Business Requirements Document

Document Information

  • Document Title: Business Requirements Document
  • Date: [Insert Date]
  • Author: [Insert Author Name]
  • Version: [Insert Version Number]

Executive Summary

2.1 Purpose

Briefly describe the purpose of the POC and the document.

2.2 Project Background

Provide a brief context for the POC, including the business problem it aims to address.

2.3 Scope

Outline what the POC will cover and what it will not cover.

Business Objectives

3.1 Goals

  1. Detailed discussions with stakeholder groups for gathering requirements.
  2. Expanding success criteria to include user acceptance testing results.
  3. Addressing time constraints and technical debt issues.
  4. Mitigating risks like data breaches and project delays.
  5. Upgrading database architecture, developing analytics functionalities, and enhancing user interface.
  6. Ensuring clear communication among project teams and stakeholders.
  7. Ongoing monitoring during development for strict quality assurance.

3.2 Success Criteria

Define the criteria for determining the success of the POC.

Stakeholders

4.1 Stakeholder List

  1. Taylor Brown (Stakeholder Representative)
  2. Sam Lee (Business Analyst)
  3. Chris Smith (Quality Assurance Manager)
  4. Jessica Davis (Technical Lead)
  5. Alex Johnson (Project Manager)

Requirements

5.1 Functional Requirements

  1. Robust backend support for the IT team.
  2. Advanced analytics features for the marketing team.
  3. Resource allocation and potential staffing considerations.
  4. Implementation of stringent security measures.
  5. Agile project management techniques.
  6. Combined automated and manual testing for quality assurance.

5.2 Non-Functional Requirements

  1. Detailed cost-benefit analysis post-implementation.
  2. Modular capabilities for future expansions.

Assumptions and Constraints

6.1 Assumptions

  • List assumptions made during the POC planning.

6.2 Constraints

  • Describe any constraints, such as budget, time, or technology limitations.

Risks and Mitigation

7.1 Identified Risks

  1. Data breaches
  2. Project delays
  3. Lack of user acceptance
  4. Technical debt

Dependencies

8.1 Dependencies

  • List any dependencies relevant to the POC.

Glossary

  • Define key terms and acronyms used in the document.

Additional Comments:

  • Jessica Davis (Technical Lead): Technically, we should consider the possibility of future expansions. This means building in modular capabilities so new features can be added as customer needs evolve without major disruptions to the existing system.
  • Taylor Brown (Stakeholder Representative): Finally, from a business perspective, we need a detailed cost-benefit analysis post-implementation to measure whether the project has met its ROI targets and how it has impacted customer metrics and overall business operations.
  • Alex Johnson (Project Manager): With all these points in detail, our next steps are to draft a comprehensive project plan that includes timelines, budgeting, and resource allocation based on today�s discussion. Let�s aim to have that ready by next week�s meeting.