREDA to finance medium and large scale hydro projects\. PDO-(c): Promote energy efficiency and demand-side management (DSM) investments Energy Efficiency Investments under the Project: The project was also successful in promoting energy efficiency and demand-side management (DSM) investments which further augmented power supply\. Seventeen energy efficiency projects included in the portfolio at the time of project close are in various stages of implementation, financed by the project and IREDAs own resources representing over 90 MW in additional capacity / avoided peak demand\. These projects have been financed by over US$ 36 million directly disbursed for EE investment at the time of project close\. The total amount of investment for IREDA's energy efficiency loan portfolio, including sponsor's equity contributions and other cofinancing, will exceed $74 million1 once final commissioning is complete\. Twelve of these projects have been commissioned by project close, and the estimated savings projected for these projects is 249 million kWh equivalent per year\. Commercial Bank lending in Energy Efficiency: Based on IREDA's experience in energy efficiency financing, several local banks have also launched loan programs for energy efficiency\. Five banks, namely State Bank of India, Canara Bank, Union Bank, Bank of Baroda and the Bank of India, have launched new lending schemes for energy efficiency\. 1A fixed exchange rate of Rs\.44\.83 per US $ was used to calculate US $ contributions made by borrower/project sponsors across the project timeline\. 23 Enhanced Policy Environment and Institutional Support for Energy Efficiency The Energy Conservation Act, 2001 was a critical milestone for energy efficiency in India\. The Bureau of Energy Efficiency (BEE) was established as a statutory body under the Ministry of Power to plan, implement and monitor the various programs under the Act, including standards and labeling programs, certification and accreditation for energy managers/auditors, energy efficiency policy research, awareness and development and implementation of energy efficient building codes, among other activities\. Increased availability and utilization of energy efficiency interventions: Successful lending for EE sub- projects by IREDA demonstrated the financial viability of such investments, leading to increased acceptance and financing by both the concerned industries and by the commercial banking sector\. For example, waste heat recovery systems were few in India prior to the implementation of the investments under the project\. However, this option is now widely accepted as viable throughout the industry\. Annex 11 presents a good example of how financially sick enterprises units can be revived with effective deployment of energy efficiency measures\. Many activities supported under the GEF TAP provided support for the increased use of EE in numerous sectors through market awareness and demonstration activities GEO: Enhance and sustain improved end-use energy efficiencies with consequent reduction in carbon emissions The activities supported under the GEF TAP were able to successfully provide institutional development support to IREDA to create and expand the new line of business of energy efficiency lending, increase broader awareness and capacity for EE, and increase market development for increased energy efficiency investments, by both IREDA and the commercial banking sector\. While the initial project included a specific focus on ESCO development, this mechanism has not achieved widespread success in the Indian context\. ESCOs in India face a number constraints including inability to prepare bankable projects, limited legal and contractual capabilities, poor contract enforcing environment, poor balance sheets and limited experience and expertise in structuring projects with adequate payment structures\. Nevertheless, the ESCO activities under this project have provided valuable initial experience, and will support future BEE programs in this area\. The total estimated energy and CO2 savings which will be achieved assuming successful commissioning of the projects under implementation is 6\.70 million tons of CO2 reduction\. c\. Efficiency (Net Present Value/Economic Rate of Return, cost effectiveness, e\.g\., unit rate norms, least cost, and comparisons; and Financial Rate of Return): SHP Sub-projects Financial Analysis: At appraisal, the FIRRs of 14 sub-projects in the project pipeline were calculated to be in the range of 22\.0 to 40\.1 percent\. On project completion, FIRRs for 24 of the sub-projects funded under Bank line of credit (for which actual generation data could be obtained) were found to range between 15 and 51 percent\. The FIRRs for the same sub-projects at the time of loan sanction were calculated to be in the range of 15 to 56 percent\. Project unit costs for eighty percent of the projects ranged from US$ 960/kW to US$ 1526/kW but there were projects with costs as low as US$607/kW and as high as $1857/kW as well\. The wide variation in unit project costs is on account of the locations and types of SHP projects implemented and to a small extent on exchange rate discrepancies\. Economic Analysis: At appraisal, the EIRRs of 14 sub-projects in the project pipeline were calculated to be in the range of 20\.5 to 51\.3 percent\. On project completion, EIRRs for 23 of the sub-projects funded under Bank line of credit (for which actual generation data could be obtained) were found to range between 27 - 224 percent in all cases higher than the hurdle rate\. The EIRRs for the same sub-projects at the time of loan sanction were calculated to be in the range of 21 to 47 percent\. 24 EE Sub-projects Financial Analysis: At appraisal, the FIRRs of 16 sub-projects in the indicative pipeline were calculated to be in the range of 26 to 158 percent\. On project completion, FIRRs for 5 of the sub-projects funded under Bank line of credit (for which actual generation data could be obtained) were found to range between 11 and 91 percent\. The FIRRs for the same sub-projects at the time of loan sanction were calculated to be in the range of 26 to 51 percent\. Economic Analysis: The Economic rates of returns (EIRRs) were calculated for a sample of projects and found to range between 53 and 238 percent\. Although a one on one comparison with appraisal estimates was not possible due to the rapidly changing portfolio, this compares well with the appraisal estimates of a range of 26-155 percent for a different sample of projects\. d\. Justification of Overall Outcome and GEO Outcome Rating (combining relevance, achievement of PDOs/GEO, and efficiency): The project was and remains highly relevant to GoI priorities, and was successful in achievement of the development objectives\. The project has had a positive impact in increasing private sector financing of renewable and energy efficiency projects\. Rating: Satisfactory e\. Overarching Themes, Other Outcomes and Impacts (if any, where not previously covered or to amplify discussion above): Emergence of a wider market for financing RE and EE projects IREDA's pioneering role in financing private sector renewable energy and energy efficiency projects has been instrumental in stimulating the interest of other commercial financial institutions to enter this sector\. Numerous commercial banks are now active in financing renewable energy and energy efficiency projects through existing financial products, and five have launched new specific schemes to finance energy efficiency investments in SMEs\. IREDA's internal procedures in issuing new loan products are often less flexible than those utilized by the domestic financial market participants, although IREDA has been able to increase the variety and competitiveness of its loan products and has streamlined its procedures\. However, as a publicly owned nonbanking financial institution, it will be extremely challenging for IREDA to match the offerings and flexibility of the commercial financial markets\. IREDA must therefore focus on areas where it has comparative advantages\. Poverty Impacts, Gender Aspects, and Social Development Employment: Almost all of the hydro sub projects employ workers from neighboring villages\. Because these sub projects are located in remote areas where fewer avenues for regular employment exist, they offer the local people one an attractive employment opportunity\. These projects can offer unskilled labor wages of up to Rs\. 3,000 per month, Rs\. 4,000 per month in case of semi-skilled and up to Rs\. 5,000 per month for highly skilled workers\. The SHP portfolio provided direct employment to approximately 700 people\. Tree Plantations: Most SHP projects located in the hills require some cutting of trees during construction\. Although the SHP developers pay compensation to the Forest Department, many also plant additional saplings as part of project construction\. Afforestation not only improves the aesthetics of the project site, it also reduces the frequency of land slides\. Once developer has planted more than 3500 trees over the past 3 years and has plans to add another 1000 by the end of 2008\. 25 Education: Provision of support for education as a local contribution to the community is quite common for SHP developers\. This can include support to local village schools through infrastructure provision, supplies for poor children (books and uniforms), or other contributions such as direct contributions or sponsorship of events\. Roads: Since most of the SHP sites are located in remote areas, there was a need to construct roads to transport materials and equipment to the project sites\. This has benefitted the local communities by increasing accessibility\. Forty four sub projects contributed to the development of almost 90 km of roads and bridges, further improved accessibility to neighboring villages\. This has had a positive developmental impact, as some of these villages, especially in the hilly areas of Himachal Pradesh, were completely inaccessible before\. Institutional Change/Strengthening (particularly with reference to impacts on longer-term capacity and institutional development): The World Bank loans have assisted IREDA in establishing itself as a leading Indian institution providing financing for renewable energy and energy efficiency projects\. In particular the Technical Assistance Plan has enabled IREDA to strengthen its capacity in knowledge management and improved IT systems, energy efficiency knowledge, procurement and safeguards, and evolution of a corporate strategic vision through the strategic change consultancy\. A credit risk rating system was also designed and implemented under the TAP to allow for improved risk based evaluation of proposed projects\. IREDA now has a much stronger governance framework with post of Managing Director elevated to Chairman and Managing Director, appointment of Director (Technical) and three Independent Directors, and the strengthening of audit committee\. Most of the recommendations of the strategic change consultancy are being implemented by IREDA\. These include increased business focus on consortium financing, medium hydropower projects, waste-heat recovery projects\. While IREDA was not able to source low cost funds from the domestic market, new sources of financing have been identified from bilateral and multilateral sources\. As a result of these initiatives as well as addressing some of the key gaps in its operations, IREDA has been able to improve its overall financial and operational performance\. Its disbursements have shown about 35 percent growth for the last two years and Non-Performing Assets have been reducing, leading to better profitability\. Other Unintended Outcomes and Impacts (positive and negative): Local Area Benefits of SHP Sub-projects: Almost all of these sub projects are located in remote areas and have a positive impact on the local economy through net cash inflow into the region whereby the local population gets more livelihood opportunities and the local businesses are called onto deliver more services for construction, and logistical support and material for regular O&M\. f\. Summary of Findings of Beneficiary Survey and/or Stakeholder Workshops (optional for Core ICR, required for ILI): Not Applicable\. d) Assessment of Risk to Development and GEO Outcome Rating for Risk to Development Outcome: Low 26 Rating for Risk to GEO Outcome: Low The overall risk to the development outcome and the global environment outcome is rated low on the basis that the project sub-projects components have been successfully commissioned\. e) Assessment of Bank and Borrower Performance (relating to design, implementation and outcome issues) a\. Bank Performance Bank Performance in Ensuring Quality at Entry (i\.e\., performance through lending phase): Rating: Satisfactory The project was, and remains strategically relevant to Government priorities including reduction of infrastructure bottlenecks and the development of renewable energy and energy efficiency in the country\. Quality at entry was satisfactory and the implementation arrangements building on lessons learned from the Renewable Resources Development Project were appropriate and consistent with the Bank's fiduciary role\. There were minor shortcomings associated with the approval of the second project while the first was still effective, which led to low initial disbursement under the second line\. Quality of Supervision (including of fiduciary and safeguards policies): Rating: Satisfactory The Bank team played an active and effective role in the supervision of this project during the course of implementation, and proactively provided support to address implementation problems as they arose, including disbursements concerns, changes in IREDA management structure, and support for IREDA Strategy & Action Plan study which helped define IREDA's future role, financing strategy and improved organization structure /business processes\. At least eleven supervision missions were undertaken by the Bank\. Corrective actions were taken when needed to ensure achievement of the PDOs, including partial cancellation of the IBRD loan, realignment of the GEF technical assistance component to meet changing needs and refining project monitoring indicators\. A number of field visits were undertaken to ensure compliance with safeguards, and to verify physical progress and achievements\. The Bank's input to the Strategy and Action Plan was highly valued by IREDA, and has led to institutional improvement and robust prospects for continued IREDA lending to RE and EE beyond the project close date\. Justification of Rating for Overall Bank Performance: Rating: Satisfactory For the above cited reasons, the overall rating of the Bank performance is rated Satisfactory b\. Borrower Performance Government Performance: Rating: Moderately Satisfactory The performance of the government counterpart Ministry of New and Renewable Energy (MNRE) was moderately satisfactory\. The power sector in India underwent dramatic change during the project implementation period with the passage of the Electricity Act and the establishment of SERCs\. Prior to the passage of the Act, the Ministry had issued recommended guidance on state-level power purchase prices for grid-connected renewable energy, guidance which expired in 2004\. No additional central guidance was given to the individual SERCs who were reexamining their policies on grid connected renewables\. As a 27 result, developers were subject to significant new regulatory risks as new PPAs were not approved and several states began reexamined existing PPAs\. This negatively impacted the project as developers who had sanctioned or signed loans from IREDA delayed their project construction schedules until their PPAs were approved\. Numerous projects were delayed or dropped due to this change in the enabling environment\. The project was also affected by the two plus year delay in filling the vacant position of Managing Director of IREDA which negatively affected the decision making capacity and strategic vision for the organization\. On the positive side, the Bureau of Energy Efficiency (BEE) was established by Ministry of Power after the project had been effective, and while it was not a formally a project counterpart in project design, it did provide effective coordination and collaboration with relevant EE activities supported by the GEF TAP\. During the last two years of implementation, the MNRE provided significantly improved levels of support to IREDA and to the World Bank project\. The governance arrangements at IREDA have been strengthened under the direction on MNRE, the strategy and action plan for IREDA has been accepted by the ministry and IREDA has been extended support on various steps towards implementing its plan\. Implementing Agency or Agencies Performance: Rating: Satisfactory IREDA consistently demonstrated a strong commitment to fulfilling the project development objectives and provided adequate internal staff and resources to ensure implementation success despite the difficult enabling environment changes which were outside of its direct control\. It complied with all Bank loan covenants and discharged its fiduciary duties in a satisfactory manner\. The quality of supervision support by IREDA technical officers was high, and their intensive efforts in following up with the individual promoters was a key factor for ultimate project success\. IREDA was able to alter its policies and lending norms to adapt to changing market conditions, although this was done at a pace that could not match the changes in the local financial markets, and several sanctioned projects ultimately were taken up by local FIs which could offer more competitive projects\. IREDA has adopted many of the recommendations from the Strategic Change Consultancy, which has improved its prospects for the future\. The major shortcoming of IREDA during project implementation was the slow pace of reimbursement processing and the slow pace of procurement per WB guidelines for activities funded by the GEF TAP, although this showed some improvement by the time of project close\. Justification of Rating for Overall Borrower Performance: Rating: Moderately Satisfactory Per the World Bank ICR Ratings guidelines, the overall borrower performance is rated as moderately satisfactory\. f) Lessons Learned (both project-specific and of wide general application) Overall Lessons: Need for Transition Strategy of Supported Institutions if Project Goal includes increased commercial finance Lesson 1: Transition Strategy Upfront consideration must be given to a transition strategy for World Bank projects supporting RE/EE lending thorough a specialized financial institution to address the future commercial bank competition that will inevitably arise from successful project implementation\. Future challenges often include both direct financial challenges as the commercial market is often able to provide lower cost funding at more flexible terms, capacity challenges including how to retain public sector staff once the private sector enters the market, and institutional challenges, as new directions are needed once original objectives have been met\. 28 Lesson 2: Technical assistance to commercial financial institutions is an important element of building institutional capacity to mainstream knowledge regarding clean energy market development: In order to adequately scale up lending for renewable energy and energy efficiency, the local banking sector must be an active participant\. TA support can increase knowledge of the technical, policy and regulatory aspects of this market to allow improved understanding of sector risks when providing debt financing for such projects\. Therefore, awareness and capacity building of commercial financial institutions for clean energy market development projects should be incorporated into initial project designs, even when primary lending activity is channeled through a single intermediary\. Lessons on Renewable Energy (SHP) Development: Lesson 3: A predictable policy and regulatory environment is a critical precondition for private sector led RE development: Having a supportive policy environment, including transparent, predictable feed-in tariffs and policy decision making, is critical for private sector led development of small-medium hydropower projects\. Other favorable policies which could further support the development of the RE sector if adopted include facilitation of developer access to land, and adoption of transparent and timely technical and environmental clearance processes by local regulators\. Lesson 4: Economic Valuation of Renewable Energy vis-à-vis Conventional Energy can provide significant policy and regulatory insights\. Establishment of a suitable policy and regulatory environment for renewable energy can be hampered due to the lack of adequate tools and skills in assessing the full economic value of renewable energy power provided to the grid\. In addition to the direct power benefits, renewable energy can also produce other benefits such as local and global environmental benefits, improvements in energy security, fuel risk mitigation through diversification, technology development, and modularity that need to be fully understood in the Indian context\. Projects which provide financing for RE projects would be well served by providing complementary analytic support to regulators to strengthen policy making and the resulting enabling environments\. Lesson 5: Development of adequate power evacuation infrastructure is essential\. One of the most crucial issues and/or potential barriers in the scaling up development of large and small hydro plants is the interconnection between the plant and the nearest grid point to maximize the power usage\. Providing grid extension up to the SHP plants based on an integrated basin development approach is one solution which should be considered when encouraging hydropower development\. Lesson 6: Inherent risks in SHP sub-projects need suitable mitigation measures SHP sub-projects can be extremely vulnerable to unforeseen variations in hydrology, especially in the first few years of commissioning\. Adequate risk coverage/insurance products could be built in the business model to mitigate such risks for both the developers and lenders\. Lesson 7: SHP entrepreneurs are eager to expand in scale as well as geographically and can do so if given sufficient support Significant entrepreneurial capacity for SHP sub-projects has been developed during the two World Bank renewable energy projects in India\. The twenty three SHP developers supported under the second project have gradually increased both their number of plants in operation and the average size of their newly constructed plants\. This increased private sector capacity has produced many indirect benefits, and can be further harnessed for future efforts in the country\. Demand remains strong only for grid-connected run-of-river and dam-toe business models and there is limited private sector in other models\. Lesson 8: Scaling-up manufacturing and turnkey EPC contracting capacity is crucial This was noted as a bottleneck for small hydro development in India and developers have started importing equipment as the delivery time offered by Indian manufacturers is excessive\. In India in the hydro sector, there are very few integrated EPC contractors\. Contracts are usually split between civil construction and plant and machinery installation, which makes negotiation of EPC contracts relatively complex\. Therefore there is a need to 29 address functional, technical and price related aspects across contracts\. Otherwise, developers may face the risk of time and cost overruns and lower profitability\. Lesson 9: Developing Capable Institutions is a time-intensive process and once developed they should be leveraged to achieve greater impact Bank support to IREDA in course of this and the previous project has helped develop IREDA into one of the strongest renewable energy development institution in the country and in the region\. The Bank's support in strengthening fiduciary and safeguard functions, governance arrangements and strategic vision for the institution, especially towards the later half of this project, have further strengthened IREDA\. The GoI can now leverage the institutional capacities and sector development vision offered by IREDA to further the renewable energy development and climate change mitigation objectives in the country\. Lessons on Energy Efficiency and Demand Side Management: Lesson 10: Financial Intermediation projects which fund EE should allow for development of different business models Different energy efficiency business models should be tried out to allow maximum flexibility in achieving desired outcomes given the constant shifts in market conditions\. In India, end-user implemented approaches have been more successful when compared to ESCO and DSM type projects\. The flexibility in project design enabled numerous types of EE eligible products to be financed under the LoC, which also let IREDA focus its efforts on more promising market segments, such as waste heat recovery and cogeneration, while shifting time and internal resources from sectors where business was less likely to materialize\. Lesson 11: Smaller EE projects face different market barriers and may be best reached through alternative instruments: Large companies with access to information, technical consultants and finance find it less difficult to implement EE projects either with IREDA financing or through other sources when compared to the SME sector\. SMEs face several additional market constraints and barriers\. The lack of local branch offices of IREDA made communication with smaller SME units difficult under the project, and relationships were often complicated by the presence of existing SME lending relationships with local banks\. Future efforts designed to finance EE at SMEs should work through local financing institutions which may be better placed to expand EE lending to this sector\. g) Comments on Issues Raised by Borrower/Implementing Agencies/Partners (a) Borrower/implementing agencies: Evaluation of the project by IREDA (as reflected in the completion report prepared by them) is consistent with that of the Bank\. The ICR prepared by IREDA is included in Annex-7\. Comments were also received from IREDA on minor edits in the draft ICR\. These comments have been appropriately incorporated in the final ICR\. (b) Cofinanciers: (c) Other partners and stakeholders (e\.g\. NGOs/private sector/civil society): 30 ANNEXES Annex 1\. Project Costs and Financing (a) Project Cost by Component (in USD Million equivalent) Component Category Appraisal Actual/Latest Percent Estimate for Estimate (for of Cost, including 206 MW1) Appraisal Contingencies (US$ M)2 (US$ M) a\. Small Hydro Investments: Physical Run-of-River (100MW) 155 106 68\.39 Canal falls/Dam-toes (65MW) 75 63\.3 84\.40 Thermal cooling water tail-ends 33 2\.7 8\.18 (20MW); plant upgrading & rehabilitation (10MW); stand-alone microhydros (5MW) Sub-Total 263 210\.14 79\.90 b\. Energy-Efficiency (EE) Physical 30 42\.23 140\.77 Investments: by industrial, commercial, utilities, ESCOs, equipment vendors3 c\. Technical Assistance Pre-investment activities: EE Implementa- 2 2 100 investment pipeline; business tion support development & procurement models Strengthening of IREDA's in-house Capacity & 3 1 33 capacity in project appraisal, institution monitoring and promotion of EE building Policy development for private sector Policy 1 1 100 investments in ESCOs and DSM support Program outreach and training Capacity 1 1 100 building Sub-Total 7 54 97\.00 Total Project Cost 300 257\.37 85\.79 1Actual costs for 95\.65 MW SHP already commissioned, and latest estimates for 62\.60 MW under implementation; also includes costs of estimated capacity of EE sub-projects supported by the LoC of 47\.41 MW\. 2A fixed exchange rate of Rs\.44\.83 per US $ has been used to calculate US $ contributions made by borrower/project sponsors across the project timeline\. World Bank contributions, however, are based on actual US$ disbursements made throughout the project, in real terms\. 3Estimate for EE is higher than originally projected because the EE portfolio included more projects than originally envisaged, and commercial banks took up some projects for which initial disbursements were made\. 4During the period of implementation of this project, other donors financed a large number of activities (in particular USAID), reducing the identified requirements\. Notable is the USAID's Energy Conservation and Commercialization Project that provided US$ 25 million in assistance during 2000-08\. 31 (b) Financing Appraisal Actual/Latest Percent of Estimate Estimate Appraisal Source of Funds (US$ M) (US$ M) 1 Borrower 165 145 88 International Bank for Reconstruction and Development (IBRD) 80 54 68 International Development Association (IDA) for small hydro investments 30 36\.44 121 International Development Association (IDA) for EE investments 20 16\.93 85 International Development Association (IDA) Total 50 53\.37 107 Global Environment Fund (GEF) 5 5\.00 100 Total 300 257\.37 85\.79 1 A fixed exchange rate of Rs\.44\.83 per US $ has been used to calculate US $ contributions made by borrower across the project timeline\. World Bank contributions, however, are based on actual US$ disbursements made throughout the project life cycle in real terms\. 32 Annex 2\. Outputs by Component The project objectives were satisfactorily achieved, although the project required two one-year extensions and a partial cancellation of IBRD funds\. While the outputs under the different project components were fully satisfactory, the implementation of the project was affected by extraneous factors which resulted in the cancellation of part of the proceeds\. The allocations for small hydropower sub-projects and energy efficiency sub-projects were notional in the project design as where the allocations for the different SHP business models Table 2\.1: Component-wise Loan / Grant Utilization Component Estimated Actual Remarks Utilization Utilization (US$ M) (US$ M)1 Component A ­ Small Hydropower 263 210\.14 Although the LoC was Investments open to different types of (i) Canal-based and dam-toe schemes 75 63\.3 small hydropower (ii) Run-of-river schemes 155 106 investments, the market (iii) Rehabilitation schemes 2\.7 demand was run-of-river (iv) Sub-projects using tail-end of thermal 33 canal and dam-toe sub- power plant cooling water systems projects\. (v) Stand-alone micro hydropower schemes Component 2 ­ Energy-Efficiency 30 42\.23 This is higher than Investments planned as co-financing by commercial banks was larger than expected\. Component 3 ­ Technical Assistance 7 5 During the period of implementation of this project, other donors financed a large number of activities (notably USAID's ECO project that financed US$ 25 million during 2000- 2008, reducing the identified requirements2\. Total 300 257\.37 Component A: Small Hydro Investments: This component was aimed at supporting various types of small hydro schemes, including: (i) canal-based and dam-toe schemes; (ii) run-of-river schemes; (iii) rehabilitation or upgrading of old plants; (iv) sub-projects using tail-ends of cooling water systems of thermal power plants; and (v) stand-alone micro hydro sub-projects of up to 100kW each\. It was expected that over 80 percent of the sub-projects would fall into categories (i) and (ii)\. The project was successful in 1 A fixed exchange rate of Rs\.44\.83 per US $ has been used to calculate US $ contributions made by borrower across the project timeline\. World Bank contributions, however, are based on actual US$ disbursements made throughout the project life cycle in real terms 2 http://www\.usaid\.gov/in/our_work/activities/Enrg_Env/eco\.htm; Personal Communications, Mr\. Srinivasan Padmanaban, Advisor, USAID 33 achieving the commissioning of 95\.65 MW of projects with 50\.55 MW of canal-based and dam-toe sub- projects and 42\.90 MW of run-of-river sub-projects as well as one 2\.2 MW project that utilized cooling system of thermal power plants\. No micro-hydro sub-projects and rehabilitation sub-projects were financed due to lack of proposals from entrepreneurs for such projects\. Experience from other Bank operations (Sri Lanka Energy Services Delivery Project) indicates that stand-alone micro-hydro projects in particular require significant subsidy support to become viable\. Details of sub-projects of each type and their performance are provided in Table 2\.2: Table 2\.2: Type-wise Distribution of Small Hydro Sub-Projects Loans Loans Sub-Projects Sub-Projects Sanctioned Availed Executed Commissioned Number of Schemes (i) Canal-based schemes 24 22 21 18 Dam-toe schemes 2 2 2 2 (ii) Run-of-river schemes 29 20 20 13 (iii) Rehabilitation schemes 0 0 0 0 (iv) Sub-projects using tail-end of thermal 1 1 1 1 power plant cooling water systems (v) Stand-alone micro hydropower schemes 0 0 0 0 Total number of schemes 56 45 44 34 Capacity Total capacity (MW) 240\.25 158\.45 158\.25 95\.65 *Source: Appraisal note of sub-projects prepared by IREDA and actual data collected from developers\. Forty-five sub-projects were supported out of which 34 sub-projects have been commissioned with a total installed capacity of 95\.65 MW\. Contribution of Small Hydropower Development during the Tenth Plan: The project made a significant contribution to the Tenth Plan target of 550MW capacity addition of SHP development\. Out of the total capacity of 536\.7 MW installed during the Tenth Plan, the Bank's LoC directly supported about 96 MW of commissioned projects\. Projects which dropped out of the Bank's LoC but were still completed during this period contributed another 38 MW of SHP capacity\. Hence, the Bank's LoC directly and indirectly supported approximately 25 percent of the capacity addition in the SHP sector during this period\. While costs of certain sub-projects were higher than specified at appraisal, the economic rate of return (EIRR) ranged between 27 percent and 224 percent\. The unit project costs showed a wide variation\. Eighty percent of the projects ranged from US$ 960/kW to US$ 1526/kW but there were projects with costs as low as US$607/kW and as high as $1857/kW as well\. The wide variation in unit project costs is on account of the locations and varying types of SHP projects implemented and to a small extent on exchange rate discrepancies\. The final evaluation report on the Second Renewable Energy LoC, conducted by PwC on behalf of the borrower, shows that the performance of the projects is uneven and on average below the appraisal estimates\. Projects were supposed to generate 426\.2 MUs annually at an aggregate CUF of 54\.4 percent\. However, based on available generation figures for 32 sub-projects, 402\.38 MUs are projected to be actually generated every year in FY08 and beyond\. Table 2\.3 highlights the current generation status: 34 Table 2\.3 ­ Actual vs\. Projected Generation for 32 SHP Sub-Projects Actual vs\. Project generation Average CUF (%) Total Generation (MUs) Projected for all sub-projects 54\.4 426\.2 Actual across all sub-projects 46\.3 402\.38 Projected (RoR sub-projects only) 58\.8 195\.4 Actual (RoR sub-projects only) 41\.4 142\.75 Projected (canal sub-projects only) 54\.2 159\.4 Actual (canal sub-projects only) 46\.9 164\.18 Projected (dam-toe sub-projects only) 45\.1 71\.5 Actual (dam-toe sub-projects only) 95\.45 *Source: PWC: Appraisal notes of sub-projects prepared by IREDA and actual data collected from developers\. Component B: Energy-Efficiency Investments: Seventeen EE projects included in IREDA's energy efficiency portfolio at the time of project closure are in various stages of implementation\. These are financed by the Bank's LoC and IREDA's own resources, representing over US$ 36 million disbursed for EE investment at the time of project closure\. The total amount of investment for IREDA's entire EE loan portfolio, including sponsor's equity contributions, is over US$ 74 million\. These projects represent 90 MW of new capacity/avoided peak demand\. The share of the Bank's disbursement directly financed under the second LoC is US$16\.93 through 12 sub- projects\. All but one sub-project financed directly by the Bank have been commissioned\. The last project, Shri Venkateswara Sponge and Power is under implementation, and initial disbursements were made under the second LoC\. The twelve EEC projects directly financed under the second LoC will save approximately 249 million kWh of energy per year\. The total estimated CO2 savings which will be achieved, assuming successful commissioning of the projects under implementation, is 9\.43 million tons1 over the life of the investments\. IREDA consultants prepared an analysis of the cost over-run of the EEC projects which indicates that the cost over-runs were within 10 percent\. Component C: Technical Assistance: The GEF-financed TA supported numerous activities to promote EE and DSM investments\. Initially, the TAP focused on: (i) capacity and institution building support at IREDA; (ii) implementation support for EE lending activities; (iii) policy support; and (iv) market awareness\. The program of activities was closely monitored during implementation, and was revised numerous times to better match activities with needs\. These four main areas were divided into 12 discreet tasks supported by the TAP, and included the following specific activities: 1 Advisory Services for ESCO Mechanism: This activity included: (i) analytical work on the Indian experience with the ESCO mechanism in the public sector, to support BEE-ESCO programs: and (ii) pilot handholding to support the design and procurement of ESCO-delivered efficiency services in eight hospitals and government buildings\. As of project close date of March 31, 2008, all baseline audit work was completed and Request for Proposal (RFP) documents were issued, but none of the ESCO contracts have been successfully awarded\. 1This is based on the assumption of a project lifetime of 20 years\. 35 2 Project Monitoring and Verification: IREDA was provided support in the development of: (i) monitoring and verification (M&V) protocols for efficiency projects; (ii) preparation of a project monitoring and evaluation (M&E) manual; (iii) concurrent auditing and monitoring of IREDA- financed projects; and (iv) post commissioning and evaluation of EE projects\. 3 Policy Support Initiative: Analytical work was undertaken to support: (i) BEE's development of EE codes and standards for certain equipment; (ii) Preparation of a directory of consultants and energy auditors; and (iii) production of investors' manuals for EE\. 4 Knowledge Management Plan: The activity focused on improving IREDA's institutional capacity and portfolio management capability by providing assistance for upgrading hardware and software, to strengthen IREDA's internal operational performance in EE and RE lending\. 5 Energy Efficiency Capacity Building Initiative: This activity included training and capacity building of IREDA and various stakeholders (industry, government and the financial sector) on EE\. Training programs were also conducted on environmental and social impact assessment issues\. Support was also provided for the strategic change consultancy under this activity\. The strategic change consultancy influenced the current business plan of IREDA and included three main pieces: (i) the "Strategy and Action Plan;" (ii) the "Resource Mobilization Plan" and (iii) "Reviewing Systems and Procedures of IREDA for its Lending Operations and Developing a Suitable Action Plan for Organizational Restructuring\." The final piece on reviewing systems and procedures was not completed by project close, and remaining work on this piece was supported by IREDA's internal resources 6 Project Development Sub-Projects: This activity provided an additional grant incentive for select new lending products\. 7 Procurement Advisory Services: This task provided specialist services to IREDA to support procurement of goods, works and consultancy services in a timely manner as per the World Bank guidelines\. 8 Performance Evaluation of the World Bank LoC: Independent evaluations were undertaken for both the mid-term and final review of the project\. 9 Project Partnership Program: This activity provided funding for IREDA's business development associates to generate new projects and to maintain EE information centers\. It also provided ground-level support for the ESCO's activities included in activity 1\. 10 Market Awareness and Outreach: This activity included numerous tasks designed to increase awareness of EE and to increase demand for EE lending\. Numerous unique marketing products were created, and disseminated through media outreach and targeted marketing through conferences and business meetings\. 11 Creative Market Development Initiative: SME cluster-based activities were undertaken in the textile, hotel, cement and paper sectors to increase lending for EE\. Eleven projects were implemented, although only one ultimately took a loan from IREDA\. 12 Support to Commercial Banks: This activity supported analytical work to increase Indian bank lending for EE, market support for bank sub-projects for EE for SMES, and a small grant program to partially cover energy audit costs undertaken through SBI Project Uptech for EE\. 36 Table 2\.4: Outputs of Technical Assistance Component Name of the TA Activity Indicator Output 1\. Advisory services for ESCO Number ESCO projects supported 8 Number implemented nil 2\. Project monitoring and Number of projects 4 verification monitored/evaluated 3\. Policy support initiative Number of policy/knowledge 5 products produced 4\. Knowledge management plan Number of systems improved 23 5\. Energy efficiency capacity Number of persons trained 3690 (external) + building initiative (including IREDA) 200 (IREDA) = 3890 6\. Project development scheme Loan amounts supported by grant Rs\. 3914 lakhs scheme 7\. Procurement advisory services Number of procurement tasks 12 (SHP & EEC projects) supported by consultants' work & 9 (IT projects) 8\. Performance evaluation No indicator - 9\. Project partnership program No indicator - 10\. Market awareness and Number of unique marketing Adv\. ­ 15 types outreach initiative products produced (i\.e\. Posters ­ 10 types advertisements\., posters, films, Films ­ 12 (U/P) brochures, etc) Brochures ­ 5 Number distributed (total) Number of persons reached Ads/posters ­ 25,000 (estimation) Adv/brochures ­ NA 11\. Creative market development Number of audits supported 24 initiative Number of projects implemented 12 Total value of investment and annual energy savings from Rs\.746\.6 lakhs (estimated) implemented projects Rs\. 650\.88 lakhs 12\. Support to commercial banks Number of energy audits supported 45 projects by SBI scheme Number of SME projects Nil implemented from focused cluster marketing 37 Annex 3\. Economic and Financial Analysis (including assumptions in the analysis) I\. Small Hydropower Schemes Financial Analysis At appraisal, the FIRRs of 14 sub-projects in the project pipeline were calculated to be in the range of 22\.0 percent to 40\.1 percent\. On project completion, FIRRs for 24 of the sub-projects funded under the Bank's LoC (for which actual generation data could be obtained) were found to range between 15 percent and 51 percent\. The FIRRs for the same sub-projects at the time of loan sanction were calculated to be in the range of 15 percent to 56 percent\. Scheme-wise details of FIRRs are provided in Table 3\.1\. Table 3\.1: Comparison of FIRRs of Sub-Projects at Sanction and Completion Project Project Name Project Capacity Projected FIRR based Cost Change in Code Type (MW) FIRR at on Actual Escalation Capacity Sanction Generation Utilization Factor 1308 Punjab Hydro Power Ltd\. Canal 1\.3 43% 51% 0\.0% -36\.6 1310 Punjab Hydro Power Ltd\. Canal 1\.5 48% 47% 3\.4% -22\.87 1309 Punjab Hydro Power Ltd\. Canal 1\.4 43% 38% 5\.6% -6\.2 1318 Balaji Energy Pvt\. Ltd\. Dam Toe 10 36\.37% 38% 5\.8% -19 1642 Kotla Hydro Power Ltd\. Canal 1 29\.62% 35% - -21\.2 1641 Kotla Hydro Power Ltd\. Canal 1 39% 34% 0\.2% -21\.1 1504 NCL Energy Ltd\. Dam Toe 8 29% 33% -6\.0% -10\.5 1643 Kotla Hydro Power Ltd\. Canal 1\.75 34% 32% 16\.6% -17\.5 1145 Cheveron Hydel Pvt\. Ltd\. RoR 1 39% 31% 10\.1% 3\.97 1349 Kallam Spinning Mills Ltd\. Canal 0\.8 23% 30% 12\.8% -20\.01 1660 Dhauladhar Hydro Systems RoR 0\.15 15% 29% 9\.0% -14\.1 1316 KKK Hydro Power Pvt\. Ltd\. RoR 3 27\.6% 29% 13\.5% 3\.3 1400 Ascent Hydro Projects Ltd\. Canal 2\.2 46% 28% 7\.0% 4\.97 1560 KM Power Pvt\. Ltd\. Canal 3\.3 34% 27% -8\.2% 0\.9 1515 Bhorukha Power Corporation Ltd\. Canal 1 28% 25% 0\.0% -15\.1 1424 Hateswari Om Power Enterprises RoR 1 21% 24% 0\.0% 8\.9 1363 Astha Projects (India) Pvt\. Ltd\. RoR 5 26% 24% 0\.0% 22\.8 1379 KM Power Pvt\. Ltd\. Canal 3\.3 48% 22% 5\.6% -1\.72 1380 KM Power Pvt\. Ltd\. Canal 4 45% 22% 0\.0% 7\.95 1054 Kalson Power Tech (P) Ltd\. Canal 3 18% 18% 21\.5% -0\.8 1317 Maruti PowerGen Pvt\. Ltd\. Canal 3 41% 17% 0\.0% 21\.84 1493 Dharamshala Hydro Power Ltd\. RoR 4\.5 56% 16% -6\.5% 53\.8 1030 Hanuman Ganga Mini Hydel RoR 3 30% 15% 29\.3% 42\.1 912 Nippon Power Ltd\. RoR 3 37% 15% 61\.1% 37\.56 Key Assumptions / Data: (a) Actual project data on costs (including escalations) have been obtained from IREDA\. For all projects, project construction period has been taken as 1-3 years\. The debt-equity ratio has been assumed to be 70:30\. (b) Sale price used in the calculation is as per the appraisal note\. However the sale price may have changed over the years\. For instance, for Himachal Pradesh, the PPA price earlier was Rs\. 2\.5 per kWh, which has been revised to Rs\. 2\.87 per kWh\. 38 (c) It is assumed that O&M cost of any plant is approximately 2\.5 percent of the total project cost for year-1 and further escalated by 5 percent annually for all projects\. Actual O&M costs were not available for each of the sub-projects\. (d) Subsidy figures used in the FIRR calculation have been provided by IREDA\. The subsidy amount is entirely accounted for in the cash flow of the first year itself\. Reasons for Deviation from PAD Estimates The financial analysis of the portfolio indicates that for majority of the projects, the actual FIRRs are below the estimates prepared at the feasibility stage\. The difference between FIRRs at appraisal, detailed project reports (DPRs) and project completion is on account of the following reasons: Pipeline of sub-projects was changed during the period between appraisal (July 1997) and approval (June 2007) owing to a delay in the Bank's approval on account of international sanctions against India at that time\. Therefore, this is not strictly a one-on-one comparison\. The prevailing government policy at the time of appraisal provided a 10 percent annual increase in tariffs for generation from RE schemes, and high FIRRs were therefore only to be expected\. With the introduction of the new Electricity Act, 2003 and lapse of the earlier government policy, the mandate for determination of tariffs for RE projects was given to state electricity regulators (SERs)\. As a result, there were significant changes in tariff determination approaches across states, which impacted several sub-projects funded under the Bank's LoC\. Implementation of the sub-projects also faced cost and time overruns due to factors such as natural calamities, inflation in commodity prices, unforeseen civil works, delay in statutory clearances, and poor performance of contractors (see Text Box-3\.2)\. The capacity utilization factor (CUF) of the projects have also varied due to decreased flows, silting and low grid availability (see Text Box-3\.1)\. However, revised estimates of FIRR are greater than cost of capital in all cases, and therefore all these SHP sub-projects are financially sustainable\. Text Box- 3\.1 Factors affecting Capacity Utilization of SHP Schemes Variations in Rainfall and Inconsistent Hydrology: SHP sub-projects are affected by variations in flow of water caused by changes in rainfall patterns\. For example, the Lodhama hydro project in West Bengal experienced 20 percent lower discharge in the lean season\. Silting of Rivers: In addition to a large amount of silting inherent to the Himalayan rivers, generation from some SHP sub-projects is also affected by silting from upstream mining and construction activities\. For example, the Maujhi-I scheme has been affected by silting from slate mining on slopes above the power plant site\. Breakdown of Transmission Infrastructure and Grid Failures: Another key factor affecting the capacity utilization has been the failure of the electricity system in project areas causing plants to stop operations\. For example, the Hanuman Ganga scheme lost a substantial amount of generation due to persistent grid failures\. As against a projected CUF of 78\.7 percent, the scheme achieved only 63\.2 percent in 2006-07 and 57\.5 percent in 2007-08\. Similarly, transmission breakdown in case of the Lodhama Hydro Electric Station affected generation\. 39 Text Box-3\.2 Factors leading to Time and Cost Overrun of SHP Schemes Of the 33 sub-projects commissioned under the project (for which actual data was available), 15 have a cost escalation of 5 percent or less\. The other 17 sub-projects have escalation in the range of 15 percent of the original cost estimates\. In general, cost escalation of about 15 percent is seen as acceptable for SHP sub-projects keeping in view high implementation risks, long construction period and increase in cost of raw materials\. About two-thirds of all projects were implemented within six months of projected commissioning\. Broadly the reasons for time and cost escalations in case of SHP sub-projects are as follows: Delay in Statutory Clearances: Delay in obtaining the required environmental, land and other statutory clearances result in implementation delays for projects such as Neora SHP and Birsignhpur SHP scheme\. Impact of Natural Calamities: Natural calamities such as floods and landslides have also impacted project implementation, causing time overruns\. For example, the Bonal Mini SHP was delayed by almost 44 months largely because of recurring floods in the area\. Similarly, power house construction in case of Jiwa SHP was affected by cloud bursts\. Delay in Implementation of Evacuation System: In some projects located far from the grid, implementation was impacted due to delays in the construction of the transmission system\. Unforseen Civil Work: In some projects, unexpected additional civil work needs delayed project implementation\. For example, rock structures and the presence of hard rock caused delay in the Balaji energy SHP project\. Price Inflation for Raw Materials like Cement and Steel: Projects also faced increase in costs due to increase in prices of raw materials such as cement and steel\. Non-performance of Contractors: Developers also cited poor performance of contractors as a reason for cost and time overrun of projects\. In some cases, cost escalations are on account of changed specifications of the scheme, leading to increased generation capacity\. Economic Analysis At appraisal, the EIRRs of 14 sub-projects in the project pipeline were calculated to be in the range of 20\.5 percent to 51\.3 percent\. On project completion, EIRRs for 23 of the sub-projects funded under the Bank's LoC (for which actual generation data could be obtained) were found to range between 27 percent and 224 percent, in all cases higher than the hurdle rate\. The EIRRs for the same sub-projects at the time of loan sanction were calculated to be in the range of 21 percent to 47 percent\. Scheme-wise details of EIRRs are provided in Table 3\.2\. Table 3\.2: Comparison of EIRRs of Sub-Projects at Sanction and Completion Project Project Name Project Capacity Projected EIRR EIRR Based on Code Type (MW) at Sanction Actual Generation 1318 Balaji Energy Pvt\. Ltd\. Dam-Toe 10 36% 224% 1504 NCL Energy Ltd\. Dam-Toe 8 24% 104% 1400 Ascent Hydro Projects Ltd\. Canal 2\.2 32% 98% 1145 Cheveron Hydel Pvt\. Ltd\. RoR 1 26% 97% 1316 KKK Hydro Power Pvt\. Ltd\. RoR 3 28% 84% 1424 Hateswari Om Power Enterprises RoR 1 29% 81% 40 1349 Kallam Spinning Mills Ltd\. Canal 0\.8 25% 79% 1309 Punjab Hydro Power Ltd\. Canal 1\.4 31% 79% 1363 Astha Projects (India) Pvt\. Ltd\. RoR 5 28% 78% 1308 Punjab Hydro Power Ltd\. Canal 1\.3 33% 77% 1310 Punjab Hydro Power Ltd\. Canal 1\.5 35% 76% 1660 Dhauladhar Hydro Systems RoR 0\.15 25% 75% 1642 Kotla Hydro Power Ltd\. Canal 1 25% 73% 1641 Kotla Hydro Power Ltd\. Canal 1 29% 65% 1643 Kotla Hydro Power Ltd\. Canal 1\.75 28% 63% 1379 KM Power Pvt\. Ltd\. Canal 3\.3 29% 62% 1380 KM Power Pvt\. Ltd\. Canal 4 27% 60% 1560 KM Power Pvt\. Ltd\. Canal 3\.3 32% 59% 1493 Dharamshala Hydro Power Ltd\. RoR 4\.5 47% 53% 1317 Maruti PowerGen Pvt\. Ltd\. Canal 3 27% 44% 1030 Hanuman Ganga Mini Hydel RoR 3 27% 39% 912 Nippon Power Ltd\. RoR 3 24% 37% 1515 Bhorukha Power Corporation Ltd\. Canal 1 28% 27% Key Assumptions In addition to the relevant assumptions already mentioned in the financial analysis, the following assumptions have been used for economic analysis of SHP schemes: (a) Cost of diesel-based generation has been estimated at Rs\.10 per kWh\. This is also consistent with the revised maximum unscheduled interchange (UI) rate of Rs\. 10\.00 per kWh provided by the Central Electricity Regulatory Commission (CERC)\. The prevailing capacity and energy deficit scenario in India is likely to continue in the medium term and therefore the cost of diesel-based generation is a suitable measure of economic benefit of the project\. (b) Economic costs of sub-projects were derived by adjusting the financial costs for taxes by applying the standard conversion factor of 0\.9\. Reasons for Deviation from PAD Estimates As mentioned in the financial analysis section, the sub-projects at completion are different from sub-projects in the pipeline at appraisal\. Several of the sub-projects have been affected by cost and time overruns, including the impact of commodity inflation\. However, the most significant reason for increase in economic return from almost all sub-projects despite cost and time overruns and lower than expected capacity utilization in several cases, is the increase in cost of diesel-based generation\. At appraisal, the cost of diesel-based generation was estimated at Rs\.3\.38 per kWh, whereas at completion this has been estimated at Rs\. 10 per kWh (global petroleum prices have increased even further since this analysis)\. II\. ENERGY EFFICIENCY Financial Analysis At appraisal, the FIRRs of 16 sub-projects in the indicative pipeline were calculated to be in the range of 26 percent to 158 percent\. On project completion, FIRRs for five of the sub-projects funded under the Bank's LoC (for which actual generation data could be obtained) were found to range between 11 percent and 91 percent\. The FIRRs for the same sub-projects at the time of loan sanction were calculated to be in the range of 26 percent to 51 percent\. 41 Actual FIRRs could be calculated and compared with appraisal estimates only for a sample of sub-projects (five in number) owing to difficulties in obtaining data\. Table 3\.3 illustrates the comparison of FIRRs for these 5 sub-projects\. For calculating the actual FIRR, the following assumptions were used: (a) Actual project cost (including cost escalations) have been used in the FIRR calculation\. (b) It is assumed that increase in O&M cost of any plant which has implemented EEC project involving installation of EE equipment is almost negligible\. Table 3\.3: Comparison of FIRRs for Sub-Projects at Sanction and Completion Project Name Projected Projected FIRR at Cost escalation FIRR at Completion (%) (Rs\. million) Sanction (%) GMR Technologies & Technologies Ltd\. 45 91 10 NCL Industries Ltd\. 51 46 32 Mahendra Sponge & Power (P) Ltd\. 46 22 20 Arunachalam Sugar Mills Ltd\. 26 12 25 Anand Tissues Ltd\. 39 11 0 The FIRR in case of GMR is very high as the actual energy savings are 3\.62 million kWh/annum against the projected 2\.46 million kWh/annum\. However, FIRR in case of Anand Tissues Ltd\. is negative because the actual energy savings are just 0\.65 million kWh/annum against the projected value of 2\.197 million kWh/annum, although there is some uncertainty related to this figure which was not independently verified\. Economic Analysis The EIRRs were calculated for a sample of projects and found to range between 53 percent and 238 percent\. Table 3\.4 illustrates the calculation of actual EIRR\. Although a one-on-one comparison with appraisal estimates was not possible due to the rapidly changing portfolio, this compares well with the appraisal estimates of a range of 26 percent to155 percent for a different sample of projects\. Table 3\.4: Comparison of EIRRs for Sub-Projects at Sanction and Completion Project Name Projected EIRR Actual EIRR GMR Technologies & Technologies Ltd\. NA 283% NCL Industries Ltd\. NA 238% Mahendra Sponge & Power (P) Ltd\. NA 154% Anand Tissues Ltd\. NA 102% Arunachalam Sugar Mills Ltd\. NA 53% Key assumptions: h) Cost of diesel-based generation has been estimated at Rs\.10 per kWh\. i) Taxes were taken at 11 percent which includes MAT, VAT etc\. j) Economic costs of sub-projects were derived by adjusting the financial costs for taxes by applying the standard conversion factor of 0\.9\. k) In case of coal saving, heat rate of 2,500 Kcal/ kWh was assumed 42 Annex 4\. Bank Lending and Implementation Support/Supervision Processes (a) Task Team members Names Specialization Unit Responsibility/ Specialty Lending (from Task Team in PAD Data Sheet) M\. Manzo Team Leader SASEG V\. Ziff Program Assistant SASEG I\. Sevilla A\. Ceyhan Power Engineer SASEG K\. Hattori SASEG S\. Padmanabhan Sr\. Energy Efficiency ASTAE Specialist Y\. Ziv Environmental Engineer ASTEN A\.Dani Social development ASTEN W\. Smith Economist Consultant Names Specialization Unit Responsibility/ Specialty Supervision (from Task Team Members in all archived ISRs) M\. Manzo Task Leader & Senior SASDE Operations Officer Supriya Sen Task Leader & Senior SASDE Financial Analyst Andrea Ryan Rizvi Task Leader SASDE P\. Dhingra Task Leader & Sr\. Power SASDE Engineer Mikul Bhatia Task Leader & Energy SASDE Specialist A\. Cabraal Sr\. Energy Specialist SASDE Judith Plummer Sr\. Financial Specialist SASDE R\. Taylor Lead Energy Specialist SASDE E\. Groom Sr\. Regulatory Specialist Jeremy Levin Sr\. Technical Specialist SASDI Priya Barua Research Analyst SASDE Priya Chopra Program Assistant SASDE Neelima Kapur Program Assistant SASDE 43 Chandrasekhar Sr\. Energy Specialist MNSSD Govindarajalu S\. Ahmed Sr\. Legal Counsel R\. Narula Financial Management SARFM Specialist M\. Gopalakrishnan Financial Management SARFM Specialist Manoj Jain Sr\. Financial Management SARFM Specialist N\. Verma Financial Specialist ­ SARFM Financial Institutions S\. Krishnan Procurement Engineer SARPS S\.K\. Bahl Sr\. Procurement Specialist SARPS A\. Tait Consultant S\. Sankaravadivelu Procurement Specialist SARPS S\. Srivastava Environmental Specialist SASDI Gaurav Joshi Environment Specialist SASDI W\. Warren Social Development SASDI Specialist S\. Thangaraj Social Development SASDI Specialist S\. Narayanan Sr\. Social Development SASDI Specialist R\. Lopez Rivera Hydropower Engineer (b) Staff Time and Cost (from SAP) (The system pulls data available for all fields) Staff Time and Cost (Bank Budget Only) Stage of Project Cycle No\. of Staff Weeks US$ Thousands (including travel and consultant costs) Lending FY1998 50,913\.66 FY 1999 21,848\.98 FY 2000 9\.65 17,044\.59 FY 2001 - - FY 2002 - - FY 2003 - - 44 FY 2004 - - TOTAL: 9\.65 89,907\.23 Supervision/ICR FY2005 40\.77 116,128\.59 FY2006 43\.15 93,357\.92 FY 2007 27\.06 28,778\.18 FY 2008 30\.98 34,477\.86 FY 2009 (Till 16\.8\.08) 5\.61 11,160\.35 TOTAL 147\.57 293,902\.90 45 Annex 5\. Beneficiary Survey Results (if any) Not Applicable 46 Annex 6\. Stakeholder Workshop Report and Results (if any) Not Applicable 47 Annex 7\. Borrower's ICR In the year 2000, IREDA has received this Line of Credit for the implementation of "India: Second Renewable Energy Project" of World Bank (WB) targeted to promote Small Hydro and Energy Efficiency / Conservation investments in the country\. The detailed objectives of the project as conceived are detailed below: 1\. Increase power supply through development of environmentally sustainable small hydro schemes\. 2\. Promote Energy Efficiency and demand-side management (SDM) investments\. 3\. Remove market barriers to delivery of Energy Efficiency services and products\. o Strengthening IREDA's capacity to appraise and supervise energy efficiency investment projects through the provision of consultancy services and training\. o Improving the marketing of the energy efficiency and DSM investments under the project through the provision of consultancy services to prepare business development modules, model bid documents and informative packages\. o Promoting private sector participation in the end-use efficiency including development of appropriate policy incentives through the provision of consultancy services to various state energy development entities, and training for public and private sector on energy conservation and DSM\. The Line of Credit included an IDA component US$ 50 Million, IBRD Component of US$ 80\.00 Million and GEF component of US$ 5\.00 Million whereas IREDA has to bring counterpart funding of US$ 2\.00 Million, only for GEF\. The IDA and IBRD components are poised for project funding while the GEF and IREDA's Counterpart are assigned to support the Technical Assistance / Capacity Building objectives to remove market barriers to delivery of Energy Efficiency Services and products\. The loan agreement was executed on 11th August 2000 and made effective from 31st January 2001\. The closing date of LoC was fixed for 31st March `2006\. During the course of implementation a number of policy issues etc\., beyond the control of IREDA and the sub-project promoters, had come up, affecting timely implementation/ progress of the project\. Therefore, the matter was taken up by IREDA with the WB through GoI which was considered and accordingly, on 24\.06\.2005 World Bank approved extension of the closing date of the LoC up to 31\.03\.2007 with a reduction of US$ 18 million from IBRD allocations\. Subsequently, a second extension in closing date up to 31\.03\.2008 was also considered by WB on 20\.11\.2006 with an additional reduction of US$ 8 million in the IBRD component in the trail\. Implementation of Small Hydro Projects 48 World Bank through the second LoC has supported 45 SHP sub projects; out of which 12 projects are under IBRD and 33 under IDA Line of Credit\. 35 sub projects have been commissioned with installed capacity of 100\.15 MW by July, 2008\. The remaining 9 projects aggregating to 57\.90 MW are expected to be commissioned by March, 2009\. The total installed capacity of all projects when commissioned, will be 158\.25 MW\. 1 project of 0\.4 MW capacity stands abandoned\. Implementation of Energy Efficiency Projects World Bank through the second LoC has financially supported 12 sub projects in EEC sector\. Out of this 11 have been commissioned and one is expected to be commissioned in December, 2008\. Majority of the projects are for installation of energy conservation equipment except two projects which are for setting up of captive power plant\. The industrial plants in sponge Iron, cement, steel and sugar sectors were able to purchase and demonstrate new technologies with excellent energy efficiency norms\. The success stories developed under WB LoC has paved the way for advanced energy efficient technologies in many of the Indian industrial plants e\.g\. the cement plants, the energy efficiency norms are comparable to the best energy efficient plants in the world\. Further, some of the steel plants and sugar plants are already undergoing process of modernization and adopting more energy efficient practices\. BEE's recent study of the pulp and paper sectors has indicated that these sectors have also responded positively and implemented technology upgradation plans\. Use of fluidised bed boiler, variable frequency drives, energy efficient pumps, fans, compressors and cooling towers are widely employed in Indian industries\. Interactions with industry experts indicate that over the years, there has been a significant reduction in investment costs of these equipment given their increased demand and scale of manufacturing\. Implementation of Technical Assistance Activities Overall 12 TAP activities were implemented\. Several activities have been designed and completed under the Line of credit to overcome various market barriers in implementation of Energy Conservation Act, 2001\. The funded projects were aimed to showcase techno-economic viability of EE investments by IREDA to other financial institutions and Commercial banks through developing their capacity to design bankable EEC project packages and also build the capacity of associated stakeholders\. Technical Assistance support was provided in standardization of project appraisal formats; developing pre and post project monitoring and verification protocols for sugar, cement and steel sectors and marketing of EE loan schemes\. Capacity building programs for commercial banks and ESCO companies were undertaken to enhance technical and financial capacity for developing EE loan schemes and marketing techniques\. The activities like preparation of investor manual, EE information manual and development of codes and standards for performance evaluation of industrial equipment aimed at identifying the potential areas in energy intensive sectors that need to be targeted for energy efficiency\. They also contributed in developing the strategic plan for implementation of Energy Conservation Act, 2001\. 49 Technical Assistance was also provided to ESCO's in developing projects in Government buildings, hospital buildings, and industrial clusters\. Some of the activities undertaken under TAP focussed on development of consultant directory, database on EE product equipment, list of ESCO companies and EE equipment manufacturers\. IREDA also utilised the knowledge gained under TAP activities to develop their portfolio in EEC financing\. IREDA has financed 11 projects in industries like cement, pulp and paper, sugar, steel in this LoC\. Additionally, IREDA has also financed one project in hotel industry outside the LoC, base work for which was undertaken in TAP\. EEC projects financed under LoC with reduced interest rates encouraged the industrial sector like cement, pulp and paper, textile and Hotels to improve their existing technology and profitability with achievement in reduction in overall specific energy consumption and emissions\. 4\.1\.1 Bottlenecks for Small Hydro Development Hydro power projects are location specific, varying significantly in costs and feasibility depending upon topography, hydrology, geology and accessibility related factors\. The cost of SHP projects (per MW) ranged from around Rs\. 40 million to Rs\. 100 million\. The main reasons for this are that the investment costs of hydro can vary significantly due to terrain and access difficulties as most of these projects are located in remote hilly areas\. Besides the transmission of power to load centres, away from the source, necessitates investment in construction of transmission networks on difficult terrain\. In India in the hydro sector, there are very few integrated EPC contractors\. Contracts are mostly split between civil construction and plant and machinery installation, which makes negotiation of EPC contracts relatively complex\. Therefore there is a need to address functional, technical and price related aspects across contracts; else developers may face the risk of time and cost overruns and lower profitability\. SHP developers have highlighted lack of adequate land and freedom to develop the land and the infrastructure as a key bottleneck\. In hilly states, delays in obtaining land/forest clearances have substantially delayed project implementation\. This is a major problem being faced by a number of SHP developers as once local residents know that a SHP plant is coming up in an area, they either refuse to sell the land or ask for exorbitant prices\. One of the most crucial issues/ barriers in the scaling up of hydro plant (large and small) is interconnection between the plant and the nearest grid point to maximize the power usage from these sources\. In a number of cases it has been seen that SHP plants are situated in locations far away from the transmission network\. Therefore providing grid extension up to the SHP plants introduces an additional financial burden either on the licensee or the developer and in cases where funds for development of this infrastructure are limited; it severely hampers the process of hydro development in the region and state\. Hydro is a relatively expensive renewable energy technology due to its high upfront costs from detailed engineering requirements, remote locations, synergising civil and electromechanical works and also the high risks of Force Majeure events which sometimes further drive up the costs making these projects all the more unattractive for private developers\. 50 Differing policies across states lead to concentration of projects in States which have the most investor friendly policies\. At the same time different States have different policies for the awarding projects, variations in feed in tariffs and capital costs allowed which again promote non uniform hydro power development and consequent excess capacity in some States and supply constraint in others\. Lack of adequate financing also discourages developers especially the first generation entrepreneurs in the development of Small Hydro Projects\. Financial Institutions, such as public/ private banks are still by and large unconvinced of the success of Small Hydro Projects\. Financial institutions are unlikely to finance small first time developers who cannot put up enough collateral\. With an approximate cost of about Rs\. 50 million a Megawatt, developing a 5 MW plant would entail an expenditure of anywhere between Rs\. 200 - 250 million of which a minimum equity an entrepreneur would have to put up would be Rs\. 50 million\. Most banks request developers to either furnish guarantees or provide adequate collateral as a financial institution which very few developers are able to comply\. Despite detailed S&I, project development in the Himalayan Region is prone to geological surprises during construction\. This can at times cause delay and add to the estimated project cost\. It is necessary to ensure that commercial agreements, such as the Project Implementation Agreement, signed with the State Government recognize such surprises and provide for consequent extension of Commercial Operation Date in case such surprises emerge during the construction period\. Technical- Economic Clearances (TEC) on an average adds between one to two years to the development time of the project\. 4\.1\.2 Barriers to EE in India The projects financed under this World Bank Line of credit targeted to address the three primary stakeholders in EE and ESCO business, namely the end-use industry, energy auditors, and the banks and financial institutions\. Banks and state-level financial institutions usually finance the SMEs and municipal corporations\. While awareness about EE opportunities is gradually increasing among SMEs, municipal corporations and commercial building from last five years, there has been no concrete effort to expand EE project financing\. The issues on EE from the perspective of each of the stakeholders are discussed in brief in the following section: Large companies with access to information, technical consultants and finance have found it less difficulty in implementing the EE projects as compared to the SME sector, who have not undertaken energy efficiency initiatives on account of several issues and constraints\. These include: o Lack of data on energy consumption, including measurement and verification (M&V) available with SMEs; o Lack of trust on technical capabilities of external energy auditors (we know our plants better attitude); o Lack of either guarantee from the consultants for minimum savings or absence of demonstration of savings in other similar types of plants in vicinity; 51 o Non-availability of turnkey solutions from concept to commissioning from one single source; o Non-availability of simple financing schemes for implementing EE projects on normal terms, preferably from the same bank from which it has availed working capital requirement; o Last but not least, the burden of upfront transaction cost of carrying out energy audits\. Impact of World Bank 2nd Line of Credit Small Hydro Power Most of the Small Hydro developers are either first generation entrepreneurs in energy sector or small and medium enterprises\. However the impact their investment and work has had on society especially the local communities and the local environment is noteworthy\. One of the biggest impacts and learning's from the second LoC has been the understanding of the key role this programme has played in making clean energy sources like small hydro commercially attractive and viable\. The second LoC provided an opportunity for developers and entrepreneurs interested in setting up SHPs to come forward, plan and execute these projects with funding from IREDA when no other financial institution was ready to provide funding to these projects\. The second LoC provided access to funds for first time entrepreneurs\. As they successfully executed projects, other FIs gained confidence and gave them the funds to scale up and invest further\. 19 states namely, Andhra Pradesh, Assam, Bihar, Haryana, Himachal Pradesh, Jammu & Kashmir, Jharkhand, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Mizoram, Orissa, Punjab, Rajasthan, Tamil Nadu, Uttarakhand, Uttar Pradesh and West Bengal have announced policy for setting up commercial SHP projects through private sector participation\. The facilities available in the states include wheeling of power produced, banking, buy-back of power, facility for third party sale etc\. The conducive policy in many states particularly due to Renewable Energy Purchase Obligation (RPO) and successful project implementation of projects from 2nd LoC from World Bank, have generated many projects\. There are now ample number of Small Hydro projects in pipeline in IREDA which also includes one project of 100 MW capacity which will require consortium financing\. Energy Efficiency & Conservation Most of the EEC sub projects developers went for installation of energy efficiency equipment in the existing plants and as such these measures do not have any direct impact on the local community\. Under the Energy Conservation Act, 2001, 9 energy intensive industrial sectors are defined as Designated Consumers i\.e\. thermal power stations, fertilizer, cement, iron and steel, chlor-alkali, aluminium, railways, textile and pulp & paper\. Specific energy consumption (SEC) norms for each designated consumer were emphasized to be adhered after five years\. It is observed that there is a wide band of energy efficiencies in 52 different units, some units would be able to comply and some will be unable to achieve the target of SEC\. Issue of Energy Savings Certificates to those Designated Consumers who exceed their target SEC reduction may be a mechanism whereby certified excess saving may be traded amongst companies to meet their standards compliance requirement, or banked for the next cycle of energy savings requirements\. The progress of energy efficiency has not achieved the required pace in India due to barriers of: Lack of awareness Higher upfront cost of energy-efficient technologies Lack of access to innovative financial instruments and Asymmetry in sharing of costs and benefits from the technology Success of most of the projects funded under LoC has proved that the financing EEC sub projects is a viable option and not a risky proposition\. Financing of EEC sub projects was a new experience for IREDA at the start of this LoC but now IREDA is strongly placed to finance similar projects\. Foreclosure of the loans by some of the projects funded under this LoC has shown that the implementation of EEC projects is even more profitable than what they had expected during proposal stage\. On supply side energy efficiency has a lot of potential in optimisation of performance of power plants\. To promote energy efficiency / conservation in energy consumption and to promote optimum performance of the power plants with a view to improve environment and climate protection by involving agencies that has responsibilities of outputs and activities as per their field of expertise\. Energy Efficiency in buildings offers an enormous potential for reducing energy consumption\. Whether in existing housing stock or in newly constructed units, energy efficiency constitutes a savings potential that is still far from being fully utilised\. Conclusion 2nd line of credit wherein 45 small hydro projects were funded has enabled IREDA to take up financing of small and medium hydro projects with a better prospective of barriers in development and to factor in risks and its mitigation associated with development of SHP\. Further, this has also helped IREDA build up relationship with SHP entrepreneurs and who are now taking up small and medium Hydro projects in various states enabling IREDA to increase its outreach to various states and promoters\. Similarly for Energy Efficiency projects inclusion of enhanced energy efficiency as one of the eight National Missions recently announced by the Government have brought the sector on forefront\. A number of schemes and programmes have been initiated and it anticipated that these would result in a saving of 10000 MW by the end of 11th Five Year Plan in 2012\. The World Bank Line of credit for energy efficiency and particularly capacity building of various stakeholders through TAP activities have resulted the importance of enhanced energy efficiency\. During the period of Line of Credit, IREDA had a very active interaction with all the stakeholders including other commercial banks and Bureau of Energy Efficiency\. Power plants efficiency improvement, Energy Efficiency in industry and end use, development of programmatic CDM and Energy Efficiency in public and private buildings are the focus areas emerging in the near future\. 53 Annex 8\. Comments of Cofinanciers and Other Partners/Stakeholders Not Applicable 54 Annex 9\. List of Supporting Documents 1\. Project Concept Note 2\. Project Appraisal Document, April 1998 3\. Financing Energy Efficiency: Lessons From Brazil, China, India and Beyond\. Robert Taylor, Chandrasekar Govindarajalu, Jeremy Levin, Anke Meyer and William Ward, World Bank, 2008 4\. Mid-Term Review Report (Econoler), July 2003 5\. Final Evaluation Report-" Status Report on India- Second Renewable Energy Project", PricewaterhouseCoopers, India, March 2008 6\. Aide Memoires for Implementation Support Missions from May 2000 7\. Implementation Completion Report (ICR) for India: Renewable Resources Development Project, Project ID: P010410, June 2002 8\. Implementation Status Reports (ISR) from December 2000 9\. Country Assistance Strategy (CAS) for India, December 1997 10\. India Energy Efficiency Project\. SMPR report, Global Environmental Facility, 2003 11\. National Action Plan on Climate Change, Government of India, June 2008 12\. BEE Action Plan, 2008 13\. Energy Conservation and Commercialization (ECO) http://www\.usaid\.gov/in/our_work/activities/Enrg_Env/eco\.htm 14\. Personal Communications, Srinivasan Padmanabhan, Advisor, USAID 55 Annex 10\. Institutional Development of IREDA During the course of two World Bank engagements with IREDA, several initiatives have been taken to strengthen the institutional capacity of the organization and establish it as the premier renewable energy financing agency in India as well as in the South Asia region\. Some of the key initiatives taken over the last few of years, and the improved corporate performance achieved as a result are discussed below\. Improved Corporate Governance Arrangements IREDA has taken a number of initiatives to strengthen corporate governance\. After more than two and a half years of vacancy, the position of MD has been filled, and elevated to Chairman and MD\. This has enhanced the autonomy in decision making and allowed the organization greater flexibility as a financial institution in responding to the market\. Vacant positions on the IREDA Board have been filled and three independent Directors have been appointed to the Board in 2008\. The independent directors are distinguished people, including the former Chairman of the Central Ground Water Board (Ministry of Water Resources), a distinguished professor from the Indian Institute of Technology (IITK) / Indian Institute of Management (IIMB) who is also the founder director of the Indian Institute of Information Technology (IIIT), and the former Member (Finance) of the Department of Telecom\. IREDA has placed a strong emphasis on greater transparency and accountability and has put measures in place to achieve this\. It has appointed an audit committee to review internal systems, financial performance and management, and risk management policy\. An external consultant has been hired to review systems and procedures of IREDA's lending operations and to develop a suitable action plan for organizational restructuring through the strategic change consultancy exercise under the Bank's LoC\. Improved Corporate Financial Performance IREDA's financial performance, which had deteriorated significantly during 2003-05 due to the change in enabling environment, compounded by natural events (droughts in Andhra Pradesh ­ see Text Box 10\.1) and the company's inability to swiftly respond to changing interest rate regime in the country), has been improving consistently over the last three years\. Loans Portfolio: IREDA's loan portfolio has been greatly expanding over the last several years\. Disbursements in FY07 increased by more than 36 Text Box 10\.1: Impact of Andhra Pradesh percent over FY06 to about Rs\. 410 crore\. This Drought on Small Hydro Power projects increased by a further 34 percent in FY08\. Increase in Andhra Pradesh faced drought like disbursements is partially attributable to initiatives taken conditions for three years from 2001-04\. As following the strategic change consultancy exercise\. a result, small hydro sub-projects faced These initiatives include funding of medium hydropower decrease in water flow and were unable to plants (larger than 25 MW), consortium funding with generate adequate revenues to service their commercial banks, and increased financing for wind debt\. Of the 25 sub-projects that were sector projects\. impacted, 6 were funded under the second Profitability: IREDA's profitability improved from renewable energy project\. IREDA Rs\.46 million in FY02 to Rs\. 470 million in FY08\. One developed a loan restructuring package to of the key factors that have affected its profitability in assist promoters\. The main features of the the recent years is the provisioning for poor asset package included extension of repayment quality\. period, interest waiver till start of principle repayment and a reduction in interest to 10% Asset Quality: A fall in recovery rate and a high level of subject payment of premium\. All the affected NPAs (an increase of 7 percent over the previous year) sub-projects are performing satisfactorily was observed in IREDA's loan portfolio in 2006\. after restructuring\. Twenty-five of IREDA's SHP projects in Andhra 56 Pradesh were affected by drought for a consecutive three-year period, which resulted in a high accumulated funded interest liability, making it difficult for developers to make full and timely payments on a sustained basis\. In addition, a change in accounting standards, which required NPAs to be recognized with a lag of 90 days instead of the previous 180 days also contributed to higher NPAs\. To address this concern IREDA initiated actions for recovery from NPAs through various instruments including: (i) one-time settlement (OTS); (ii) Reschedulment; and (iii) SARFAESI Act, which resulted in recovery of written-off loans of Rs\.14 crore and Rs\.12 crore each in FY06 and FY07 respectively, thus enhancing IREDA's revenues and profitability\. As of FY08, IREDA's net NPAs stood at 11\.25%\.1 Support from GOI in raising more capital: IREDA's ability to fund a larger RE project is limited by the size of its net worth\. GOI has increased the authorized share capital of the company from Rs\.400 crore to Rs\.1000 crore to allow IREDA to raise more equity from government sources as well as from the market\. MNRE has advised IREDA to explore opportunities for broad basing its equity base\. Strategic Outlook of IREDA The World Bank project assisted IREDA in undertaking a set of three strategic consultancy studies which aimed at developing a strategic vision and addressing some of the key challenges faced by it\. The three studies were: 1\. Strategy and Action Plan for Adapting to the Changing Business Environment 2\. Resource Mobilization Plan 3\. Reviewing Systems and Procedures of IREDA for its Lending Operations and Developing a Suitable Action Plan for Organizational Restructuring The key recommendations of the first two studies (the third study is currently in progress) as well as the steps being taken towards implementing them is provided in Table 10\.1: 1This is based on provisional numbers for FY07-08, subject to approval by IREDA's Board of Directors\. 57 Table 10\.1: Key Recommendations and Actions Taken from First Two Strategic Change Consultancy Studies Ser Strategic Consultancy Actions Taken by IREDA Recommendations 1 Financing of medium and IREDA is discussing the funding of a large hydropower large hydropower projects project under co-financing arrangement with IL&FS\. (above 25 MW) under IREDA is funding a Rs\.3,620 million wind power project for consortium financing Tata Power arrangements\. IREDA is planning to explore the funding of more wind Financing other Large power IPP projects with some developers Renewable Energy projects IREDA is planning to finance co-generation projects with under consortium financing sugar cooperatives under a consortium financing approach arrangements with other banks and financial institutions\. 2 Form a consortium with IREDA has signed a MoU with PTC India Ltd\. and PTC India banks and financial Financial Services\. Together the three entities would provide institutions for project full financial and commercial solutions to RE developers financing to increase market including financing, investment and power off-take\. reach and market share\. IREDA has signed an MoU with the Power Finance Corporation (PFC) to facilitate consortium financing of RE and EE projects (especially medium and large hydropower projects) IREDA is co-operating with Tata Power on 85\.4 MW wind project along with private sector operations arm of the ADB\. IREDA has signed partnership agreement with IDFC to explore joint implementation of RE programs\. 3 Arrange funding from IREDA is availing funding from the European Investment bilateral and multilateral Bank (EIB) of Euro 150 million for overall RE investments\. sources for reduced cost of IREDA is tying-up KfW funding for Euro 50 million for all funds RE with a specific emphasis on IPP wind energy projects\. IREDA is arranging an additional Euro 19 million from KfW towards exploring projects that would help in removal of barriers to bio-mass based generation\. IREDA is in early discussions with ADB for US$ 150 million funding for solar thermal and solar photo-voltaic projects\. 4 Streamline delivery Study on reviewing systems and procedures, and processes for customer organizational restructuring is currently underway\. retention\. For example, easier Credit Risk Rating System developed by CARE for rating appraisal process for repeat IREDA customers and offering risk-based terms of lending has customers ­ cutting down on been implemented\. A credit risk rating cell has also been avoidable steps and offering established\. competitive and flexible lending terms\. Regular feedback and interaction\. 58 Annex 11 Sample Energy-Efficiency and Renewable Energy Investments1 A few sample projects are highlighted below to provide a flavor of the investments that were undertaken under this operation\. The samples include: (i) one EE project in waste-heat recovery (WHR), which is likely to become a key niche business area for IREDA moving forward; (ii) one innovative canal-based hydro project that was built utilizing the head available within the water circulating system at a thermal power plant; and (iii) one run-of-river (ROR) sub-project that showcases exemplary social and environmentally sensitive development\. Mahendra Sponge & Power (Pvt) Ltd\. ­ Energy-Efficiency Project Mahendra Sponge & Power (P) Ltd\. (MSPPL) was incorporated as a private limited company on July 23, 2002 to manufacture sponge iron, steel and power\. The company has a capacity to manufacture 200 TPD with two kilns of 100 TPD each\. The first kiln was commissioned on November 26, 2003, while the second kiln was commissioned on October 23, 2004\. MSPPL declared profits during the first year of operation\. The company proposed to set up a 8 MW WHR-based power plant, from the waste heat released from the two kilns, to meet the entire power requirement of its sponge iron plant and the power requirements of its group units (within the same complex) that manufacture MS ingots and TOR Steel\. MSPPL approached IREDA to part finance a Rs\. 275 million proposed investment in a power plant based on waste heat from sponge iron kilns and an additional atmospheric fluidized bed combustion (AFBC) boiler\. A DPR was submitted with an application for a loan of Rs\. 192\.5 million\. The loan was subsequently approved by IREDA and was shared equally between IREDA and the Second Renewable Energy Project funding that is, Rs\. 96\.25 million each\. The project implementation was smooth except for a delay of four months due to the late shipment of the AFBC boiler from the supplier, Citar Vessels\. Though originally planned to be commissioned in October, 2006 it could only be commissioned in February, 2007\. There was a cost overrun of Rs\. 20 million due to additional expenses on civil and erection works but all the additional expenses were provided from the internal accruals of the company\. Figures 1 & 2: Waste Heat Recovery Boiler and Kiln 1These Case studies were prepared based on the site visits and final evaluation report prepared by consultants PricewaterhouseCoopers, India 59 MSPPL completed the installation of the power plant in February 2007 and started commercial production in March 2007\. The plant is also recording the data with regard to the auxiliary power consumption which is around 14-15 percent of the generated power\. The major portion of the power produced is used for captive generation for the sponge iron plant and the two induction furnaces of 8 T capacity each\. For the rest of the power, MSPPL has signed a PPA with the Chhattisgarh State Electricity Board, which is to the tune of 3 MW (average PLF 80 percent)\. This project has set the benchmarks and standards for pursuing WHR boiler-based power plants for other sponge iron units\. MSPPL was the first plant in an industry cluster in Siltara, Raipur which installed captive power plant using waste heat from the sponge iron kilns\. The success of MSPPL in running this plant has influenced four additional sponge iron plants to install captive power plants\. As such, MSPPL has become the trendsetter in that area and more WHR power plants are expected in the remaining 18-19 sponge iron plants in the cluster\. Birsinghpur - Small Hydro Project The Birsinghpur project is located in the Umaria District, about 180 km northeast of Jabalpur in the eastern part of Madhya Pradesh\. The project is located within the premises of Sanjay Gandhi Thermal Power Station (SGTPS) which is owned and operated by the Madhya Pradesh Power Generating Company Ltd\. (MPPGCL), formerly Madhya Pradesh State Electricity Board (MPSEB)\. SGTPS is located on the Johilla River and has four operating units of 210 MW each\. SGTPS operates on the lake cooling system in which, the water is conveyed in a canal to the circulating water pump house\. The water is then circulated through the cooling condensers of the steam generating units by the circulating water pumps\. After cooling the steam in the condensers, the water is discharged to the seal pit\. The water then flows back to the reservoir by gravity through the return canal\. About 30,000 cubic metres per hour (m3/hr) of water is required for cooling the condensers\. Three pumps, each having a discharge capacity of 10,000m3/hr at 25 metres head are employed to draw water from the lake\. Figures 3& 4: Seal Pit and Bypass Gate of the Plant The difference in elevation between the water level in the seal pit and the water level in the return canal provides the head for the Birsinghpur mini-hydro project\. The quantity of water discharged from the seal pit provides the flow\. The available head and flow for the project activity are relatively constant, with the head being about 8\.7 M and the available flow for each unit of about 8\.3 cubic meters/sec for a total flow of about 33 m3/sec\. The feed-in tariff for the project was set at Rs\. 2\.25 per unit as per the MNRE policy that was applicable when the project was commissioned\. A 30-year PPA was signed with MPSEB, however, sale to third parties was also allowed under the PPA and at present 100 percent of generation from the mini- hydro project is sold to Indore and Ratlam-based third parties at a mutually decided rate (between Rs\. 3\.85 and Rs\. 4 per unit)\. As the thermal plant is operational year round, except for disruptions due to R&M or technical problems, the hydro project is also operational throughout the year\. As a result, the project has 60 achieved a CUF of 95 percent, which is higher than the projected CUF in the DPR of 86\.6 percent\. While this hydro project was innovative, it has high replication potential at other thermal power plants across the country\. Dehar - Small Hydro Project The Dehar SHP is a 5 MW plant at Bithal village of the Sihunte Tehsil in Chamba District of Himachal Pradesh\. Although the project was executed on time there was an escalation in civil cost as some structures had to be rebuilt due to landslides\. As a result, the projected cost (as per the loan agreement) of Rs\. 248\.5 million escalated to Rs 256\.10 million\. The project was primarily funded by IREDA but a loan of Rs\. 19 million was also taken from another financial institution (UCO Bank)\. The developers of this project have implemented a number of exemplary social and environmental initiatives as part of the project\. Some of these initiatives are outlined below\. Livelihood Opportunities: To enhance community relations and provide livelihood for people living in the surrounding villages, the project developers have decided to provide a job to at least one person from each household in Bithal village\. This has had a very positive impact on the image of the project and local villagers speak highly of the work undertaken by the project developers\. The project has also taken up the initiative of providing 10 kg of rice per month to 100 households below the poverty line located in the surrounding area\. These households were selected based on consultations with the local panchayat\. The project also provides livelihood opportunities for others from Himachal Pradesh\. Barring one supervisor (a diploma holder) from Andhra Pradesh, all personnel working at the plant were from Himachal Pradesh, including districts that are far away from the project site\. Connectivity and Community Development: The project developer had constructed a three-kilometre long dirt road for the project that now provides very good connectivity for the Bithal village to the nearest road head at Tikri\. The project developer has also constructed a small temple near the project site for the villagers and a small Dharamshala (with four rooms and associated infrastructure) at the Chumali Mata Mandir, the local deity's shrine\. In addition, the developer has also constructed a playground for the local school\. Minimizing environmental impact and construction costs: The project developer has constructed a ropeway of Figure 5 ­ Road built with temple in background approximately 0\.5 km which was used for transportation of all construction material to the channel and fore bay tank to reduce the number of trees that needed to be felled during construction\. In addition, the project undertook afforestation on 6\.0 hectares of degraded land at Jaiaru N-DPF-I as compensation for the trees that were cut during construction and also paid Rs\. 0\.2\.million for soil conservation as mandated by law\. 61 Maintenance of the Irrigation and Public Health Department (IPH) water and irrigation supply weir: The project developer undertook the maintenance of an IPH's (Irrigation and Public Health Department) weir located adjacent to the site (weir is located below the projects fore bay tank)\. This weir invariably gets damaged during the rains every year and the project has an understanding with the IPH and the local people that the repair work for the weir is the responsibility of the project\. Annually, the project developer spends up to Rs 0\.3 million on repair work\. The weir services a kul (a water channel) which is almost 7 km long and is the longest in Asia\. In addition to the above initiatives this small hydro project was also the first hydel project in India to sell CERs\. The project sold 23,000 CERs during the first 17 months of project implementation to KfW\. 62
REVIEW
P078058
 ICRR 13983 Report Number : ICRR13983 IEG ICR Review Independent Evaluation Group 1\. Project Data: Date Posted : 06/12/2014 Country : Kenya Project ID : P078058 Appraisal Actual Project Name : Arid Lands Resource US$M ): Project Costs (US$M): 144\.9 152\.0 Management Project Phase Two L/C Number : C3795 Loan/ US$M): Loan /Credit (US$M): 120\.0 118\.39 Sector Board : Agriculture and Rural Cofinancing (US$M): US$M ): 11\.56 5\.68 Development Cofinanciers : European Union Board Approval Date : 06/19/2003 Closing Date : 06/30/2009 12/31/2010 Sector (s): General agriculture fishing and forestry sector (40%); Animal production (30%); Other social services (30%) Theme (s): Natural disaster management (40% - P); Other environment and natural resources management (20% - S); Other rural development (20% - S); Participation and civic engagement (20% - S) Prepared by : Reviewed by : ICR Review Group : Coordinator : John Redwood Robert Mark Lacey Christopher David IEGPS1 Nelson 2\. Project Objectives and Components: a\. Objectives: According to the 2003 Development Credit Agreement (Schedule, 2, pg\. 20) and the Project Appraisal Document (PAD, pg\. 2), “the objective of the Project is to enhance food security and reduce livelihood vulnerability in drought prone and marginalized communities in the Project Area \.â€? The “Project Areaâ€? was defined in the PAD (pg\.2) as “21 ASAL [Arid and Semi-Arid Land] districts\." On August 3, 2006, a level 1 restructuring was approved by the Board \. This involved additional financing (AF) in the amount of US$60 million and an expansion of the project ’s development objectives\. The amended Development Credit Agreement adopted the following revised statement of objectives : "to reduce livelihood vulnerability, enhance food security, and improve access to basic services in 28 drought prone and semi-arid districts in Kenya\." The changes were the addition of the objective "to improve access to basic services, " and an increase in the number of ASALs covered by the project from 21 to 28\. The key associated outcome targets (ICR, pg\. 3) were: Decreasing proportion of people assessed as needing free food aid in each arid and semi -arid district affected by severity of drought\. Reducing the time lapse between reported drought stress and response \. Improved nutritional status of children below 5 years of age affected by severity of drought over time \. Increased number of people with access to basic services (water, human, and animal health services and education)\. Increased people’s participation in the project districts in local and national development as demonstrated by the reflection of arid lands concerns in the economic recovery strategy and other relevant national policies \. This Review is based on the statement objectives in the amended 2006 Development Credit Agreement\. b\.Were the project objectives/key associated outcome targets revised during implementation? Yes If yes, did the Board approve the revised objectives /key associated outcome targets? Yes Date of Board Approval: 08/03/2006 c\. Components: 1\. Natural Resources and Drought Management -- appraisal cost (including AF: US$99\.7 million; actual cost: US$115\.99 million, or 116 percent\. A\. Natural Resources Management B\. Drought Preparedness and Management 2\. Community-Driven Development -- appraisal cost (including AF): US$28\.6 million; actual cost: US$24\.2 million, or 87 percent\. A\. Support to CDD Implementation B\. Community Capacity Building C\. Capacity Building for Backstopping Services 3\. Support to Local Development -- appraisal cost (including AF: US$16\.6 million; actual cost: US$11\.81 million, or 70 percent\. A\. Policy, Advocacy and Research B\. Local Services Development C\. Piloting Financial Services d\. Comments on Project Cost, Financing, Borrower Contribution, and Dates: Project Cost: Total actual cost was US$152\.0 million, 5 percent higher than the appraisal (with AF) estimate\. Financing: The original IDA credit of US$60 million equivalent (SDR43\.6 million) was increased by another US$ 60 million (SDR40\.35 million equivalent) of Additional Financing (AF) in August 2006 to "help finance the costs associated with: (a) scaling up both geographically and substantively the successful drought management and long term livelihood activities of the Arid Lands project in 28 districts; (b) reimbursing eligible and audited non -food expenditures associated with the severe drought which has affected the arid and semi -arid districts of Kenya over the last year; and (c) scaling up the drought contingency fund which is operating under the current credit and has been depleted due to the extended nature of the drought, " according to the proposed AF paper of July 10, 2006 (para\. 2, pg\. 2)\. US$ 118\.39 million of the US$ 120 million, or 99 percent, of the approved IDA financing, had been disbursed by project closure\. While the PAD, the project documents do not refer to cofinancing in their respective project cost and financing tables, the ICR identifies the European Union (EU) as a cofinancier of the project \. This financing was from the EU's Drought Management Initiative Trust Fund for a total of €8,5 million (US$11\.56 million equivalent), which became effective on September 29, 2007 and closed on December 31, 2010 when the IDA credit closed\. The ICR states that US$ 5\.9 million of EU drought financing could not be transferred to Kenya once IDA suspended disbursements in July 2010 (see Sections 8, 9 and 11b below) and was later canceled because the EU had been using the project's Drought Contingency Fund for disbursement (para\. 111, pg\. 38)\. Borrower Contribution: Both actual Borrower contributions, in the form of budget allocations, and local community contributions, in the form of cash, materials and labor, reportedly exceeded appraisal estimates, the former by 42 percent (US$ 28\.35 million as opposed to US$ 19\.85 million) and the latter by 18 percent (US$ 5\.96 versus US$ 5\.05 million)\. Dates: The project closing date was extended from June 30, 2009 for one year at the time the AF was approved, and was later extended for a further six months to December 31, 2010 to permit implementation of activities under the AF and facilitate transition to an expected follow -on project\. 3\. Relevance of Objectives & Design: a\. Relevance of Objectives: High The project’s objectives are relevant to the Bank's Country Partnership Strategy for the Fiscal Years 2010-2013, one of the key aims of which is to address resource constraints and environmental challenges, "including adaptation to climate change, in all projects and activities " (CPS, para\. 44, pg\. 19) as part of its efforts to contribute to more inclusive growth\. In this context, more specifically, the CPS affirms that "natural resources are critical to the livelihoods of the 65 percent of Kenyans who live in rural areas \.But Kenya's natural resource base is under stress \. Population pressure, deforestation, coastal modification, ongoing ecosystem degradation, unsustainable resource use and corruption threaten vulnerable habitats and biodiversity and continue to contribute to landlessness, poverty, social conflict and food insecurity \." (CPS, para\. 40, pg\. 16)\.The CPS also observes that Kenya is "vulnerable to climate change, due in particular to its reliance on rainfall both for agricultural growth and energy production, " noting further that "extremes of drought and flooding are becoming increasingly common \." Finally, it affirms that "to help Kenya to adapt to the destructive impacts of climate change, the Bank Group will strengthen its support for government efforts to manage the environment, adapt economic and social structures that better accommodate changing environmental circumstances, and diversify electricity generation away from hydroelectricity to offer green sources such as geothermal " (CPS, para\. 87, pg\. 37)\. Provision of “access to basic services â€? was also highly relevant to the 2010-2013 CPS, in that improving the availability of higher quality services such as water, human and animal health facilities, and education are major strategic goals of the Bank Group ’s strategy in Kenya as well as that of the Kenyan Authorities, both at national and local levels \. This is especially the case when the beneficiaries are members of rural communities subjected to the vicissitudes of climate change, such as in the drought -afflicted areas of the country\. The project's objectives were also relevant to the Bank's Country Assistance Strategy at the time the project was appraised and remained so during the course of implementation, as drought conditions not only persisted but became more serious, leading to the need for substantial additional assistance \. b\. Relevance of Design: Modest According to the PAD (pp\. 2-3), the development objectives were to be achieved by supporting "three complementary channels of intervention, which together address the complex channels of vulnerability, and enable communities in the project area to move beyond survival and subsistence to sustainable development : (i) strengthening and institutionalizing natural resources and drought management, which will improve the management of natural capital, reduce the impacts of natural shocks and diminish acute vulnerability by reinforcing preparedness and mitigation activities, and by improving the effectiveness of response interventions; (ii) empowering communities so that they can successfully identify, implement and sustain their development priorities through Community -Driven Development [CDD]; and (iii) fostering a conducive enabling environment for development in the arid lands through policy support, advocacy and improvement in the delivery of essential services, complementing existing sector programs\." While it is certainly plausible that, over time, these interventions would contribute towards the objectives of enhanced food security and reduced livelihood vulnerability, the causal chain between the project activities and the expected results within the timeframe of the project is weak \. Even if it is assumed that “strengthening and institutionalizing natural resources and drought management [through] vision and strategy,…\.improved natural resource tenure and control,…information and awareness creation, …\.institutional strengthening,…\.and conflict managementâ€? (PAD, pp\. 6-7) could be achieved within the proposed six year time frame, enhanced food security is not measured only, or even primarily, by reductions in food aid needs or the time needed for food aid to become available \. It depends also on factors such as increased agricultural production, import capacity and adequacy of stocks, stability of supply and access (measured by prices and the effects of food policies ), purchasing power, reliable transport and storage facilities, and food safety, hygiene and diet quality \. There is little in design to address these \. The causal chain between some of the outcome targets – for example, “increasing annual trend in the percentage of communities with food consumption above national food poverty line at historically driest month (pastoralists) and before harvest (farmers)â€? (PAD, pg\. 3) -- and project activities is also unclear \. More convincing is the link between drought preparedness and management and reduced livelihood vulnerability \. This relies principally upon an Early Warning System developed under the preceding project and described by the PAD (pg\. 8) as “operating successfully in the ten arid districts \.â€? Livelihood vulnerability was also to be mitigated through Community-Driven Development (CDD) of improved social infrastructure and service development, safety net mechanisms, and income generating activities supported by sub -projects\. There is a logical connection between these activities and the objective of enhanced access to basic services \. 4\. Achievement of Objectives (Efficacy): The project development objectives were "to reduce livelihood vulnerability, enhance food security, and improve access to basic services in 28 drought prone and semi-arid districts in Kenya\.â€? Objective 1: Enhance food security in 28 drought prone and marginalized communities in the Project Area \. Modest \. Outputs District Steering Groups (DSGs) were created in each of the 28 project districts to coordinate food security and drought management work at that level and help to increase efficiency of the pertinent government agencies in the field\. Some 107 agriculture-related emergency activities were undertaken in order to improve food security and expand production\. Outcomes Achievement of this objective was assessed with reference to the third key performance indicator : improved nutritional status of children under 5 years of age affected by severity of drought over time, using Mid -upper Arm Circumference (MUAC) measures\. For this purpose a two period (2005 and 2009) panel was used involving MUAC measurements of 602,000 children in ten districts\. Stochastic dominance analysis across the distribution of MUAC scores revealed improvements in nutritional status over time, and the impact evaluation concluded that the project "effectively functioned as a nutritional safety net for children of less than 5 years of age" (para\. 72, pg\. 22)\. However, attribution of the improvement to project -supported activities is not clearly established \. Moreover, enhanced food security is not measured only, or even primarily, by the nutritional status of children under five (which may improve because of temporary circumstances independent of sustained food security ), nor is it determined only by reductions in food aid needs or the time needed for food aid to become available \. It is determined by (i) food availability including domestic production, import capacity and adequacy of stocks as well as food aid; (ii) stability of supply and access, measured, inter alia, by prices and the effects of food policies; (iii) economic and physical access (incomes, purchasing power, extent and reliability of transport and storage networks); and (iv) food safety, hygiene and diet quality \. Little evidence is provided in the ICR concerning these dimensions\. Objective 2: Reduce livelihood vulnerability in 28 drought prone and marginalized communities in the Project Area \. Modest \. Area\. Outputs 717 natural resource management (NRM) and environmental awareness training sessions were conducted at district and community levels and included all 28 district field offices and development partners \. A minimum of 600 communities received training\. NRM plans were prepared for all 28 districts and were used for identification, prioritization and implementation of NRM micro-projects\. The vision and strategies emerging from these plans provided the framework for the design of the Arid and Semi-Arid Lands (ASAL) Development Policy and the District and National Environmental Action Plans \. Community level NRM plans constituted the major part of the 614 community development plans for the Community Driven Development (CDD) component\. The project supported 1,341 drought preparedness micro-projects\. In total (according to the Borrower’s ICR), 2,934 drought preparedness investments were made to improve water availability and access for human and livestock use\. 2,069 water activities were undertaken in 25 of the 28 districts\. These activities aimed to reduce distances to water points and provide a constant supply of water to humans and livestock during droughts \. Environmental screening tools were developed for micro -projects and inter-community projects\. The Early Warning System (EWS) that had been developed under the preceding project was enhanced (in terms of the data collected and analytical processes ), and expanded from 11 to 28 districts\. Early warning information was provided to all stakeholders to ensure timely response to drought stress \. A total of 2,965 activities were undertaken, including production of 2,336 ESW bulletins, as well as rapid food security assessments and community feedback meetings in all 28 districts\. Conflict flash points were identified and District Peace Committees established in all 28 districts; 214 conflict management meetings and 219 conflict resolution events were held \. Outcomes Drought-related vulnerability was measured by changes in beneficiary households' needs for free food aid, and in the time required for food assistance to arrive when still needed \. With regard to the former, a Long Rains Needs Assessment, carried out by the Kenya Food Security Group, indicated a reduction in the proportion of people needing food aid in the ASAL districts from 51% in 2000/2001 to 28% in 2008/2009\. However, this result is undermined by three factors : there are some differences in geographic coverage in the base years and final years, drought severity is not normalized, and it is not possible to determine attribution\. The ICR reports (pg\. 20) that, to address these issues, two further analyses were undertaken \. First, an Impact Evaluation carried out in 2009 by the International Livestock Research Institute (ILRI) analyzed data from 10 randomly selected project districts and from one reference district not benefiting from the project for the period from 2004/2005 to 2008/2009\. The 2004/2005 baseline data were taken from a statistical survey performed for the project by Kenya’s Central Bureau of Statistics in 21 ASAL districts covering 4,000 randomly selected households\. The Impact Evaluation found that there was “a decrease in food aid needs in most districts compared with the reference district â€? (ICR, page 21)\. However, the statistical extent of the decrease is not indicated, nor are there any details about the reference district (for example, how or why it was chosen )\. In order to establish attribution, cumulative project expenditures in the districts were correlated with the percentage of people needing food aid\. The negative correlation was found to be statistically significant in the arid districts covered (which benefited from all three project components ), but not statistically significant in the semi -arid districts which benefited only from Component 1 (Natural Resources and Drought Management )\. Of the 28 ASAL districts, 11 were arid and 17 semi-arid (ICR, pg\. 4 and pg\. 30)\. Second, an analysis over the period 2005-2009 was carried out by the ICR team using sub -district (division) level data from the project-supported household early warning system (EWS), satellite-based rainfall estimates, and information from project-supported micro-project investments\. The analysis covered 51 treatment and 46 control divisions, approximately equally divided between arid (52) and semi-arid (45)\. The results indicate a 19\.7% difference between treatment and control divisions in terms of the percentage change in the proportion of people assessed as needing food aid \. This result was statistically significant at 5%\. However, the absolute fall in the share of the population needing food aid in the treatment divisions was only 1\.7% on average (from 31\.9% to 30\.2%)\. For the ASALs as a whole (arid and semi-arid), the average fall (weighted by population) was 4% (from 27\.2% to 23\.2%)\. Overall, there is evidence indicating a small decrease in the food -aid needs of the population benefiting from the project in the arid districts (11 of the 28 covered) which were targeted by all three components \. Also in the arid districts, there is a statistically significant correlation between this decrease and cumulative project expenditures indicating a reasonable degree of attribution \. In the semi-arid districts, attribution is less clear \. With regard to speed of response, the ILRI impact evaluation indicated that users of the EWS monthly bulletins, produced and disseminated in the project area and at national level on a monthly basis, reduced their average response time to drought-related emergencies from 7\.6 weeks in the year 2000 to 3\.5 weeks in 2009\. “The analysis is based on a survey by ILRI of [District Steering Group] members in 10 study districts to find mean response times for users and non -users\. The [District Steering Group] comprises all relevant actors (international organizations, line Ministries, NGOs, community -based organizations and donors, with the [Project Coordination Unit] acting as secretariat) that influence or are directly involved with emergencies at district level â€? (ICR, pg\. 22)\. The ICR goes on to say that 78% of all relevant organizations used the bulletins in 2009, up from 32% in 2000\. It is unclear where the 2000 baseline data come from\. There is also no comparison with control groups which did not use the monthly bulletins \. The ICR reports that at three stakeholder workshops organized by ILRI, a high percentage of participants stated that response times had improved \. The ICR team observes that, although the project had closed at the end of 2010, “the EWS system of data collection and preparation of the regular monthly bulletins was still taking place and playing a critically useful role in supporting the response by the [Kenya Food Security Steering Group ] and partners to the severe drought in 2010/11â€? (ICR, pg\. 34)\. Conflict resolution, especially concerning the use of scarce resources, is an important dimension of reducing livelihood vulnerability to drought \. There were no indicators of the outcomes of the project ’s extensive conflict resolution activities\. However, the ICR team received “consistently positive feedback from donors, beneficiaries and other stakeholders on the effectiveness of [the project’s] conflict resolution effortsâ€? (ICR, pp\. 27-28)\. The ICR acknowledges that a reduction in tension and violence in the arid and semi -arid lands cannot be inferred from this since there are, as yet, insufficient long -term data to support such an assessment \. Objective 3: to improve access to basic services in 28 drought prone and semi -arid districts in Kenya \. Substantial \. Outputs More than 2000 water activities -- including drilling and rehabilitation of boreholes, purchase of pumps, provision of fuel supplies, support to rapid response teams to ensure continuous functioning of boreholes, and water trucking, among other actions – were undertaken in all but three project districts \. A total of 223 health and nutrition emergency responses were realized, including rapid responses to disease outbreaks (malaria, cholera, diarrhea, measles and aflatoxicosis, among others )\. About 3,000 micro-projects, benefiting a total of some 1\.9 million people (55% of whom were women) were implemented in 614 communities\. These are additional to the drought -preparedness micro-projects but may include some of the 2,000 water activities, referred to above \. The most common projects included water, agriculture, education, health and sanitation \. Livestock, access roads, and other income -generating activities, were also supported\. Outcomes The ILRI Impact Evaluation compared changes in access to basic services between 2004 and 2009 in beneficiary and control locations \. The former experienced statistically significant improvements in access to quality water sources, primary, secondary and adult education, and to veterinary medicines \. The percentage of households consulting medical professionals, using bed nets, and seeking veterinary extension services also increased, and negative health -related outcomes, including prevalence of child diarrhea and livestock mortality, decreased\. Animal mortality declined by a quarter and deaths from diseases by nearly half \. Although differences between beneficiary and control areas were not statistically significant, this is probably because other development partners were supporting similar improvements in the control areas \. In project areas, there was a considerable amount of service -related investments supported by the project and consequently a clear improvement in access in project areas \. The Impact Evaluation found that between 2003 and 2009 mean household time to water sources fell from 85 minutes to 42\.6 minutes in the rural Northeastern province as a whole, while the national average did not change significantly, but there is no analysis at the level of ASAL districts or comparison between beneficiary and control areas\. The ICR team calculated that mean distances to bore holes, shallow wells, and pans and dams decreased by between 0\.8 and 3 kilometers across the project area \. “Although it was not possible to determine attribution, [the project] did make a significant number of water investments between 2004 and 2008â€? (ICR, page 23)\. 5\. Efficiency: While the PAD did not provide an ex -ante economic analysis for the entire project, it did assess several of its activities (irrigation, rain-fed agriculture, petty trade, livestock trade and apiculture ), concluding that they were all financially viable\. The ICR, however, estimates -- and details in a specific Annex -- the net economic benefits resulting from two sets of project activities : (i) micro-project investments that led to increases in income as a result of new or increased sales of livestock and livestock products, milk, crops and fish; and (ii) project-invested resources in the water and livestock sectors (e\.g\., livestock restocking, veterinary services and improved access by animals to water sources) that resulted in gains in livestock wealth, arguing that "as a consequence of the fact that livelihoods in the project areas depend on livestock -- both as a source of milk that is a valuable nutrient and an important source of income, and, in addition, as an instrument that aids in mitigating income shocks -- the (counter-factual) gains in livestock wealth are most closely related to the project's development objective " (ICR, Annex 3, para\. 2, pg\. 61) To arrive at an ERR for all micro-projects, the returns based on analysis of a reportedly representative sample were weighted in proportion to overall project expenditures, resulting in an estimated overall ERR on micro -project investments of 37 percent\. The ICR does not indicate what percentage of total project expenditures went into micro-project investments, however \. To evaluate gains in livestock wealth, the ICR made use of historical weather station rainfall estimates in Garissa, observing that it made the "conservative assumption that, absent project interventions, livestock in Garissa would have fallen by 18 percent in 2005 and 2008\." On the further assumption that Garissa was "broadly representative of other project districts on metrics related to changes in precipitation and livestock," the ICR assumes that there was a 10 percent counterfactual increase in livestock due to project investments, on the basis of which the gains from project investments in the water and livestock sectors were estimated to have an ERR of 28\.2 percent\. On the basis of these two partial ERR figures, the ICR estimates the project's overall ERR to be 31\.1 percent on the additional assumption that 20 percent of the project funds were misused\. However, it also carries out a sensitivity analysis to take into account the possible impact of the alleged misuse of project funds, with the resulting ERR estimates varying from 15\.6 percent if half of all project resources had been misused to 40\.4 percent if none were misused, concluding in the main text that "under the range of assumptions about the extent of the possible diversion of funds from 0 percent to 50 percent the project was economically viable and the costs incurred were justified " (ICR, para\. 78, pg\. 25)\. In addition to the above, the ICR attempted to assess project cost -effectiveness relative to normal Kenyan Government activities for similar activities, but was unable to "capture comparative data\." It affirms, however, that the ICR team "does not anticipate that there would be major differences because line agencies were so heavily engaged through the DSGs [District Steering Groups] and METs [Mobile Extension Teams] that standards probably did not differ greatly\." It was similarly unable to judge the cost -effectiveness of the EWS vis -a-vis those in other countries "because each is quite different in terms of needs, coverage, technological features, and other factors " (ICR, paras\. 79-80, pp\. 25-26)\. There were significant fiduciary issues involving the misuse of at least US$ 3\.8 million of IDA Credit resources (see Sections 8, 9 and 11 below)\. The outcome of the forensic audit of these issues remained uncertain at the time of ICR finalization, and the extent of the problem was unknown \. In view of this, and of the limitations with respect to the ERR calculations and data availability (ICR para\. 82, pg\. 26), efficiency is rated Negligible \. ERR )/Financial Rate of Return (FRR) a\. If available, enter the Economic Rate of Return (ERR) FRR ) at appraisal and the re- re -estimated value at evaluation : Rate Available? Point Value Coverage/Scope* Appraisal Yes 31\.1% 26% ICR estimate No * Refers to percent of total project cost for which ERR/FRR was calculated\. 6\. Outcome: Relevance of project objectives is rated high, while that of relevance of design is rated modest \. The efficacy of two out of three development objectives -- reduced livelihood vulnerability and increased food security -- is rated modest, while that of the third -- enhance basic services –– is rated substantial\. Efficiency is rated negligible in view of the alleged misuse of IDA resources \. Overall outcome is assessed as Moderately Unsatisfactory \. a\. Outcome Rating : Moderately Unsatisfactory 7\. Rationale for Risk to Development Outcome Rating: Three main risks to development outcome were identified and assessed : (i) satisfactory continuation of the Early Warning System(EWS), institutional arrangements and inter -agency coordination; (ii) the sustainability of reduced vulnerability in the ASALs; and (iii) sustainability of empowerment and other social development gains \. In addition, the alleged misuse of IDA funds points to a financial risk \. Risks to a satisfactory continuation of the EWS and related arrangements \. The severe drought of 2011-2012 demonstrated both the importance and the effectiveness of the institutions and arrangements put in place or strengthened under the project \. These continued once project financing had ceased, albeit at a lower level of funding \. They performed satisfactorily for the resident population, although the ICR (page 33) reports that they were insufficient to cope with the influx of refugees from neighboring Somalia \. Staff were largely retained, despite several months with no salary payments \. IDA and other donors remain engaged in arid and semi-arid areas\. However, the Government is still in the process of mainstreaming some critical institutional features (for example, the Drought Contingency Fund may require modification to accommodate the new national constitution\. Some issues raised by the forensic audit require resolution and may affect sustainability \. Overall, this category of risks is rated moderate\. Risks to the reduction in livelihoods vulnerability \. The notable achievements in reduced vulnerability to droughts in the ASALs are tenuous and will need continued, scaled-up investment support to ensure their sustainability \. A number of the community-driven micro-projects also require immediate attention to define responsibilities and funding for operations and maintenance\. Some activities will be constrained, or even threatened, by the lack of micro -finance services in the ASALs\. Continued deterioration brought about by climate change may increase possibilities of conflict over resource use\. These risks are, however, mitigated by continuing commitments and active involvement from external partners, including the IDA -administered GEF Kenya Adaptation to Climate Change Project, approved in June 2010\. Overall, this category of risks is assessed as moderate\. Risks to the sustainability of empowerment and other social development gains Local women now play a much more proactive role in meetings in part because they have benefitted directly from income-generating micro-projects, while the ICR (page 35) observes that "communities that have developed the confidence and skills to seek out service providers rather than wait to be attended, if at all, will not lose these capacities\." However, progress in empowerment and related social gains was notably stronger in the arid districts that had benefited from all three project components, and "sustaining and building on achievements to date will require not only scaled up implementation of ALRMP II's participatory investment activities, but -- equally important -- a strong voice at the national policy -making level on behalf of the ASALs, supported by a sound knowledge base drawn from real-time work and informed by active local participation, increasingly robust data and good analytical capacity" (ICR, page 35)\. A need remains for several project -related organizations to be institutionalized and /or scaled-up, such as the District Peace Committees, which play a positive role in conflict resolution \. One such key agency, the National Drought Management Agency, was formally established after the project closed even though the associated National Drought Contingency Fund had not yet been set up at the time the ICR was finalized \. Overall, this category of risks is assessed as moderate\. Financial risk \. The alleged misuse of IDA funds, an issue which had still not been fully and satisfactorily resolved at project closure, indicates the presence of financial risk \. Internal financial controls clearly need strengthening \. Further externally-supported operations will provide opportunities to address this issue \. Overall this risk is considered moderate\. a\. Risk to Development Outcome Rating : Moderate 8\. Assessment of Bank Performance: a\. Quality at entry: Positive aspects of quality at entry included linking natural resource management and conflict resolution, multi-sectoral and interagency coordination on drought management at various levels, and the use of community-based early warning systems (EWS)\. In addition, the objectives had high strategic relevance, a good effort was made to incorporate the lessons of past experience in the country and the Region, and the range of skills in the Bank and FAO preparation team was appropriate \. However, there were also significant shortcomings, as reflected in the subsequent need to adjust some of the initial Key Performance Indicators in the M&E Framework, the missed opportunity to draw on the extensive experience with Community -Driven Development projects outside of Africa, and insufficient attention to the design of internal financial controls which may have subsequently contributed to the misuse of project funds in a number of project districts \. at -Entry Rating : Quality -at- Moderately Unsatisfactory b\. Quality of supervision: The positive dimensions of the quality of supervision included a team with a strong skill range, an appropriate mix of headquarters and country -based staff, and considerable continuity \. There were regular, twice-yearly supervision missions\. Supervision reports were candid and informative \. Safeguards and fiduciary post -reviews took place on schedule and were followed up \. However, supervision could have given greater attention to national policy aspects and responded more adequately to the increased supervision requirements resulting from the significant expansion of project activity and geographic scope that occurred with approval of the AF in mid-2006\. There were major shortcomings in Bank performance with regard to the use and management of the project's financial resources\. A complaint had been lodged in early 2007 regarding the lack of proper accountability of project funds, and an internal review conducted \. As the ICR (pg\. 37) acknowledges, these weaknesses should have been detected earlier by Supervision, particularly with respect to internal control systems and record keeping, and they should have been acted upon in a more timely and systematic manner \. The effectiveness of corrective measures recommended by the internal review cannot be determined because of “loss of recordsâ€? during INT’s subsequent forensic audit (ICR, pg\. 17)\. “At the time of the 2007 report, INT reviewed the response of the [Government of Kenya] and determined that further action by INT was not then required\. The issue was reopened in early 2009 in response to an in-depth review of several projects in Kenya by the Bank’s Financial Management team and to a renewed external report of irregularities â€? (ICR, pg\. 18)\. INT began investigations and made a “verbal reportâ€? to Bank Management in June, 2010, “indicating that a high share of expenditures incurred in financial years 2007 and 2008 in seven districts reviewed by INT were questionable and suspected fraudulent â€? (ICR, page 18)\. On the basis of this, Management suspended project disbursements “informallyâ€? in July, 2010\. INT’s findings were, however, not disclosed to the Government until April, 2011 (ten months after INT’s verbal report to Management), with further annexed details in June, 2011\. The report was published on INT’s website in July, 2011\. The share of questionable expenditures in INT ’s written report was considerably lower than that contained in the earlier verbal report to Management \. The Government’s Internal Audit Department (IAD) questioned both INT’s methodology and conclusions \. Nevertheless, in November 2011, the Government agreed to repay IDA US$ 3\.8 million equivalent\. The disagreements between INT and IAD were still unresolved when the ICR was completed \. INT's delay in completing and processing the forensic audit, and the lack of a clear resolution by closure of the extent to which project funds had been misused during 2007-2009, reduced the project's beneficial impact by a notable extent\. The suspension of disbursements took place at a time when drought conditions in the project area were worsening\. Project outcomes (see Section 4 above) could have been more favorable had this suspension not occurred\. It resulted in the reduction of total IDA financing for project -related expenditures by US$5\.7 million\. It also adversely affected parallel funding from other sources, including US$ 5\.9 million equivalent from the European Union (EU), which was using the project-established Drought Contingency Fund, as well as a US$ 5\.5 million IDA-managed GEF grant, which would have relied on project institutions for its implementation, but effectiveness of which was delayed as a consequence \. The informal suspension precluded the use of the project as "a vehicle for quick conveyance of additional financing to the affected area during the peak of the drought, " according to the ICR (para\. 111, pg\. 38)\. According to the ICR (pg\. 37), "Because the suspension was informal, it was not processed through the Legal Department as per OP/BP 13\.40, although the Board received a verbal briefing of the suspension the day after it was put into effect (in an informal briefing on Kenya that had previously been scheduled )\." The ICR states further (para\. 113, pg\. 39) that: "OP 13\.40 was not observed when Bank management informally suspended \. Compliance with OP 13\.40 would have required review and clearance by the Legal Department that a case for suspension was justified under the terms of the Credit Agreement; formal notification to the Board; formal consultation and notice to any affected Cofinanciers (in this case, the EU); and formal notification to the Borrower with opportunity to respond\. Because INT in July 2010 had provided a verbal rather than a written preview of its findings, management was unable to provide the Legal Department with a documented basis for formal suspension\. But because management also felt that the INT findings were alarming and that it could not fail to act on them, however preliminary, it decided to implement an informal suspension, pending the availability of documentation to provide the basis for a formal suspension \. In addition, to ensure that OP 13\.40 was observed in spirit to the greatest extent possible, the Board was verbally notified of the informal suspension one day after it was decided; and the [Government of Kenya] and affected Cofinanciers were verbally informed of INT ’s findings and the management decision to suspend the project within a few weeks of the informal suspension \. The lack of a documentary basis for the decisions taken impeded the ability of management, the [Government] and the Cofinanciers to discuss the issues raised or indeed to respond to any of the INT findings, putting a serious strain on all project-related discussions, decisions and activities \." Quality of Supervision Rating : Unsatisfactory Overall Bank Performance Rating : Unsatisfactory 9\. Assessment of Borrower Performance: a\. Government Performance: Positive aspects of Government performance included a commitment to project objectives and activities and the adequate and timely provision of counterpart funds \. Inter-ministerial coordination at the district level worked well, and the Government attempted to keep project staff in place and to continue its activities, particularly those related to drought management, even after the suspension of IDA disbursements \. However, Government’s financial control mechanisms should clearly have been stronger, particularly at district and community levels \. Government Performance Rating Moderately Unsatisfactory b\. Implementing Agency Performance: The main implementing agency was the Project Coordination Unit (PCU)\. In 2003, the PCU moved from the Ministry of Provincial Administration to the Ministry of State for Special Programs, both in the Office of the President\. In 2008, it moved again, to a newly created Ministry of State for Development of Northern Kenya and Other Arid Lands, coordinated by the Prime Minister \. Positive aspects of PCU performance include a high level of commitment and core staff continuity and its ability to hire and retain excellent personnel at the district level, together with its record of responding rapidly to problems once they became known \. Nevertheless, material control weaknesses in both the Unit itself and at the district and community levels constitute major shortcomings in the performance of the PCU and those responsible for implementation on the ground\. Financial management reviews found "instances whereby project funds were not properly accounted for, or the payments were otherwise not properly supported in terms of internal financial controls and accountability with regard to the use of project funds â€? (ICR, pg\. 17)\. These findings were not identified or acted upon in a timely manner\. The sizeable expansion of project area at the start of ALRMP II, and again at the time of the Additional Financing, should have been occasions for the PCU to rethink some organizational issues in order to oversee effectively the much scaled up set of responsibilities \. More frequent technical field visits would have provided more reliable feedback on the many dispersed activities supported by the project \. Reinforcing the staff responsible for monitoring and evaluation could also have produced more timely management information \. While the PCU was committed to empowering communities, the need for greater clarity in decision -making responsibilities and accountabilities at community and district level could have been detected earlier \. Both the Project Paper and a letter from the Government dated June, 2006, set out specific disclosure requirements \. Despite this, not all the stipulated documents were disclosed, for example, District Annual Progress Reports, District Annual Work Plans, and Printed Estimate at Headquarters Level \. Implementing Agency Performance Rating : Unsatisfactory Overall Borrower Performance Rating : Unsatisfactory 10\. M&E Design, Implementation, & Utilization: a\. M&E Design: According to the ICR, "despite the avowed intent to strengthen M&E, " the PAD's treatment of this subject was "somewhat diffuse\.[referring] to a baseline to be initiated before credit effectiveness, a program of ongoing and periodic evaluations (including mid-term and final termination evaluations ), and a system of routine records and periodic monitoring reports at community, district and project levels \." However, detailed arrangements, including "clear responsibilities and procedures for M&E, " were put off until after approval, which led the ICR to conclude that there was "inadequate consideration of the project's M&E needs during preparation \." It also noted that some of the original Key Performance Indicators (KPIs) "complemented by an unwieldy set of 25 intermediate outcome/output indicators" later needed to be revised and that baseline data were not included in the log frame "although in many cases the team could have done so based on its knowledge of the first phase project \." Few indicators, moreover, had quantitative targets\. (ICR, para\. 40, pg\. 11) M&E design, in short, was weak\. The Project Coordination Unit had overall responsibility for M&E coordination \. b\. M&E Implementation: M&E implementation experience was also mixed \. Despite the existence of numerous good instruments and much pertinent information (see the next section for details ), the ICR observes that "the absence of a clear analytical structure to guide data collection, entry and analysis means, however, that much of the information on hand may be difficult to recompile/compare in a statistically robust manner [and]\.also made it difficult for the project to respond quickly and with comprehensive information to public criticisms when they arose " (para\. 41, pg\. 11)\. On the positive side, supervision reports indicate the task team's preoccupation to strengthen M&E, including through revisions to the KPIs that were processed in parallel to the AF in 2006\. In addition, a statistical baseline survey was undertaken by the Central Bureau of Statistics on behalf of the project in 21 of the 28 ASAL districts in 2004/05 surveying 4,000 randomly selected households, and a final impact evaluation was later commissioned to the International Livestock Research Institute (ILRI), involving a resurvey of another 4000 households using a similar questionnaire in June-August 2009\. c\. M&E Utilization: The project had a "very elaborate" Early Warning System (EWS) database involving information collected from some 10,000 household questionnaires applied on a monthly basis, the results of which were processed, made available by Internet and distributed to the districts \. This information is reportedly "widely used" by the Kenya Food Security Steering Group\. The project also has participatory needs assessments and plans for all 28 beneficiary districts, assessments of potential conflict "flashpoints" for all of the districts, annual progress reports for each district, and environmental audits which were conducted annually \. The 2004/05 and 2009 surveys and the associated impact evaluation, among other results, made it possible to determine project impacts on the nutritional status on "the worst off children\." In addition, qualitative information was collected through focal group discussions in 21 of 24 "treatment" communities, which the impact evaluation used to prepare a "social network analysis of changes in empowerment and ability to access services \." (ICR, para\. 44, pg\. 12)\. M&E Quality Rating : Modest 11\. Other Issues a\. Safeguards: The project was classified as Category “Bâ€? for Environmental Assessment purposes \. As well as Environmental Assessment (OP 4\.01), the Natural Habitats (OP 4\.04), Pest Management (OP 4\.09), and Indigenous Peoples (OP 4\.10) were triggered (PAD, p\. 27)\. No social safeguard policies were triggered \. Up-front environmental assessment work was judged adequate by the Regional Safeguards Advisor \. Environmental audits carried out during implementation from 2005-08 and 2010 were found to be "technically sound and thorough, " both by Kenya's National Environmental Management Authority, which routinely reviewed their findings, and the ICR team, which reviewed two of these audits ex-post\. Bank environmental specialists systematically participated in supervision missions and aide memoires addressed environmental issues and follow -up requirements\. No significant issues were reported, although the ICR does not specifically discuss experience in relation to each of the triggered safeguard polices mentioned above, nor does it contain an explicit statement that the policies were complied with \. b\. Fiduciary Compliance: Financial management \. As indicated in Sections 8b and 9b above, fiduciary compliance was problematic and showed evident weaknesses in internal financial controls \. According to the ICR (para\. 56, pg\. 17), in addition to the existence of material internal control weaknesses in the Project Coordination Unit (PCU) and at the district and community levels, financial management reviews found "instances whereby project funds were not properly accounted for, or the payments were otherwise not properly supported \.These weaknesses were not detected before 2007, when a complaint was lodged and an internal review undertaken \." As a result, "adjustments" in internal controls were introduced, but their effectiveness is "not known due to the loss of records during the forensic audit and the absence of a transaction -level audit subsequent to the introduction of changes \." In 2009, INT initiated a review of possible fraud and corruption based on outside reports of irregularities dating back to May 2007 and which suggested that a significant share of project expenditures in seven districts in 2007 and 2008 were "questionable\." A verbal report to IDA Management in June, 2010, led the latter to suspend disbursements informally as of July 2010\. INT's preliminary report, which was published in July 2011, was subsequently disputed by Kenya's Internal Audit Department that questioned INT's methodology and findings regarding the extent of the misuse of project funds \. A Board discussion was held in October 2011, and the Kenyan Government agreed to repay the equivalent of US$ 3\.8 million a month later, even though the dispute over INT methodology and findings of the forensic audit had still not been resolved at the time the ICR was finalized \. INT later indicated that it wanted to conduct an expanded audit of expenditures in all 28 project districts, and draft Terms of Reference were developed \. However, according to the project team, this audit has not yet taken place \. Procurement was supervised twice a year \. Each mission covered a few districts on an alternating basis due to the widespread nature of the 28 project districts\. Post procurement reviews were conducted once a year for the districts covered during supervision missions \. Although there was an expectation of a gradual improvement in governance following introduction of the multiparty system in 2002, the pace of procurement reforms initiated in 1998 was sluggish and the rating of project procurement risk in supervision reports remained high throughout implementation \. c\. Unintended Impacts (positive or negative): The ICR (paras\. 98-99, pp\. 31-32) identifies two pertinent unintended positive impacts : (i) Kenya's successful project-related Early Warning System experience has contributed to the development of similar systems in other countries, including Ethiopia, South Sudan, Syria and Uganda; and (ii) both this and the first phase projects have generated considerable knowledge about the impact of accelerating drought conditions on pastoralists and small farmers in arid and semi-arid areas, including with respect to "their coping strategies, resilience, willingness, and capacity to adapt to climate change \." d\. Other: The project demonstrated positive impacts in terms of gender mainstreaming and inclusion, and empowerment \. The Borrower's ICR and stakeholder consultations indicated that the project had a substantial positive impact on gender mainstreaming and inclusion \. The ICR observed that "increased access to water, education and health care is credited with having benefited girls and women disproportionately, as they are traditionally disadvantaged in access to these services and bear the burden of providing water for the family \." It also noted that over 40 percent of Community Development Committee (CDC) members in most districts were women and women accounted for more than half of all CDD trainees (para\. 90, pg\. 28)\. With respect to empowerment , the ICR also observed positive results based on the "social network analysis" undertaken as part of the final impact evaluation, concluding that the project played "an important linking function" between communities and service providers, especially in the arid districts \. The impact evaluation showed a threefold increase in the extent to which the project acted as an intermediary between parties who would not otherwise have been linked (ICR, para\. 93, pg\. 29), and anincrease of 54 percent in the extent to which communities proactively sought services from providers \. 12\. 12\. Ratings : ICR IEG Review Reason for Disagreement /Comments Outcome : Moderately Moderately Relevance of project objectives is Satisfactory Unsatisfactory rated high, while that of relevance of design is rated modest\. The efficacy of two out of three development objectives -- reduced livelihood vulnerability and increased food security -- is rated modest, while that of the third -- enhance basic services –– is rated substantial\. Efficiency is rated negligible in view of the alleged misuse of IDA resources\. Risk to Development Moderate Moderate Outcome : Bank Performance : Moderately Unsatisfactory The weaknesses in project financial Unsatisfactory management arrangements that were identified in 2007, 2008, and 2009 should have been detected earlier by Supervision\. INT's delay in completing and processing the forensic audit, and the lack of a clear resolution by closure of the extent to which project funds had been misused during 2007-2009, reduced the project's beneficial impact by a notable extent\. Together with the fact that "OP 13\.40 was not observed when Bank management informally suspended" (ICR, page 37), these constitute major shortcomings in Bank performance\. Borrower Performance : Moderately Unsatisfactory Material control weaknesses in both the Satisfactory PCU itself and at the district and community levels constitute major shortcomings in the performance of the Implementing Agency and those responsible for implementation on the ground\. There were instances where project funds were not properly accounted for, or the payments were otherwise not properly supported in terms of internal financial controls and accountability with regard to the use of project funds\. Quality of ICR : Satisfactory NOTES: NOTES - When insufficient information is provided by the Bank for IEG to arrive at a clear rating, IEG will downgrade the relevant ratings as warranted beginning July 1, 2006\. - The "Reason for Disagreement/Comments" column could cross-reference other sections of the ICR Review, as appropriate\. 13\. Lessons: The ICR presented a number of valuable lessons, including those related to climate change, natural resource management and Community-Driven Development projects more generally \. Among the most important of these lessons are the following: Adaptation to longer-term climate change can be pursued jointly with management of short -term climate-related emergencies, such as severe and persisting droughts, but requires explicit attention \. Conflict resolution can be integrated into natural resource management interventions in fragile areas experiencing climate change stress, as occurred in the present project \. Putting in place flexible institutional arrangements that development partners can use to channel support quickly, before climate emergencies occur, can help to improve coordination and efficiency \. Community Driven Development operations need strong social accountability arrangements to minimize corruption risks and strengthen local governance, as was the case in this project given its strong emphasis on beneficiary participation and empowerment at the local level \. To these IEG adds the following lesson concerning financial management : Adequate financial control systems, established at the design stage, are essential, especially in a governance-challenged environment, for early detection of possible fiduciary issues \. Once issues have been detected, it is important that the subsequent investigation conform to all the formalities of consultation and notification, and that a special effort be made to achieve timely resolution of differences in perception between the Bank's investigatory team and the Borrower's own auditing body \. 14\. Assessment Recommended? Yes No 15\. Comments on Quality of ICR: Although the ICR is lengthy (45 main text pages), it is well-written, analytical, and candid \. The ICR’s annex analyzing the links between output/intermediate outcome and outcome indicators is comprehensive \. The lessons are numerous and valuable, especially given the rising concern regarding effective adaptation to the social, economic and environmental impacts likely associated with climate variability and change \. The ICR contains a detailed treatment of the INT investigation of the alleged misuse of funds, and its analysis reflects the state of knowledge at the time of the ICR ’s completion\. Nevertheless, and given the nature of the fiduciary issues in a governance -challenged environment and the need for full information from a Bank accountability point of view, it would have been useful to have known the full extent of the problem and the measures taken to address it\. For the most part, the ICR provides solid empirical evidence in support of its assessment of project achievements, with the exception of the rather limited set of indicators used to assess enhanced food security \. While the economic analysis of micro-projects is thoughtful, it would have been useful if the proportion of total project costs covered by the analysis had been clearly indicated \. Also, some data availability problems could not be overcome \. a\.Quality of ICR Rating : Satisfactory
REVIEW