text
stringlengths 9
324
| label
int64 0
10
|
---|---|
Route pull-up cord through grommet in bottom flap. Pull up closing loop and reinsert temporary | 3 |
Moral rights of creators | 7 |
Ground-based Facilities | 7 |
Cylinder Power Stroke—Final Piston Moving Down | 7 |
fuel becomes so hot it vaporizes in the fuel line, not allowing | 9 |
Airport Markings and Signs | 7 |
to verify the timeliness and source of the weather information | 9 |
and type of certificate held by the person performing the | 9 |
(amendments | 3 |
directly or | 9 |
Contract number: | 5 |
Secrétariat | 3 |
If the rich limit of fuel-air ratio is exceeded | 9 |
if the altitude is held constant. | 3 |
State for Transport acting jointly on a reference to them by the Authority or the Agency, after | 9 |
The Agency shall assist the Commission, in | 3 |
gear extension. Activated from the flight deck, when the | 9 |
but they may re-form over the warmer land surface. As an | 9 |
shall consist of the President and a | 9 |
crew as promptly as possible. If the wait is likely to be long, | 9 |
campaigns | 9 |
über die Teilnahme an einer Überprüfung der praktischen Fähigkeiten. | 9 |
Réclamations et responsabilité | 7 |
flight plan. | 9 |
Name des Auftragnehmers; | 3 |
A valve in the | 9 |
End Voltage Level: | 9 |
る貨物(別表第二の一、三六、三九から四一まで及び四三から四五までの項の中欄に | 3 |
, due in month 13 of the contract. | 3 |
Engine Instruments | 7 |
zuletzt durch Artikel 13 des Gesetzes vom 17. Dezember 2018 (BGBl. I S. 2549) geändert worden ist" | 9 |
Article II-22 | 7 |
the period of time since any such compensation was paid, and | 3 |
の四各号に掲げる事項を行わなければならない。 | 3 |
Using excessive power combined with a level attitude, | 3 |
of the withdrawal of its intention to reduce payment; or | 3 |
II.24. CHECKS AND AUDITS | 7 |
JET ACFT | 6 |
auf Verlangen | 3 |
European Food Safety | 6 |
(四)海洋功能区划,是指依据海洋自然属性和社会属性,以及自然资源 | 9 |
drilled holes. Hex, close-tolerance, and internal wrenching | 9 |
whatever upon goods and merchandise carried into the township, or out of the | 9 |
Tools and Maintenance Equipment | 7 |
anything done under the authority of a licence issued by the Governor under this paragraph. | 9 |
法第六十九条の六第二項第二号に規定する政令で定める貨物は、別表第一の | 3 |
[1407-4; 1679-1 (Bur. Civ. Serv.); Comp., 681.] | 9 |
The Services shall be provided from the [Ef | 3 |
instrument head. | 9 |
APPROPRIATE ATS AUTHORITY [ICAO]- The | 9 |
ischarge the functions of his or her | 9 |
This is possible on aircraft with V–tail | 9 |
effective dose limit and the equivalent dose limit specified in Article 30-27: | 3 |
of the proper judge of first instance, be sufficient ground for the revocation of his | 9 |
found in communications and navigation avionics. In-depth | 9 |
I.16 and II.18 of the FWC, if the contractor fails to meet his obligations, | 3 |
aggiunta di nuovi elementi, paragrafi, titoli, cappelli, grassetti, legende, indici, sunti, | 3 |
should be withdrawn at intervals to relieve chip packing and | 9 |
Amendment to the Electronic Monitoring (Responsible Persons) Order 2018 | 7 |
ROUNDS FOR REJECTION FROM THIS PROCEDURE | 7 |
define certain requirements of lateral control | 9 |
[Figure 3-21] | 9 |
Rigging Fixtures | 7 |
Glide Slope/Glide Path | 7 |
.......................................................................................... | 3 |
Perceive the given set of circumstances for a flight | 3 |
Article I-15 | 7 |
setting the stop, tighten the setscrew and complete the bend. | 9 |
Inspect exhaust for cracks, security of mounting, | 3 |
Article II-10 | 7 |
accelerating on | 9 |
in main longitudinal bars at 12 m nominal intervals. Joints in adjacent bars shall be staggered at least 1 | 9 |
Bauvorhaben ………………………………………… | 7 |
Paved, level, dry surface | 6 |
ARTICLE 9: PLACE OF PERFORMANCE | 7 |
II.15.3 Claims and liability | 7 |
Normal Reactions to Stress | 7 |
I.9. PROCESSING OF PERSONAL DATA | 7 |
Rejection from the procedure | 7 |
only capable of receiving broadcasts from 1090ES- | 9 |
Figure 9-56 | 9 |
Distance and direction with respect to a | 9 |
the determination of the panel is (subject to assessment by a health care professional of | 3 |
Inability to Restart a Self-Launching/Sustainer | 7 |
Analyzing Procedures | 7 |
from the branch of the serv | 9 |
proposals for future improvements. | 9 |
If the contractor repeatedly refuses to sign the specific contracts or repeatedly fails to send | 9 |
Bekanntmachungstext | 7 |
Incorrect valve clearances | 3 |
Duration of the contract | 7 |
Verordnung über die Berufsausbildung zum | 10 |
Licensing Team within 24 hours of issue; | 3 |
Contracting Authority | 7 |
Air Data Attitude and Heading Reference System | 9 |
the exhaust gases as they enter the tail pipe after | 3 |
8_Vol3_d4 3_Section 8 electrical works_en_GIR rev6.doc | 4 |
Hi-Tigue$^{®}$ Fastening System | 7 |
slope information. Disregard all glide slope signal | 9 |
(一)海洋环境污染损害,是指直接或者间接地把物质或者能量引入海洋 | 9 |